• 제목/요약/키워드: Cut-and-cover railway tunnel

검색결과 8건 처리시간 0.026초

일본 도시철도 개착식 터널의 내진성능 평가 방법에 대한 고찰 (A Study on Evaluation Method of Seismic Performance on Cut and Cover Tunnel of Subway in Japan)

  • 박범호;이우철;김진호;임남형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.15-19
    • /
    • 2009
  • Due to the Japan's Kobe earthquake in 1995, a cut-and-cover tunnel, which is one of subway facilities, collapsed unexpectedly. As a result, also in Korea, seismic performance needs to be secured for the cut-and-cover tunnel and currently, the subway seismic design standard is based on the seismic performance. However, there is no standard for the damage level or stability level of a member for securing the seismic performance, and the definition of multi-level seismic performance is not sufficient. By contrast to this situation, in the Japan's evaluation method of seismic performance, design earthquake ground motion having reflected there into the subway driving stability is clearly defined and the seismic performance required for structures is classified in detail. This study analyzes the Japan's systematic evaluation method of seismic performance for cut-and-cover tunnels of subway.

  • PDF

개착식 철도 터널 구조물의 기존 지진취약도 모델 적합성 평가 (Evaluation of seismic fragility models for cut-and-cover railway tunnels)

  • 양승훈;곽동엽
    • 한국터널지하공간학회 논문집
    • /
    • 제24권1호
    • /
    • pp.1-13
    • /
    • 2022
  • 본 연구에서는 기존에 개발된 개착식 철도 터널의 지진취약도 모델들을 가중 조합하여 새로운 모델을 제시하고 제시한 모델의 적정성을 평가하였다. 지진취약도 함수의 형태는 최대지반가속도의 대수정규분포형태로, 누적확률분포로 표현된다. 독립적으로 개발된 각 모델을 선형 가중 조합하는 것으로 모델의 불확실성을 줄일 수 있기에 4개의 모델에 대하여 25%씩 동등하게 선형가중을 부여하였다. 조합된 지진취약도 곡선에 최대 지반가속도에 대한 피해발생확률을 이용하여 지진취약도 곡선의 중앙값과 표준편차를 결정하여 새로운 지진취약도 함수를 개발하였다. 개발된 지진취약도 함수의 적합성을 평가하기 위하여 다양한 터널의 지진취약도 곡선과 비교 분석을 진행하였다. 개발된 곡선은 상대적으로 지진피해에 안전한 굴착식 터널의 지진취약도 함수와 비슷한 취약도를 갖는 것으로 나타나는데, 대상 터널은 국내 고속철도 개착식 터널로 높은 내진설계 기준에 의해 기인하는 것으로 판단된다.

NATM 터널의 대심도 풍화대층에서의 지반거동 및 보강방법 (Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone)

  • 성화돈;안정환;천병식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1782-1788
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analysis of failure rate and vertical stress ratio show that the tunnel for which the height of the cover(H) was higher than four times the diameter, it can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods were showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than where using Ring-cut split method. In addition the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

  • PDF

도시철도 개착식 구조물의 설계기준별 하중조합 및 단면력 검토 (Study of Load Combination and Member Force of Cut and Cover Tunnel by Design Codes)

  • 허진호;김진호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1185-1190
    • /
    • 2011
  • In designing cut and cover tunnels, load combination applied Korea seismic design code of urban transit and its sections applied Korea concrete code 2003. However, by revision of Korea concrete code in 2007, engineers have been experiencing difficulties in their work. In this study, application of Korea concrete code 2007 for designing is reviewed by comparing load combination of related codes and member force.

  • PDF

서울 지하철 9호선의 개착구조물에 대한 가치공학 평가 (THE VALUE ENGINEERING REVIEW OF THE CUT AND COVER TUNNEL FOR THE SEOUL SUBWAY LINE 9)

  • 송석준;구자갑;김은겸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.957-964
    • /
    • 2004
  • The selected structure for the value engineering review is one section of cut and cover tunnel for Seoul Subway Line 9. The primary focus of the review is on the optimisation of the structures to save cost on the existing Line 9 contracts through variation of the design criteria as it affects the permanent works. This is to be achieved through comparison with design criteria for other selected international subways. Criteria resulting from the review must not compromise public safety and durability for the 100 year design life.

