• Title/Summary/Keyword: Cost-based Objective

Search Result 791, Processing Time 0.031 seconds

Muti-Objective Design Optimization of Self-Compacting Concrete using CCD Experimental Design and Weighted Multiple Objectives Considering Cost-Effectiveness (비용효율을 고려한 자기 충전형 콘크리트의 CCD 실험설계법 및 가중 다목적성 기반 다목적설계최적화(MODO))

  • Do, Jeongyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.3
    • /
    • pp.26-38
    • /
    • 2020
  • Mixture design of self-compacting concrete is a typical multi-criteria decision making problem and conventional mixture designs are based on the low level engineering method like trials and errors through iteration method to satisfy the various requirements. This study concerns with performing the straightforward multiobjective design optimization of economic SCC mixture considering relative importances of the various requirements and cost-effectives of SCC. Total five requirements of 28day compressive strength, filling ability, segregation stability, material cost and mass were taken into consideration to prepare the objective function to be formulated in form of the weighted-multiobjective mixture design optimization problem. Economic SCC mixture computational design can be given in a rational way which considering material costs and the relative importances of the requiremets and from the result of this study it is expected that the development of SCC mixtue computational design and the consequent univeral concrete material design optimization methodology can be advanced.

Cost-Based Directed Scheduling : Part II, An Inter-Job Cost Propagation Algorithm (비용기반 스케줄링 : Part II, 작업간 비용 전파 알고리즘)

  • Suh, Min-Soo;Kim, Jae-Kyeong
    • Journal of Intelligence and Information Systems
    • /
    • v.14 no.1
    • /
    • pp.117-129
    • /
    • 2008
  • The cost-based scheduling work has been done in both the Operations Research (OR) and Artificial Intelligence (AI) literature. To deal with more realistic problems, AI-based heuristic scheduling approach with non-regular performance measures has been studied. However, there has been little research effort to develop a full inter-job cost propagation algorithm (CPA) for different jobs having multiple downstream and upstream activities. Without such a CPA, decision-making in scheduling heuristics relies upon local, incomplete cost information, resulting in poor schedule performance from the overall cost minimizing objective. For such a purpose, we need two types of CPAs : intra-job CPA and inter-job CPA. Whenever there is a change in cost information of an activity in a job in the process of scheduling, the intra-job CPA updates cost curves of other activities connected through temporal constraints within the same job. The inter-job CPA extends cost propagation into other jobs connected through precedence relationships. By utilizing the cost information provided by CPAs, we propose cost-based scheduling heuristics that attempt to minimize the total schedule cost. This paper develops inter-job CPAs that create and update cost curves of each activity in each search state, and propagate cost information throughout a whole network of temporal constraints. Also we propose various cost-based scheduling heuristics that attempt to minimize the total schedule cost by utilizing the cost propagation algorithm.

  • PDF

A Simple Interactive 3D Interior Design Application for Living Room - Cost Management

  • Winnie, Chin;Hui, Saw Seow;Gee, Yap Seok
    • Journal of Multimedia Information System
    • /
    • v.4 no.3
    • /
    • pp.157-162
    • /
    • 2017
  • The title of this project is "A Simple Interactive 3D Interior Design Application for Living Room - Cost Management", focusing on developing an application that enables costing and designing to be executed concurrently in interior design phases. This is because any changes made at costing phase after design phase is completed, it will potentially lead to unnecessary increase in cost and time. Therefore, the objective of this project is aimed to devise a cost management module to be included in the proposed application, allowing interior designer to make cost-based decision at the designing phase itself. This can be achieved through its proposed functions which include total cost update, budget management, cost estimator calculator and material list generation. The methodology being proposed in this project is Prototyping Development, categorized under Rapid Application Development (RAD), by starting off with planning, analysis, design and implementation phases are performed concurrently and repeatedly in a cycle to produce a prototype until the application is completed. In the end of this project, the developed prototype is expected to contribute a better solution towards cost management in interior design.

