Journal of Construction Engineering and Project Management
/
v.2
no.4
/
pp.11-19
/
2012
Construction supply chain management (CSCM) has become one of the critical factors that determine the success of a construction project as it becomes increasingly complicated and mega-sized. Particularly for high-rise or mega-sized building construction, just-in-time supply chain management is required due to lack of storage space and effective logistics for construction components and materials at a construction site. Despite the fact that research and development of radio frequency identification (RFID) and wireless sensor network (WSN) technology have been performed, construction project managers still need to carry mobile devices and check material and component flow at each stage of the supply chain process. This research proposes that the equipment used in the construction supply chain process, such as movers, trailers, gates, and hoists, can become main actors in the supply chain process using RFID and WSN technologies. And the proposed equipment and process focused on a solution to the redundancy identification problem, which has been observed in operations that use RFID/WSN-based processes for construction logistics. This paper also presents issues identified through verification and validation of the research results and proposes further studies.
This research proposes a framework of buffer management for multi-project systems in the critical chain project management (CCPM) method, expressed in the form of max-plus linear (MPL) representation. Since time buffers are inserted in the projects for absorbing uncertainties in task durations and protecting the completion times, the proposed method provides a procedure for frequently surveying the rates of consumed buffers and the rate of elapsed times. Their relation expresses the performance of the projects which is plotted on a chart through the completed processes. The chart presents the current performance of the projects and their interaction, which alerts managers to make necessary decisions at the right time for managing each project and the entire multi-project system. The proposed framework can analyze the complex system readily, and it enables managers to make an effective decision on scheduling. The effectiveness of the framework is demonstrated through a numerical example.
International conference on construction engineering and project management
/
2011.02a
/
pp.201-208
/
2011
Today's highly competitive construction scenario forces all the major players in the field to take up multiple projects which have put an undue pressure on the resources available within the organization. Under such a situation, there are many instances where in the resource requirement exceeds its availability due to multiple activities (with same resource requirement) which are scheduled to start simultaneously and thus results in the constrained resource becoming a bottleneck of the project. As a consequence of sharing resources, this paper studies the impact on the completion date of two similar projects under two different conditions, the first one resulting in a postponed end date and the second without any postponement. The resource utilization, the possibility of substitution of a resource and its subsequent impact on the deadline of the project is analyzed under these two circumstances. The study is done on a Critical Chain Project Management (CCPM) platform instead of leaving the schedule with a traditional Critical Path Method (CPM) finish, which gives an added advantage of validating the robustness of the emerging CCPM trend in the field of resource management.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.427-431
/
2002
Nowadays in Korea, there has been extreme competition due to market reduction in the domestic construction industry. As a result every company try to change rapidly to secure competitive power, Although it isn't betterment for the way of construction project management then there has many problem such as a delay of the appointed date of delivery and go over the budget. In this study, we suggest an introduction of CCPM which is based on TOC to construction projects.
This paper suggests the design and operation of value stream mapping(VSM) applied to project management, such as R&D, IT Investment. First this study represents design methodology of VSM process using SIPOC(Supplier, Input, Process, Output, Costumer). Second, this paper considers the identification and improvement plan about non-added value time for VSM using FPC(Flow Process Chart) and PERT/CPM. Last, this paper proposes VSM scheduling method using PERT/CPM and CCPM(Critical Chain Project Management)
The company cannot optimize its computing environment just with individual solutions such as ERP(enterprise resource planning), SCM(supply chain management), CRM(customer relationship management), and KM(knowledge management). EAI(enterprise application integration) has emerged as an alternative that can optimize computing environment of the company through integrating such solutions and systems of distributed computing and mainframe environment. This paper reports the case study of Deakyo Co. in successfully implementing EAI. It describes project goal, project organization, project plan, the implemented EAI configuration and its features, the EAI effectiveness to the firm, and the critical success factors of the EAI project. This case study is thought to be useful as a practical guideline in carrying out EAI project of the company and to provide significant basis for constructing the theoretical framework of EAI project methodology.
International conference on construction engineering and project management
/
2022.06a
/
pp.269-276
/
2022
The robustness of a supply chain (i.e., the ability to cope with external and internal disruptions and disturbances) becomes more critical in ensuring the success of a construction project because the supply chain of today's construction project includes more and diverse suppliers. Previous studies indicate that topological features of the supply chain critically affect its robustness, but there is still a great challenge in characterizing and quantifying the impact of network topological features on its robustness. In this context, this study aims to identify network measures that characterize topological features of the supply chain and evaluate their impact on the robustness of the supply chain. Network centrality measures that are commonly used in assessing topological features in social network analysis are identified. Their validity in capturing the impact on the robustness of the supply chain was evaluated through an experiment using randomly generated networks and their simulations. Among those network centrality measures, the PageRank centrality and its standard deviation are found to have the strongest association with the robustness of the network, with a positive correlation coefficient of 0.6 at the node level and 0.74 at the network level. The findings in this study allows for the evaluation of the supply chain network's robustness based only on its topological design, thereby enabling practitioners to better design a robust supply chain and easily identify vulnerable links in their supply chains.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.733-737
/
2008
Construction supply chain management focused on materials in construction industry plays a critical role which controls the success and failure of a project. For the efficiency of construction supply chain management, the framework which provides project participants with the information originated from whole construction logistics steps without the omission and discontinuation of information flow is required. The new management framework that can support this environment is necessary because of setting up the complicated and distributed environment including logistics information management by intelligent equipment, co-working management with pre-framework legacy system and various devices(UMPC and PDA etc.) as the information confirmation and electrical transmission tool between the project participants different from former construction supply chain management environment while recently developing ubiquitous technologies such as RFID/USN and intelligent equipment to support logistics process. Therefore, the objective of this study is to introduce the concept of SOA (Service Oriented Architecture) as an alternative of effective information integration under the complex and distributed environment and to propose the SOA-based application model for building intelligent construction supply chain management framework.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.597-600
/
2008
Recently, Several Mega project are been performing as a multi-dimensional development project in Korea, but some problem has been revealed about deficiency of the history, experience, and skill. A multi-dimensional development project require the technology which can manage mega project to its specific at the level of program management. predicting schedule and schedule management are the most important for mega project, been performing over several years. This research shows the method of predicting and planning schedule in the early stage as a pre-study on developing a technology of schedule management. First of all, it presents the development of database considering the specific of mega project that can accumulate the history of schedule and search the schedule according to the type of single and multi building. Also it suggests the method of prediction schedule by creating scenarios according to owner requirements and cash flow, affecting schedule management in the early stage, and the shortening possibility of schedule duration using CCPM theory.
Journal of Korean Society of Industrial and Systems Engineering
/
v.45
no.3
/
pp.214-227
/
2022
The successful implementation of green supply chain management(GSCM) practices requires a level of cooperation that can be difficult to conduct. Despite this challenge, limited scholarly attention has been paid to exploring how the implementation of GSCM practices can be effectively facilitated and enhanced through accumulated social capital with suppliers. Based on social capital theory, this study postulates that supplier network characteristics derived from social capital with key suppliers can be critical antecedents of GSCM, which in turn enhances the firm's environmental performance. To test hypotheses, data were collected from 330 firms in 15 countries, and structural equation modeling was employed. Results show that GSCM improves environmental performance, and structural and cognitive social capitals of the supplier network act as antecedents and lead to GSCM implementation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.