• Title/Summary/Keyword: Database of planning and management system

Search Result 170, Processing Time 0.023 seconds

Knowledge-based Decision Support System for Process Planning in the Electric Motor Manufacturing (전동기 제조업의 지식기반 공정계획 지원시스템에 관한 연구)

  • Song, Jung-Su;Kim, Jae-Gyun;Lee, Jae-Man
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.159-176
    • /
    • 1998
  • In the motor manufacturing system with the properties of short delivery and order based production, the process plan is performed individually for each order by the expert of process plan after the completion of the detail design process to satisfy the specification to be required by customer. Also it is hard to establish the standard process plan in reality because part routings and operation times are varied for each order. Hence, the production planner has the problem that is hard to establish the production schedule releasing the job to the factory because there occurs the big difference between the real time to be completed the process plan and the time to be required by the production planner. In this paper, we study the decision supporting system for the process plan based on knowledge base concept. First, we represent the knowledge of process planner as a database model through the modified POI-Feature graph. Then we design and implement the decision supporting system imbedded in the heuristic algorithm in the client/server environment using the ORACLE relational database management system.

  • PDF

Web-based Data Integration System Implementation for Reliability Improvement of a Product (제품의 신뢰성 향상를 위한 웹 기반 데이터 통합 시스템 구축에 관한 연구)

  • Kyung, Tae-Won;Kim, Sang-Kuk
    • Information Systems Review
    • /
    • v.7 no.2
    • /
    • pp.117-128
    • /
    • 2005
  • This study proposes an integrated monitoring system for data reliability improvement in a steel manufacturing industry. The data obtained from existing steel manufacturing process is not micro data which is gathered at the occurring point, but average value (macro data) which is gathered from the occurring point to ending point. This kind of macro data is not only difficult for a detailed analysis for an error causing factor, but it might cause a fatal influence as well on the quality of produced goods even if the error is within an error tolerance. And during the process of steel production, thousands of data is produced in a second, thus requiring database plan to manage abundant amount of data. Therefore, the following proposed system is capable of collecting as well as analyzing all the data generated from the process of product production. And the system was able to raise the efficiency of the database server by planning the database to handle large capacity data. Also, by applying web-based technology, inquiries and analysis of data with no limit on time and space was possible with PC connected to the intranet. Hence, the system was able to work on effective quality improvement of manufactured products, plus able to raise the reliability of the product. Also, accumulated data from long period of time was used for fundamental material for new controlling model, operation technology, and new product development.

Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System (건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.170-181
    • /
    • 2008
  • Cost of construction project have to be estimated based on drawing before execution. Cost estimate and check would be performed numerously for preparing general outline of requirements and determining the budget at conceptual planning stage, for obtaining decision on every matter related to design, specification, construction and cost at design stage, and for predicting bidding cost. Thus, importance of cost estimation cannot emphasize too much in construction. However, there are lack of standard estimation method, process, and cost analysis method, that square foot estimation method is as used as eyer, in Korea. Thus, This research present the direction for improving cost estimation and management in construction; It is demanded that establishing standard data base methodology, multi-level database model CUBE, and standard cost planning process, choosing cost estimation methodology according to objectives and cost planning process, and making more experts.

The Development of a Machine-Parts Production Management System Based on XML for Productivity Improvement (생산성 증대를 위한 XML 기반 기계부품 생산관리시스템 개발)

  • Oh Am-suk
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.8
    • /
    • pp.1851-1858
    • /
    • 2004
  • The goal of this paper is to develop a production management system based on XML that exclusively applies to a production line of machine-parts. This paper aims to develop the related management modules and integrate them into the production management system based on XML technology. In terms of the implementation of the client/server database module, it develops the GUI application program that supports the communication between the subsystem that controls machine-parts and the server-side database. By developing the RPC emulator, the system remotely executes server module in the client GUI module. By developing the integration control module that integrates the independently executed modules, it controls the production management system that works as a single organic management system and by developing the POP system, it builds the information system of machine-parts performance records. This information system collects performance data through the serial port of the sensor attached to the machine-parts manufacturing machine, analyzes these data and display them in the GUI fashion, and immediately reflects them in production planning. And also it develops production management system based on XML by using XML technology.