A Dynamic Production and Transportation Model with Multiple Freight Container Types (다수의 화물컨테이너를 고려한 동적 생산-수송 모형에 관한 연구)

  • Lee, Woon-Seek
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.1
    • /
    • pp.157-165
    • /
    • 1998
  • This paper considers the single-product production and transportation problem with discrete time, dynamic demand and finite time horizon, an extension of classical dynamic lot-sizing model. In the model, multiple freight container types are allowed as the transportation mode and each order (product) placed in a period is shipped immediately by containers in the period. Moreover, each container has type-dependent carrying capacity restriction and at most one container type is allowed in each shipping period. The unit freight cost for each container type depends on the size of its carrying capacity. The total freight cost is proportional to the number of each container type employed. Such a freight cost is considered as another set-up cost. Also, it is assumed in the model that production and inventory cost functions are dynamically concave and backlogging is not allowed. The objective of this study is to determine the optimal production policy and the optimal transportation policy simultaneously that minimizes the total system cost (including production cost, inventory holding cost, and freight cost) to satisfy dynamic demands over a finite time horizon. In the analysis, the optimal solution properties are characterized, based on which a dynamic programming algorithm is derived. The solution algorithm is then illustrated with a numerical example.

  • PDF

Designing Cellular Mobile Network Using Lagrangian Based Heuristic (라그랑지안 기반의 휴리스틱 기법을 이용한 셀룰러 모바일 네트워크의 설계)

  • Hong, Jung-Man;Lee, Jong-Hyup
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.37 no.1
    • /
    • pp.19-29
    • /
    • 2011
  • Cellular network is comprised of several base stations which serve cellular shaped service area and each base station (BS) is connected to the mobile switching center (MSC). In this paper, the configuration modeling and algorithm of a cellular mobile network with the aim of minimizing the overall cost of operation (handover) and network installation cost (cabling cost and installing cost of mobile switching center) are considered. Handover and cabling cost is one of the key considerations in designing cellular telecommunication networks. For real-world applications, this configuration study covers in an integrated framework for two major decisions: locating MSC and assigning BS to MSC. The problem is expressed in an integer programming model and a heuristic algorithm based on Lagrangian relaxation is proposed to resolve the problem. Searching for the optimum solution through exact algorithm to this problem appears to be unrealistic considering the large scale nature and NP-Completeness of the problem. The suggested algorithm computes both the bound for the objective value of the problem and the feasible solution for the problem. A Lagrangian heuristics is developed to find the feasible solution. Numerical tests are performed for the effectiveness and efficiency of the proposed heuristic algorithm. Computational experiments show that the performance of the proposed heuristics is satisfactory in the quality of the generated solution.

Life-cycle-cost optimization for the wind load design of tall buildings equipped with TMDs

  • Venanzi, Ilaria;Ierimonti, Laura;Caracoglia, Luca
    • Wind and Structures
    • /
    • v.30 no.4
    • /
    • pp.379-392
    • /
    • 2020
  • The paper presents a Life-Cycle Cost-based optimization framework for wind-excited tall buildings equipped with Tuned Mass Dampers (TMDs). The objective is to minimize the Life-Cycle Cost that comprises initial costs of the structure, the control system and costs related to repair, maintenance and downtime over the building's lifetime. The integrated optimization of structural sections and mass ratio of the TMDs is carried out, leading to a set of Pareto optimal solutions. The main advantage of the proposed methodology is that, differently from the traditional optimal design approach, it allows to perform the unified design of both the structure and the control system in a Life Cycle Cost Analysis framework. The procedure quantifies wind-induced losses, related to structural and nonstructural damage, considering the stochastic nature of the loads (wind velocity and direction), the specificity of the structural modeling (e.g., non-shear-type vibration modes and torsional effects) and the presence of the TMDs. Both serviceability and ultimate limit states related to the structure and the TMDs' damage are adopted for the computation of repair costs. The application to a case study tall building allows to demonstrate the efficiency of the procedure for the integrated design of the structure and the control system.

