• Title/Summary/Keyword: D-optimal Design

Search Result 1,316, Processing Time 0.026 seconds

Optimization of Ingredients for the Preparation of Chinese Quince (Chaenomelis sinensis) Jam by Mixture Design (모과잼 제조시 혼합물 실험계획법에 의한 재료 혼합비율의 최적화)

  • Lee, Eun-Young;Jang, Myung-Sook
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.38 no.7
    • /
    • pp.935-945
    • /
    • 2009
  • This study was performed to find the optimum ratio of ingredients in the Chinese quince jam. The experiment was designed according to the D-optimal design of mixture design, which included 14 experimental points with 4 replicates for three independent variables (Chinese quince paste $45{\sim}60%$, pectin $1.5{\sim}4.5%$, sugar $45.5{\sim}63.5%$). A mathematical analytical tool was employed for the optimization of typical ingredients. The canonical form and trace plot showed the influence of each ingredient in the mixture against final product. By use of F-test, sweetness, pH, L, b, ${\Delta}E$, and firmness were expressed by a linear model, while the spreadmeter value, a, and sensory characteristics (appearance, color, smell, taste, and overall acceptability) were by a quadratic model. The optimum formulations by numerical and graphical method were similar: Chinese quince paste 54.48%, pectin 2.45%, and sugar 53.07%. Optimum ingredient formulation is expected to improve use of Chinese quince and contribute to commercialization of high quality Chinese quince jam.

Long Term Operation of Microfiltration Membrane Pilot Plant for Drinking Water Treatment (정수처리를 위한 정밀여과막 모형플랜트의 장기운전 특성)

  • Kim, Chung H.;Lee, Byung G.;Lim, Jae L.;Kim, Seong S.;Lee, Kyeong H.;Chae, Seon H.
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.4
    • /
    • pp.493-501
    • /
    • 2007
  • The membrane pilot plant has being operated in the Hyeondo pumping station to find the optimal operation technique of Gong-Ju membrane water treatment plant (WTP) which is constructing in $250m^3/d$ scale. The pilot plant was consisted of two trains which can treat $30,000m^3/d$ per train. First train was operated for one year under the condition of flux $1m^3/m^2{\cdot}d$ while the effects of flux variation and addition of powdered activated carbon(PAC) were evaluated in second train. The turbidity of membrane product water of first train which is operated on Flux $1m^3/m^2{\cdot}d$ was always below 0.05 NTU regardless of raw water turbidity. And also, the trance-membrane pressure(TMP) was maintained at $0.3{\sim}0.5kgf/cm^2$ for about 9 months and increased rapidly to $1.8kgf/cm^2$ which is maximum operating TMP. However, TMP was rapidly increased to $1.8kgf/cm^2$ within 2 months as flux was increased from 1 to $2m^3/m^2{\cdot}d$, especially, within 10 days under high turbidity(30~50NTU). This reault means that if Gongju membrane WTP is operated in flux $1m^3/m^2{\cdot}d$, chemical cleaning period can be maintained over 6 months. Only 10% of dissolved organic carbon (DOC) was removed in membrane process while the removal efficiencies of manganese and iron were 60% and 77% respectively. However, because only solid manganese and iron were removed in membrane process, an additional process for treating soluble manganese is required if souble manganese is high in raw water. 70% of 70ng/L 2-MIB which is causing taste & odor was removed in powdered activated carbon (PAC) tank with 50mg/L PAC which is design concentration of Gongju WTP. In addition, TMP was reduced with addition of 50mg/L PAC regardless of flux. Because TMP was not influenced even if 100mg/L PAC was added, the high taste and odor problem can be controled by additional injection of PAC.

A Simulation Study of the Inset-fed 2-patch Microstrip Array Antenna for X-band Applications (X-band 대역용 2-패치 마이크로스트립 인셋 급전 어레이 안테나 시뮬레이션 연구)

  • Nkundwanayo Seth;Gyoo-Soo Chae
    • Advanced Industrial SCIence
    • /
    • v.3 no.2
    • /
    • pp.31-37
    • /
    • 2024
  • This paper presents a single and 2-patch microstrip array antenna operated on a frequency of 10.3GHz(x-band). It outlines the process of designing a microstrip patch array antenna using CST MWS. Initially, a single microstrip antenna was designed, followed by optimization using CST MWS to attain optimal return losses and gain. Subsequently, the design was expanded to create a 2×1 microstrip inset-fed array antenna for the X-band applications. The construction material is Roger RO4350B, with specific dimensions (h=0.79mm, 𝜖r = 3.54). The achieved results include an S11 of -18dB at the resonant frequency (10.3GHz), a gain of 9.82dBi, a bandwidth of 0.165GHz, and a 3-dB beamwidth of 30°, 121° in Az(𝜑=0) and El(𝜑=90) plane, respectively. The future plan involves the fabrication of this array antenna and further expansion to a 4×4 array of microstrip antennas. It is then incorporated on the X-band applications for practical uses.

