• 제목/요약/키워드: Cost reduction

검색결과 3,638건 처리시간 0.03초

양방향 고유압 말뚝재하시험을 이용한 대형건축물 기초의 공사비 절감에 관한 사례 연구 (A Case Study on Construction Cost Reduction of Large-size Building Foundation using Bi-directional High Pressure Pile Load Test(BDHPLT))

  • 김남일;김상일;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.518-525
    • /
    • 2009
  • The bi-directional high pressure pile load test(BDH PLT) which is a kind of pile load tests was conducted to find out a reasonable design procedure of large-diameter drilled shafts of large-size building structures. The behaviors of bearing capacity and settlement of the large-diameter drilled shafts were analyzed and the results obtained from BDH PLT were also compared with those obtained from the equations suggested in the specification. In case of the reasonable design procedure adopted, the construction cost could be saved at least 15 ~ 28%. It could be concluded that BDH PLT should be needed for the foundation construction cost reduction of the high-rise building structures.

  • PDF

프로세스 품질 개선과 셋업 절감을 고려한 연속 및 불연속 배송 환경에서의 최적 불완전 품질 재고 모형 (Optimal Imperfect-Quality Inventory Models for Continuous and Discrete Shipping with Process Improvement and Setup Reduction)

  • 김대수;유승호
    • 한국경영과학회지
    • /
    • 제34권1호
    • /
    • pp.11-28
    • /
    • 2009
  • Intelligent investment in setup cost reduction and process reliability improvement is crucial to an emerging integrated lean six sigma practice today. This study examines a cost-minimizing problem of jointly determining production lot size, setup cost reduction, and process reliability improvement decisions for a manufacturer with an imperfect production process. We develop models for previously untapped discrete shipping in a supply chain context as well as continuous shipping and solve them optimally using differential calculus and nonlinear programming. We also conduct analytic and numerical sensitivity analyses to provide various important managerial insights into practices.

연근해어업 어선감척사업으로 인한 생산성 및 투자 효과에 관한 연구 (A Study on the Economic Values and Productivity Attained through a Reduction in Fishing Vessels Engaged in Coastal and Offshore Fisheries)

  • 최종두
    • Ocean and Polar Research
    • /
    • 제36권4호
    • /
    • pp.343-351
    • /
    • 2014
  • The purpose of this study is to estimate the economic value and productivity achieved through a reduction in fishing vessels engaged in coastal and offshore fisheries. We found that the value of increasing catch by types in offshore and coastal fisheries was about 17,338 billion won. To examine the economic value, a cost-benefit analysis was applied. This is based on the total cost of vessel reduction (4,576 billion won) assumed to be invested equally each year for five years. BCR and NPV with a discount rate (5.5%) were used to compare the profit of fishery activities in offshore and coastal areas. The model results showed that the NPV and BCR in offshore and coastal fisheries was 5,522 billion won and 2.340 respectively.

다운사이징 정보시스템의 원인, 과정, 결과 (The Causes, the Process, and the Consequences of Downsizing Information Systems)

  • 박관희
    • 정보기술과데이타베이스저널
    • /
    • 제1권2호
    • /
    • pp.25-35
    • /
    • 1994
  • Downsizing IS is rapidly emerging as one of new information systems of the 1990s that involves (1) the cost reduction, (2) the reduction of MIS staff, and (3) the transfer of IS functions to end - users. As downsizing is relatively new information systems, little is known about the causes, the process, or the consequences of downsizing. Case study was chosen as the research methodology of this study. The downsizing IS of Namsun Aluminum Co. Ltd. in Taugu City was chosen for the exploratory case study. The detailed and qualitative analyses to Namsun were performed with the use of observation, participation, and interview techniques. Consequently, the causes, the process, and the consequences of Namsun's downsizing were analyzed and discussed. As for the main cause, downsizing was started with the purpose of cost reduction. The important consequences of downsizing IS are as follows : (1) About 700 million won reduction in the cost of initially developing the downsizing was achieved. (2) Downsizing is performing Namsun's mission critical applications. (3) Namsun's downsizing could be considered to be SIS(strategic information systems).

  • PDF

포장용기 표준화를 통한 기업 내(內) 물류효과 분석 (Analysis of Logistics Effects in Enterprises by the Medium of Standardization of Packing Containers)

  • 원유존;김진호;김동규
    • 대한안전경영과학회지
    • /
    • 제14권4호
    • /
    • pp.193-203
    • /
    • 2012
  • In the limitless competition era of the 21st century, cost reduction is being highlighted as one of survival strategies of businesses. The first item for cost reduction of businesses is logistical costs. The most keenly required thing for this is to remove unnecessary elements, and the best way to realize it to cut down processes using automatic facilities. Packing container in logistics is like a facility. This study is intended to analyze reduction of costs, improvement of business process and reduction of working force through standardization of standardization, and logistics effects through improvement of environmental images in enterprises.