  • PDF

소일시멘트 복토후 터널굴착에 대한 사례 연구 (A Case Study of Soil-Cement Fill for Tunneling)

  • 신일재;강준호;서영호
    • 터널과지하공간
    • /
    • 제15권5호
    • /
    • pp.359-368
    • /
    • 2005
  • NATM 터널을 굴착하기에 토피가 너무 낮은 경우에는 보통 개착터널공법이 적용된다. 그러나 토피가 매우 낮거나 없는 계곡부에서 개착터널을 시공하기 위해서는 추가적인 두 곳의 갱구 형성과 복토가 이루어질 때까지 임시 사면에 대한 유지관리가 필요하다. 이런 경우에는 복토를 통해 토피를 확보한 후 터널을 굴착하는 방안이 유효하다. 이 연구는 터널 굴착이전에 소일시멘트로 복토한 후 굴착작업이 이루어진 대만고속철도 C240현장에 대한 사례 연구이다. 소일시멘트의 포틀랜드 시멘트 함유량은 $2\~4\%$이고, 1회 복토층의 두께는 $130\~250\;mm$ 범위가 되도록 시공하였다. 터널 굴착에 따른 소일시멘트 사면 및 터널내 최종 구조물인 콘크리트 라이닝에 대한 수치해석을 통해 안정성을 평가하였다.

대만 고속전철에 적용한 NATM 터널설계 (NATM Tunnel Designs in Taiwan High Speed Rail Project)

  • Kim, Dal-Sun
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.424-430
    • /
    • 2001
  • 현대건설(주)는 사업 주관사로서 해외 업체와 대만고속전철 턴키 공사를 2000 년 1 월에 공동으로 수주하였다. 고속전철의 총 연장 길이는 약 326 km 이며, 정거장 10 개소, Depot 및 야적장으로 구성되어 있다. 이번에 수주한 공구는 2 개의 연속된 공구 (C230, C240) 이며, 본 논문은 총 연장 23.6km 인 C230 공구에 대한 설계 과정을 수록하였다. C230 공구는 NATM 터널 (6.2km), Cut-and-Cover 터널 (0.5km), 교량 (7.8km) 및 토공 구간 (9.1km)으로 구성되어 있다. 전 구간의 지반조건은 "매우" 취약한 매질로 구성되어 있으며, 층리나 절리는 거의 발달되어 있지 않다. 따라서 화약발파에 의한 터널 굴착은 기계식 굴착 (Back-hoe Excavation) 방법에 비하여 현실성이 없는 것으로 분석되었다. 취약한 지반에서 계측 결과를 기준으로 굴착 공간을 안전하게 유지할 수 있는 NATM 보강 설계가 현지 암반조건에 가장 이상적인 방법으로 제시되었다. 특히, NAT설계는 대형 아파트 지역과 파쇄대 및 지하수 침투 예상지역을 통과하기 위하여 계측에 의한 Feed-back 과정을 탄력적으로 적용하도록 계획하였다.

  • PDF

기존 고속철도 터널의 지진취약도 함수 개발에 관한 연구 (A Study on the Development of the Seismic Fragility Functions of the High Speed Railway Tunnels in use)

  • 김홍균;신철식;이태형;이종건;박두희
    • 한국지반환경공학회 논문집
    • /
    • 제15권11호
    • /
    • pp.67-75
    • /
    • 2014
  • 본 연구에서는 공용 중인 91개 고속철도 터널을 대상으로 단계별 내진성능평가를 실시하여 설계기준에서 제시하는 목표 내진성능 확보여부를 검토하였다. 또한 지진취약도 함수도 함께 개발하여 지진규모에 따른 시설물의 확률론적 피해예측이 가능하도록 하였다. 단계별 내진성능평가는 내진성능 예비평가 및 상세평가 순으로 실시하였으며, 평가결과 대상터널들은 설계기준 수준의 내진성능을 확보하는 것으로 분석되었다. 지진취약도 함수는 최대지반가속도(Peak Ground Acceleration, PGA)를 기준으로 한 대수 정규분포형태로 설정하였으며, 함수도출방법은 설계 PGA수준에 대한 손상발생확률을 이용하여 취약도함수의 모수를 결정하는 방식으로 하였다. 손상발생 검토부재는 라이닝콘크리트로서, 대상터널을 굴착식 터널(NATM 터널) 및 개착식 터널로 구분하여 각각에 대한 손상수준별 지진취약도 함수를 개발하였다. 이번연구에서 도출된 지진취약도 함수와 기존연구결과(FEMA, 2004)와의 비교 분석을 통하여 대상터널의 내진성능확보수준을 평가하였으며, 그 결과 대상터널이 기존연구의 대상인 재래식 터널(American Steel Support Method, ASSM)에 비하여 상대적으로 내진성능이 우수한 것으로 분석되었다.