Browse > Article
http://dx.doi.org/10.5370/JEET.2007.2.2.201

Assessment of Reliability in the Distribution System of an Industrial Complex  

Choi, Sang-Bong (Power Technology Team, Power System Division, KERI)
Publication Information
Journal of Electrical Engineering and Technology / v.2, no.2, 2007 , pp. 201-207 More about this Journal
Abstract
As the power industry moves towards open competition, there has been a need for methodology to evaluate distribution power system reliability by using customer interruption costs, particularly in power supply zones under the competitive electricity market. This paper presents an algorithm to evaluate system average interruption duration index, expected energy not supplied, and system outage cost taking into consideration failure rate of the distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, the distribution arrangement of a dual supply system consisting of mostly high voltage customers in an industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index, and expected energy not supplied in the sample industrial complex area are shown in detail.
Keywords
Competitive Electricity Market; Failure Rate; Industrial complex; System Expected Energy Outage Cost; System Interruption Cost; System Average Interruption Duration Index;
Citations & Related Records
연도 인용수 순위
  • Reference
1 M.J. Sullivan, 'Interruption Costs, Customer Satisfaction and Expectations for Service Reliability', IEEE Trans. on Power Systems, Vol. 11, No. 2, 1996   DOI   ScienceOn
2 Koichi Nakamura, Susumu Yamashiro, 'A Survey Study on Estimation of Customer Interruption Costs', T. IEE Japan, Vol. 119-B, No. 2
3 Koichi Nakamura, Susumu Yamashiro, 'A Study on the Estimation of Power System Reliability taking into account Interruption Costs', PE-97-61
4 S.B. Choi, 'A Study to Investigate Industrial Customers Interruption Cost for Power System Planning in Korea', KERI, R&D Project, Report R- 2005-0-001-01, 2005
5 R. Billinton, Allan. R.N, 'Power System Reliability in Prospective', IEE J. Electron. Power, Vol. 30, Mar. 1984
6 Billinton, J. Oteng-Adjei, R. Ghaja, 'Comparison of Two Alternative Methods to Establish an Interrupted Energy Assessment Rate', IEEE, Trans. on Power Systems, Vol. PWRS-2, No. 3, August 1987
7 M. J. Sullivan, 'Interruption Costs, Customer Satisfaction and Expectations for Service Reliability', IEEE Trans. on Power Systems, Vol. 11, No. 2, May 1996   DOI   ScienceOn
8 Koichi Nakamura, Susumu Yamashiro, 'A Survey Study on Estimation of Customer Interruption Costs', T. IEE Japan, Vol. 119-B, No. 2
9 Arun P. Sanghvi, 'Measurement and Application of Customer Interruption Cost/Value of Service for Cost-Benefit Reliability Evaluation: Some Commonly Based Issues', IEEE Trans. on Power Systems, Vol. 5, No. 4, Nov. 1990
10 K. Nakamura, S, Yamashiro, 'A Survey Study on Estimation of Customer Interruption Costs', T. IEE Japan, Vol. 119-B, No. 2
11 N. Balu, M. Lauby, 'Cost-Benefit Analysis of Power System Reliability: Determination of Interruption Costs', EPRI EL-6791s Vol. 1-3, 1990
12 Billinton, Allan. R.N, 'Reliability Evaluation of Engineering Systems Concepts and Techniques', 2nd Edition, Plenum Press, New York, 1992
13 Allan. R.N, R. Billinton and Shale, 'Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1977-1982', IEEE Trans. On Power Apparatus and Systems, Vol. PAS- 103, No. 2, Feb. 1984   DOI   ScienceOn
14 R. Billinton, J. Oteng-Adjei, R. Ghaja, 'Comparison of Two Alternative Methods to Establish an Interrupted Energy Assessment Rate', IEEE, Trans. on Power Systems, Vol. PWRS-2, No. 3, 1987