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Geographic Information Database for Facilitating Regional Development (지역개발 활성화를 위한 지리정보 DB 연구)

  • Kim, Hang-Jib;Choi, Bong-Moon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.5 no.2
    • /
    • pp.69-80
    • /
    • 2002
  • GIS is essential to regional development and management in informatization age. But utilization of GIS in Korea remains still elementary area of automated mapping or facility management. In this paper, we suggest executable principles that are able to enhance and improve the efficiency of regional development affairs using GIS DB. In order to accomplish the role of planning support tool, GIS DB have to be plentiful geographic contents. Metadata DB, user-friendly application interface and compatibility of data between the public and the private must be constructed in GIS DB. And geographic information should be shared between the public and the private.

  • PDF

Decision Making Support System for Water Supply Facilities Planning using Geographic Information System (GIS를 이용한 상수도(上水道) 계획(計劃) 의사결정(意思決定) 지원(支援)시스템 연구(硏究))

  • Ha, Sung-Ryung;Kim, Ju-Hwan
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.3 no.2 s.6
    • /
    • pp.101-113
    • /
    • 1995
  • In pipeline planning, the systematic and reasonal management of topographical and spatial data are needed in order to omprove the availibilities for data analysis and the effective combinations of spatial informations. According to that fact, DBMS (Database Management System) and DSS(Decision making Support System) have to be developed for the planning of water supply system Also, the economic selection for harmonious delivery of water to target area, since the alternatives of pre-designed pipeline are influenced by hydraulic stability and geographic characteristics. In this study, GIS technique for water supply planning and management which stores graphic features and attributes as digital data sets is considered and engineering application programs are integrated for effective planning of water supply system. Decision making support system based on analyzing technical, Social and economical aspects is developed for the extension of water supply facilities and pipeline configurations. Especially, Hydraulic, land-use and economic influences are considered as important factors for the purpose of developing the system. Hydraulic analysis program(SAPID) for pipeline flow which is already developed in Water Resources Research Institute and economic analysis program(ECOVEL) are integrated with GIS for resonable decision making. Every possible aspects in pipeline planning for water supply is reviewed and the applicabilities of developed system into the field are evaluated.

  • PDF

A Study on the Evaluation of Urban Land Use by Urban Land Use Information System (도시토지이용정보체계에 의한 도시토지이용평가에 관한 연구)

  • 고준환
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.14 no.1
    • /
    • pp.97-110
    • /
    • 1996
  • The purpose of this study is to evaluate the urban land used by the Urban Land Use Information System (ULIS) which can supply the micro-level land usc information for the understanding of micro-level urban spatial structure and district-level planning and managements(such as urban design, redevelopment planning and district-level transportation planning, etc.). The study evaluates the current situation of urban land use database and suggests the prototype of urban land use database using GIS. The planning and management of post-modern city which has characterized by diversity and the mixture of land use, need more detail and quantitative information about land use. Recent redevelopment and reconstruction of existing physical condition are increasing the density of activity. It raises urban problems such as the shortage of infrastructure and traffic congestion, etc. In this process we need to construct information system which monitors current land use situation.

  • PDF

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

Design and Implementation of e-Logistics System supporting Efficient Moving Objects Trajectory Management (효율적인 차량 궤적 관리를 지원하는 물류관리시스템의 설계 및 구현)

  • Lee, Eung-Jae;Nam, Kwang-Woo;Ryu, Keun-Ho
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.2
    • /
    • pp.30-41
    • /
    • 2006
  • This paper proposes an e-logistics system supporting efficient vehicle moving trajectory management. Recent advances in wireless communications have given rise to a number of location-based services including logistics vehicle tracking, cellular phone user's location finding, and location-based commerce. Logistics systems typically entail tracking vehicles for purposes of the logistics center knowing the whereabouts of the vehicles and/or consignments. Moreover, storing and managing location trajectory of continuously moving vehicles and consignments is necessary for supporting efficient logistics plan and consignment. The proposed system is able to manage spatial objects in GIS as well as logistic information in the mobile environment. And for the efficiently managing and retrieving of transporting trajectory of logistics, we extend previous moving object indexing method, TB-Tree, to use multi-version framework and evaluate data updating performance. It is able to apply the proposed method to develop mobile contents services based on continuously changing location of moving object in the mobile environment.

  • PDF