병렬 하이브리드 전기자동차의 주요 구성시스템에 대한 상대적 가격 모델링 (Relative Cost Modeling for Main Component Systems fo Parallel Hybrid Electric Vehicle)

  • 김필수;김용
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제48권6호
    • /
    • pp.294-300
    • /
    • 1999
  • There is a growing interest in hybrid electric vehicles due to environmental concerns. Recent efforts are directed toward developing an improved main component systems for the hybrid electric vehicle applications. Soon after the introduction of electric starter for internal combustion engine early this century, despite being energy efficient and nonpolluting, electric vehicle lost the battle completly to internal combustion engine due to its limited range and inferior performance. Hybrid Electric vehicles offer the most promising solutions to reduce the emission of vehicles. This paper describes a method for cost reduction estimation of parallel hybrid electric vehicle. We used a cost reduction structure that consisted of five major subsystems (three-type and two-type motor) for parallel hybrid electric vehicle. Especially, we estimated the potential for cost reductions in parallel hybrid electric vehicle as a function of time using the learning curve. Also, we estimated the potentials of cost by depreciation.

  • PDF

사회적 비용을 고려한 저탄소 전원구성의 시나리오 분석 (Scenario Analysis of Low-Carbon Generation Mix Considering Social Costs)

  • 박종배;조영탁;노재형
    • 전기학회논문지
    • /
    • 제67권2호
    • /
    • pp.173-178
    • /
    • 2018
  • This study organizes scenarios on the power supply and demand plans considering the uncertainties and the portion of distributed energy resources. In analysing the scenarios, it estimates total electricity supply cost in the social aspect, natural gas demand and air pollutants emission including carbon dioxide. Also the analysis is performed to estimate the marginal cost of carbon dioxide reduction for the fuel switching from coal to liquified natural gas. In result, the social cost could be decreased by replacing some portion of renewable energy by LNG-based combined heat and power and delaying the construction of large base-load generators such as coal and nuclear plants. The marginal carbon dioxide reduction cost by fuel switching is in plausible range for fuel switching to be an option for carbon dioxide emission reduction when the social cost is considered.

석회석광산 개발사업의 비용-편익분석 -사례 중심으로- (A Cost-benefit Analysis of Developing Project for Lime Mineral on the Basis of Case Study)

  • 곽태원;김홍균
    • 자원ㆍ환경경제연구
    • /
    • 제15권4호
    • /
    • pp.713-740
    • /
    • 2006
  • 본 논문에서는 석회석광산 개발사업의 사례를 통해 자원개발사업의 비용-편익분석시 고려되어야 할 비용 및 편익 항목이 무엇이며 이의 정확한 계산을 위해서는 어떤 점을 주의해야 하는지 등을 살펴보았다. 본 논문의 결과에 따르면 임산불 생산가치, 수원함양가능, 대기정화 가능 등은 산림훼손에 따른 환경비용으로 간주되어야 하나 통상적으로 환경비용무로 간주되어 왔던 산림휴양 기능, 산림정수 기능 등은 개별 단위의 석회석 개발 사업시는 환경비용으로 간주하기는 어려운 것으로 나타났다. 비용-편익분석 결과는 할인율에 따라 달랐으나 모두 순편익이 있는 것으로 나타났다. 순편익의 규모는 6,899 억 원에서 1조 784억 원인 것으로 나타났다.

  • PDF

Module solution with Integrated Shunt for GPI, General Purpose Inverter: Shunt embedded Econo module

  • Kim, Simon
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2017년도 전력전자학술대회
    • /
    • pp.596-597
    • /
    • 2017
  • For General Purpose Inverter dedicated in Motor drive, this market is blood market due to low market price. So, developing engineer must consider the cost reduction plan and do action. This inverter always needs to measure current and shunt solution can be one of cost reduction solution.

  • PDF

건설안전감리제도가 위험제어 및 절감에 미치는 영향 (The Effect of Construction Safety Supervision System on Risk Control and Reduction)

  • 임진상;강경식
    • 대한안전경영과학회지
    • /
    • 제20권3호
    • /
    • pp.1-9
    • /
    • 2018
  • This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.