Preliminary Study of Modulization Construction Method on Concrete Structure for High-rise Building (고층 콘크리트 구조물 모듈화 시공 시스템 기초연구)

  • Koh, Min-Hyeok;Cho, Chang-Yeon;Shin, Tae-Hong;Kwon, Soon-Wook;Kim, Yea-Sang;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Construction that over 70% of the structure consists of concrete gets bigger and higher gradually and the demand of that is increasing as well. However, it's not easy to supply young and skilled persons on construction site because of social avoidance phenomena about 3D occupation, so it causes serious problems like aging and shortage of technicians. To solve the problems, executives related to the construction field make a management effort in various ways such as construction period shortening, labor productivity improvement and good quality but recently, they have an increasing interest in the necessity of the modularization of the high-rise building and the automation of the engineering development for the strengthening of international competitive power as more active and long-term alternatives. Therefore, this study is to propose the roadmap in order to make lots of efforts in developing construction technologies of high-rise buildings by performing a foundation study, the strategy for 4-step research development, on modularized construction system of concrete structure of high-rise buildings through domestic and foreign preceding research analyses associated with optimal design modularization technique, module factory automation and assembly automation of modularized objects.

  • PDF

An Efficient Subsequence Matching Method Based on Index Interpolation (인덱스 보간법에 기반한 효율적인 서브시퀀스 매칭 기법)

  • Loh Woong-Kee;Kim Sang-Wook
    • The KIPS Transactions:PartD
    • /
    • v.12D no.3 s.99
    • /
    • pp.345-354
    • /
    • 2005
  • Subsequence matching is one of the most important operations in the field of data mining. The existing subsequence matching algorithms use only one index, and their performance gets worse as the difference between the length of a query sequence and the site of windows, which are subsequences of a same length extracted from data sequences to construct the index, increases. In this paper, we propose a new subsequence matching method based on index interpolation to overcome such a problem. An index interpolation method constructs two or more indexes, and performs search ing by selecting the most appropriate index among them according to the given query sequence length. In this paper, we first examine the performance trend with the difference between the query sequence length and the window size through preliminary experiments, and formulate a search cost model that reflects the distribution of query sequence lengths in the view point of the physical database design. Next, we propose a new subsequence matching method based on the index interpolation to improve search performance. We also present an algorithm based on the search cost formula mentioned above to construct optimal indexes to get better search performance. Finally, we verify the superiority of the proposed method through a series of experiments using real and synthesized data sets.

Scenario-Based Implementation Synthesis for Real-Time Object-Oriented Models (실시간 객체 지향 모델을 위한 시나리오 기반 구현 합성)

  • Kim, Sae-Hwa;Park, Ji-Yong;Hong, Seong-Soo
    • The KIPS Transactions:PartD
    • /
    • v.12D no.7 s.103
    • /
    • pp.1049-1064
    • /
    • 2005
  • The demands of increasingly complicated software have led to the proliferation of object-oriented design methodologies in embedded systems. To execute a system designed with objects in target hardware, a task set should be derived from the objects, representing how many tasks reside in the system and which task processes which event arriving at an object. The derived task set greatly influences the responsiveness of the system. Nevertheless, it is very difficult to derive an optimal task set due to the discrepancy between objects and tasks. Therefore, the common method currently used by developers is to repetitively try various task sets. This paper proposes Scenario-based Implementation Synthesis Architecture (SISA) to solve this problem. SISA encompasses a method for deriving a task set from a system designed with objects as well as its supporting development tools and run-time system architecture. A system designed with SISA not only consists of the smallest possible number of tasks, but also guarantees that the response time for each event in the system is minimized. We have fully implemented SISA by extending the ResoRT development tool and applied it to an existing industrial PBX system. The experimental results show that maximum response times were reduced $30.3\%$ on average compared to when the task set was derived by the best known existing methods.