Comparison of Fentanyl-Based Rapid Onset Opioids for the Relief of Breakthrough Cancer Pain: Drug Price Based on Effect Size

  • Seongchul Kim;Hayoun Jung;Jina Park;Jinsol Baek;Yeojin Yun;Junghwa Hong;Eunyoung Kim
    • Korean Journal of Clinical Pharmacy
    • /
    • v.33 no.1
    • /
    • pp.43-50
    • /
    • 2023
  • Background and Objective: With the advancement of cancer treatments and increased life expectancy, managing breakthrough cancer pain (BTcP) is essential to improve the quality of life for cancer patients. This study aimed to compare the major rapid onset opioids in Korea based on their characteristics and costs to determine the best option for each patient. Methods: Based on sales information from IQVIA-MIDAS, sublingual fentanyl tablet (SLF), fentanyl buccal tablet (FBT), and oral transmucosal fentanyl citrate (OTFC) were selected as the top three drugs for the treatment of BTcP in Korea, considering them the most comparable drugs. The cost and cost-pain relief ratio of the drugs for short-term (1 month) and long-term (1 year) treatment were compared and the ease of administration based on various factors, including pharmacokinetics, onset of action, and administration procedures were evaluated. Results: SLF was evaluated as the best overall in terms of rapid onset of action, ease of administration, and drug cost and also had the highest market share. SLF had the lowest cost pain relief ratio for both the initial and supplemental treatment for the 1-month pain intensity difference 15 (PID15) ratio. However, for the 1-month PID30 ratio, SLF was not superior to OTFC or FBT. The longer the breakthrough cancer pain duration, the more cost-effective the other rapid onset opioids. Conclusion: The rapid onset opioids that fit the patient's breakthrough cancer pain pattern have the best cost-effectiveness.

Maximizing profits in supply chain using ABC(Activity-Based Costing) mixed-integer modelling (이익 최대화를 위한 공급 체인에서의 ABC(Activity-Based Costing) 적용에 관한 연구)

  • 진수구;박준철;최성희;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.171-175
    • /
    • 2005
  • 본 연구에서는 ABC(Activity-Based Costing),활동기준원가를 설명하고, 한 업체를 대상으로 Cost structure를 파악하여,$Z_{abc}$ (ABC=based objective function value)를 최대화 하는 값을 찾아 이익을 최대화 시켜 기업가치를 향상시키고자 모형을 설계한다. 이를 위해 변수를 결정하고, 제약을 설정하게 된다. 이를 통해 수학적 모형을 완성 시뮬레이션을 통한 이익을 최대화 시키는 활동원가의 활동들을 규명한다.

  • PDF

Multi-Objective Short-Term Fixed Head Hydrothermal Scheduling Using Augmented Lagrange Hopfield Network

  • Nguyen, Thang Trung;Vo, Dieu Ngoc
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1882-1890
    • /
    • 2014
  • This paper proposes an augmented Lagrange Hopfield network (ALHN) based method for solving multi-objective short term fixed head hydrothermal scheduling problem. The main objective of the problem is to minimize both total power generation cost and emissions of $NO_x$, $SO_2$, and $CO_2$ over a scheduling period of one day while satisfying power balance, hydraulic, and generator operating limits constraints. The ALHN method is a combination of augmented Lagrange relaxation and continuous Hopfield neural network where the augmented Lagrange function is directly used as the energy function of the network. For implementation of the ALHN based method for solving the problem, ALHN is implemented for obtaining non-dominated solutions and fuzzy set theory is applied for obtaining the best compromise solution. The proposed method has been tested on different systems with different analyses and the obtained results have been compared to those from other methods available in the literature. The result comparisons have indicated that the proposed method is very efficient for solving the problem with good optimal solution and fast computational time. Therefore, the proposed ALHN can be a very favorable method for solving the multi-objective short term fixed head hydrothermal scheduling problems.

Dongeui Visual-PERT/CPM for R&D Project Management (연구개발 프로젝트관리를 위한 시각화모델)

  • 황흥석
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.268-271
    • /
    • 2000
  • In these days, the technical advances and complexities have generated much of the difficulties in managing the project resources, both time and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgements concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a two-step approaches :in the step 1, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning, In the second step, we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. Computer implementation of this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of visual graphical. Also developed GUI-type program, Dongeui Visual-PERT/CPM. The results of this research will provide the project managers with an efficient management tool.

  • PDF