• Title/Summary/Keyword: Crew Productivity

Search Result 31, Processing Time 0.022 seconds

Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work (거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구)

  • Kang, Dong-Wan;Ji, Soung-Min;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.44-52
    • /
    • 2012
  • In the cost management of public construction projects, it is an important issue to develop an adequate cost data for estimating the predetermined amount by various methods. For a long time, a standard of estimation in korea is used as a basis for estimating the predetermined amount of public construction. However, they did not have a reasonable cost data based on a labor and equipment productivity analysis. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for more accurate cost data to use in an early phase. This study analyzed the productivity of form work by the CYCLONE model, and presented the model on the number of optimal labor through sensitivity analysis. This CYCLONE model can be useful in analyzing productivity on the various sizes of form. Also, the regression model to estimate the daily output can be used in predicting the amount of labor. Considering the work duration in the regression model is expected to make the daily output estimation much more accurate.

Crew Productivity and Cost Analysis of Sandwich Panel Construction Work by Applying Web-Cyclone Simulation (Web-Cyclone을 활용한 샌드위치 패널공사 작업조별 생산성 분석 및 공사금액 예측에 대한 연구)

  • Cho, Dong-Ryul;Lee, Seung-Hyun;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.262-267
    • /
    • 2008
  • The domestic construction market started to expand steadily since 1970s. The building market which utilizes a sandwich panel with advantages of economical construction expenses and convenient construction has grown rapidly in recent years. However, the companies which specialize in constructing sandwich panels are relatively small or medium size, compared with other construction companies. As a result, studies on the improvement of productivity have not been conducted sufficiently. In this study, the construction sites of sandwich panel are investigated, and the work processes by each team are analyzed. Additionally, the productivity and the construction cost of each construction team are analyzed by constructing a model using the Web-Cyclone. It is expected that the results of this study can be applied to estimate the productivity and the construction cost of a sandwich panel construction that is appropriate for the on-site characteristics of small and medium sized construction companies in Korea. Also, similar processes can be simulated based on the modeling constructed in this study.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

A Case Study on Productivity Analysis and Methods Improvement for Masonry Work

  • Chang, Chul-Ki;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.372-381
    • /
    • 2013
  • In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.

Productivity Analysis of Rebar Works in Apartment Housing Construction Project (공동주택 철근공사의 현장분석을 통한 생산성에 관한 연구)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Young-Joo;Ha, Min-Su;Ha, Jae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.165-166
    • /
    • 2010
  • In this study, it was accomplished to analyze the productivity and manpower through the activity of rebar work for the application of rational construction cost in apartment house. And the rebar work is very important in the view of the expense and safety, and durability in the construction of R/C structure. Also the rebar work is very affected with productivity owing to the lack of manpower and materials cost rise.

  • PDF

Structural and Job Analysis for Core Competency of Aircraft Maintenance Crew Using Fuzzy Theory (퍼지이론을 이용한 항공기 정비사 핵심역량 구조 및 업무분석)

  • Choi, Ssang-Yong;Hwang, Seung-Gook
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.25 no.6
    • /
    • pp.607-614
    • /
    • 2015
  • In this paper, structural analysis for the 16 core competencies of aircraft maintenance crew using FSM is carried out for the purpose of improving the capability of aircraft maintenance. As a result, the three groups of layers are composed of the 3 top layers, 3 middle layers and 10 lowest layers. These results make it possible to grasp the impact and importance. In addition, the core competency of aircraft maintenance crew can improve the maintenance quality and productivity through working on the spot. In this viewpoint, fuzzy relational matrix, which is used as a basis for evaluating the work, can be obtained from the data of the 100 aircraft maintenance crew for core competencies. In this paper, the efficiency of this model is shown by utilizing the 100 modeling data and the 67 checking data.

A Study on the Work Crew Based for the Estimation from Construction Analysis of Cement Liquid Waterproofing in Apartment House (공동주택 시멘트 액체방수 공사의 현장분석을 통한 작업조 기반 품셈에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.121-128
    • /
    • 2010
  • This study aims to make improvements to the standard estimation process used to estimate reasonable costs for construction work, and to suggest a work crew based estimation using a new cost estimation model. In addition, work crew shift combination and construction process were systematically organized in order to improve the estimation technique and the construction capability of the cement liquid waterproofing work for apartment buildings. In addition, in terms of manpower and productivity, analyses were performed on the cement liquid waterproofing work for apartment buildings with net areas between $84-85m^2$ and $125-184m^2$, and the results were then compared with those calculated using the conventional work-crew based estimation method. Through this study, when the results of this study and those calculated by the conventional method were compared, for apartments with the net area of $84-85m^2$, the differences between specialists were shown to be 1.91 times to 2.13 times on average, while they were 8.82 times to 9.52 times between normal workers on average. For apartments with the net area of $125-184m^2$, the differences betweenspecialists were shownto be 1.89 times to 2.07 times on average, and 8.57 times to 9.38 times on average between normal workers.

Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method (무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석)

  • Lee, Dong Wook;Cho, Hong Jun;Lee, Keun Jo;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.457-468
    • /
    • 2011
  • Recently, the non-vibration mass excavation method is used on sewage pipes and road construction sites in Jeju. However, a construction cost estimation based on the unit quantity does not provide a proper unit price. In this study, a comparison of the productivity of the standard quantity-per-unit costing method and the one of the work crew combination method was made based on the site monitoring of the non-vibration mass excavation method that is used in construction sites near Jeju. For this, data of 35 sites were collected: a regression equation was derived from the 30 data, and verification was carried out through the remaining 5 data. The analysis concluded that a day's workload is $16.43m^3$. In addition, a combination of the equipment considering the site conditions and the amount of labor, which varies with the number of work crew was obtained in order to estimate the construction cost of the work crew combination method. The construction cost was calculated based on the one-day workload ($16.43m^3$) derived from the regression analysis. The cost then was analyzed and compared with the standard quantity-per-unit costing method.

Productivity Assessment of Form Works According to Work Elements (공동주택 거푸집공사의 작업요소별 생산성 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Young-Joo;Ha, Min-Su;Kim, Jin-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.161-163
    • /
    • 2010
  • In this study, it was accomplished the analysis of apartment house shape and the work factor productivity of the form work for the application of rational construction cost in apartment house. The form work is highly depended on the manpower in frame construction, and it has been a high impact during estimating of frame work cost.

  • PDF

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.

  • PDF