A Study on the Design of the Terminal Repeater System for 565 Mb/s Optical Fiber Transmission (565 Mb/s 광전송용 단국중계장치 설계에 관한 연구)

  • 유봉선;박병철
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.15 no.10
    • /
    • pp.829-841
    • /
    • 1990
  • On assuming that the transmission speed of the original information is the fifth-order transmission speed of the Korea digital multiplex hierarchy (564.992Mb/s), this paper proposes a new structure of the transmission line frame at the terminal repeater system, in order to not only maintain and conserve 565Mb/s optical fiber transmission system but also make the B.S.I. of digital communication network for the optical transmission. And the structure uses the mBIZ transmission line code, which is considered the optimal transmission line code of conventional transmission line codes. System hardware of the transmission line frame structure proposed in this paper is consisted by a method of pulse stuffing after converting the speed of the original information signal sequence at the terminal repeater system for 565Mb/s optical transmission. As a result of this, we can prevent the optical transmission system from a domino phenomenon, the phenomenon of the continuous error multiplication of systems by the transmission error, and suppress timing jitter and the identical consecutive digit number. And also we can improve SNR of the optical transmission system about 2dB because of raising total BER at the optical terminal system up to 10.

  • PDF

Adaptive FNN Controller for Maximum Torque of IPMSM Drive (IPMSM 드라이브의 최대토크를 위한 적응 FNN 제어기)

  • Kim, Do-Yeon;Ko, Jae-Sub;Choi, Jung-Sik;Jung, Byung-Jin;Park, Ki-Tae;Choi, Jung-Hoon;Chung, Dong-Hwa
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.313-318
    • /
    • 2007
  • Interior permanent magnet synchronous motor(IPMSM) has become a popular choice in electric vehicle applications, due to their excellent power to weight ratio. This paper proposes maximum torque control of IPMSM drive using adaptive fuzzy neural network controller and artificial neural network(ANN). This control method is applicable over the entire speed range which considered the limits of the inverter's current and voltage rated value. For each control mode, a condition that determines the optimal d-axis current $i_d$ for maximum torque operation is derived. This paper considers the design and implementation of novel technique of high performance speed control for IPMSM using Adaptive-FNN controller and ANN controller. The hybrid combination of neural network and fuzzy control will produce a powerful representation flexibility and numerical processing capability. Also, this paper reposes speed control of IPMSM using Adaptive-FNN and estimation of speed using ANN controller. The back propagation neural network technique is used to provide a real time adaptive estimation of the motor speed. The proposed control algorithm is a lied to IPMSM drive system controlled Adaptive-FNN and ANN controller, the operating characteristics controlled by maximum torque control are examined in detail. Also, this paper proposes the analysis results to verify the effectiveness of the Adaptive-FNN and ANN controller.

  • PDF

Optimization of Ballast Depth of Ballasted Track Bridges to Improve Ride Comfort (승차감 향상을 위한 유도상교량의 도상두께 최적화)

  • Kim, Kwan-Hyung;Kwon, Soon-Jung;Kim, Yun-Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.867-874
    • /
    • 2011
  • The ballast abrasion occurs on the ballasted track upon bridges more than soil roadbed because the track vibration occurs a lot in the ballasted track upon bridges due to girder vibration when a train's weight is loaded onto track even though the identical ballast is used. The phenomena of mud pumping especially, which occurs when drainage is not properly secured for heavy rain, leads to the increase of maintenance work load and the decline of ride comfort. The ballast thickness range in domestic railroad construction rule is uniformly set up according to the design speed of railroad and passing tonnage of train without considering field conditions which is considered in foreign railroad companies. The purpose of this study is to verify the effect of vibration decrease by measuring the acceleration, displacement and ride comfort of ballasted track with the change of ballast thickness on the ballast tracked bridges and to suggest the optimal height of ballast on the Yocheon Bridge built for the test in Honam Line.

Optimal Design of Controller for Ultra-Precision Plane X-Y Stage (초정밀 평면 X-Y 스테이지의 최적제어기 설계)

  • Kwak, L. K.;kim, J. Y.;Yang, D. J.;Ko, M. S.;You, S.;Kim, K. T.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.342-347
    • /
    • 2002
  • After the industrial revolution in 20 century, the world are preparing for new revolution that is society with knowledge for a basis such as IT(Information Technology), NT(Nano Technology) and BT(Bio Technology). Recently, NT is applied to various fields that are composed of science, industry, media and semiconductor-micro technology. It has need of IT that is ultra-precision positioning technology with strokes of many hundreds mm and maintenance of nm precision in fields of ultra micro process, ultra precision measurement, photo communication part and photo magnetic memory. Performance test of servo control system that is used ultra-precision positioning system with single plane X-Y stage is performed by simulation with Matlab. Analyzed for previous control algorithm and adapted for modern control theory, dual servo algorithm is developed by minimum order observer, and stability and priority on controller are secured. Through the simulation and experiments on ultra precision positioning, stability and priority on ultra-precision positioning system with single plane X-Y stage and control algorithm are secured by using Matlab with Simulink and ControlDesk made in dSPACE

  • PDF