• Title/Summary/Keyword: Customer interruption cost assessment

Search Result 16, Processing Time 0.026 seconds

Customer Interruption Cost Assessment of Domestic Residential Customer Using Customer Survey (설문조사방법을 이용한 가정용 수용가 정전비용 평가)

  • Lee, Byung-Sung;Chu, Cheol-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1792-1796
    • /
    • 2010
  • In this paper, the survey results of the interruption on domestic residential customer with primary focus on the cost are presented. General method utilized in quantifying the benefit of reliability on power system is to estimate the Customer Interruption Cost(CIC) associated with the electric service interruption. According to change the circumstance of electricity market by the deregulation and the introduction of new technology, reliable and accurate CIC is required for estimate the applied plan and technology under the circumstance. This paper presents the residential customer interruption cost is estimated by the survey conducted by KEPCO in 2009. To collect the customer interruption data for calculation of CIC, the survey is conducted. The survey targeting residential customer around the branch-offices under twelve regional headquarters of KEPCO was carried out.

A Customer Interruption Cost Assessment Using Customer Survey (설문 조사방법을 이용한 수용가 정전비용 평가)

  • Chu, Cheol-Min;Lee, Byung-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1787-1791
    • /
    • 2010
  • This paper presents the survey results of the interruption on domestic customer, especially commercial, with primary focus on the cost are presented. General method utilized in quantifying the benefit of reliability on power system is to estimate the Customer Interruption Cost(CIC) associated with the electric service interruption. According to change the circumstance of electricity market by the deregulation and the introduction of new technology, reliable and accurate CIC is required for estimate the applied plan and technology under the circumstance. This paper presents the commercial customer interruption cost is estimated by the survey conducted by KEPCO in 2009. To collect the customer interruption data for calculation of CIC, the survey is conducted. The survey targeting commercial customer around the branch-offices under twelve regional headquarters of KEPCO was carried out.

A Survey Study on the Assessment of Customer Interruption Costs Using Macro Economic Methodology in Korea

  • Park, Sang-Bong
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.1
    • /
    • pp.6-10
    • /
    • 2004
  • This paper presents an assessment of the customer interruption costs using a macro economic methodology of Korean customers by cities and provinces. The customer interruption cost is considered a very useful index in quantifying reliability worth from a customer point of view. This paper reviews the methodology to evaluate the customer interruption costs and ratio to the average revenues per electric energy sold for public, service agriculture, fishery, mining, manufacturing and residential sectors by cities and provinces in Korea.

Assessment of Interruption Costs for Public Customers

  • Choi Sang-Bong
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.2
    • /
    • pp.186-192
    • /
    • 2005
  • As the power industry moves towards open competition, there has been a call for methodology to evaluate power system reliability by using customer interruption costs. This paper presents an evaluation of the interruption costs for public customers in Korea using customer survey methodology. When various research results are examined, the evaluation of direct interruption costs becomes much more simplified. Especially, in the case of public customers, it is known that the evaluation of direct interruption costs is more useful. Accordingly, this paper selected the customer survey method to evaluate the interruption costs for public customers in Korea considering interruption and customer characteristics.

Assessment of Interruption Costs by Industrial Customer Type

  • Choi, Sang-Bong
    • Journal of Electrical Engineering and Technology
    • /
    • v.1 no.4
    • /
    • pp.448-454
    • /
    • 2006
  • As the power industry moves towards open competition, a need has arisen for appropriate methodology to evaluate power system reliability by using customer Interruption costs. This paper presents an assessment of the interruption costs by industrial customer type in Korea using customer survey methodology. When various research results are examined, the customer damage survey methodology becomes much more generalized. Especially, in the case of industrial customers, it is known that evaluation by the customer damage survey is more useful. Accordingly, this paper selected the customer damage survey method to evaluate the interruption costs by industrial customer type in Korea considering interruption and customer characteristics.

Assessment of Reliability in the Distribution System of an Industrial Complex

  • Choi, Sang-Bong
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.2
    • /
    • pp.201-207
    • /
    • 2007
  • As the power industry moves towards open competition, there has been a need for methodology to evaluate distribution power system reliability by using customer interruption costs, particularly in power supply zones under the competitive electricity market. This paper presents an algorithm to evaluate system average interruption duration index, expected energy not supplied, and system outage cost taking into consideration failure rate of the distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, the distribution arrangement of a dual supply system consisting of mostly high voltage customers in an industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index, and expected energy not supplied in the sample industrial complex area are shown in detail.

A Study on Distribution System Assessment and Interruption Cost Calculation for the Industry Load by the Analytic Approach Method (해석적방법론에 의한 산업용 수용가의 공급지장비 산정 및 배전계통에의 적용)

  • Kim, Yong-Ha;Woo, Sung-Min;Baek, Byum-Min;Sin, Hyung-Chul;Park, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.4
    • /
    • pp.47-55
    • /
    • 2009
  • This paper estimates interruption cost assessment for industrial load. For executing In this way first, we research customer interruption cost(CIC) for industrial load about 1,026 unit. And to assess industrial load in D/L calculate sector customer damage function(SCDF) using CIC. Second, we compute distribution reliability through annual failure rate, repair time and so on, and then, Third, distribution system that calculate VBDRA for industrial load per alternative assesses interruption cost.

Assessment of Interruption Costs for Residential Customers (주택용 수용가의 정전비용 평가 연구)

  • 박충열;최상봉;허창수
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.4
    • /
    • pp.131-137
    • /
    • 2004
  • The impacts of electric service interruption to customers depend on customer and interruption characteristics. Customer characteristics include demographic aspects (residential type, and number of household members) and power supply types whereas interruption characteristics include frequency, duration, time, and day of interruption. Accordingly evaluation of these customer interruption costs is very complicated and subjective. For residential customers, customer survey method seems most appropriate because interruption impact to residential customers is intangible. In other. words, the value of housework or lost leisure due to interruption is individual. Accordingly, this paper selected the customer survey method to assess the interruption costs for residential customers.

Investigation and Assessment of Interruption Costs for Livestock Customers in Korea (국내 축산업 수용가의 정전비용 조사 및 평가)

  • Choi, Sang-Bong;Nam, Ki-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Rhoo, Hee-Seok;Lee, Jae-Duk
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.347-349
    • /
    • 2005
  • This paper presents the results of an investigation and assessment of the direct short term impacts of electric service interruption incurred by livestock customers. The study used a direct visit survey to determine the customer assessment of electric service interruption and characteristic. The variation in interruption cost with the characteristics of interruptions such as duration, time of day, frequency, and day of interruption was also investigated.

  • PDF

Investigation and Assessment of Interruption Costs for Public Customers in Korea (국내 공공용 수용가의 정전비용 조사 및 평가)

  • Choi, Sang-Bong;Nam, Ki-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Rhoo, Hee-Seok;Lee, Jae-Duk
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.350-352
    • /
    • 2005
  • This paper presents the results of an investigation and assessment of the direct short term impacts of electric service interruption incurred by public customers. The study used a direct visit survey to determine the customer assessment of electric service interruption and characteristic. The variation in interruption cost with the characteristics of interruptions such as duration, time of day, frequency, and day of interruption was also investigated.

  • PDF