1 |
Lee H.L. and M.J. Rosenblatt, 'Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System,' Management Science, Vol.33, No.9 (1987), pp.1125-1136
DOI
ScienceOn
|
2 |
Schwaller R.L., 'EOQ under Inspection Costs,' Production and Inventory Management, Vol.29, No.3(1988), pp.22-24
|
3 |
Tripathy, P.K, W. Wee, and P.R. Majhi, 'An EOQ Model with Process Reliability Considerations,' Journal of the Operational Research Society, Vol.54, No.5(2003), pp.549- 554
DOI
ScienceOn
|
4 |
Crosby, P., Quality Is Free, McGraw-Hill, New York, 1979
|
5 |
Kim, S. and B. Arinze, 'A Knowledge Based Decision Support System for Setup Reduction,' Decision Sciences, Vol.23, No.6(1992), pp.1389-1407
DOI
|
6 |
Lee J.S. and K.S. Park, 'Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production,' Journal of the Operational Research Society, Vol.42, No.9(1991), pp.775-783
DOI
|
7 |
Rahim, M.A. and M. Ben-Daya, 'Joint Determination of Production Quantity, Inspection Schedule, and Quality Control for an Imperfect Process with Deteriorating Products,' Journal of the Operational Research Society, Vol.52, No.12(2001), pp.1370-1378
DOI
ScienceOn
|
8 |
Spence, A.M. and E.I. Porteus, 'Setup Reduction and Increased Effective Capacity,' Management Science, Vol.33, No.10 (1987), pp.1291-1301
DOI
ScienceOn
|
9 |
Anily, S., 'Single-Machine Lot-Sizing with Uniform Yields and Rigid Demands : Ro bustness of the Optimal Solution,' lIE Transactions, Vol.27, No.5(1995), pp.625-633
|
10 |
Fine, C.H., 'Quality Improvement and Learning in Productive Systems,' Management Science, Vol.32, No.10(1986), pp.1301-1315
DOI
ScienceOn
|
11 |
Lee, W.J., D. Kim, and A.V. Cabot, 'Optimal Demand Rate, Lot Sizing and Process Reliability Improvement Decisions,' lIE Transactions, Vol.28, No.1(1996), pp.941-952
|
12 |
Salarneh, M.K and M.Y. Jaber, 'Economic Production Quantity Model for Items with Imperfect Quality,' International journal of Production Economics, Vol.64, No.1-3(2000), pp.59-64
DOI
ScienceOn
|
13 |
Schonberger, R.J., Japanese Manufacturing Techniques, The Free Press, New York, 1982
DOI
ScienceOn
|
14 |
Yoo, S.H., 'Collaborative and Integrative Models for Cost and Quality Capability Improvement in a Supply Chain,' Korea University Business School, Unpublished Ph.D. dissertation (2009)
|
15 |
Chiang, A.C., Fundamental Methods of Mathematical Economics, 2nd edition, McGraw- Hill, New York, 1974
|
16 |
Hall, R., Zero Inventories, Dow Jones-Irwin, Homewood, 1983
|
17 |
Kim, C.H., Y. Hong, and S.Y. Chang, 'Optimal Production Run Length and Inspection Schedules in a Deteriorating Production Process,' IIE Transactions, Vol.33, No.5(2001), pp.421-426
DOI
ScienceOn
|
18 |
Liou, M., S. Tseng, and T. Lin, 'The Effects of Inspection Errors to the Imperfect EMQ Model,' lIE Transactions, Vol.26, No.2(1994), pp.42-51
DOI
ScienceOn
|
19 |
Womack, J.P., D.T. Jones, and D. Ross, The Machine that Changed the World, Rawson, New York, 1990
|
20 |
Deming, W.E., Quality, Productivity, and Competitive Position, MIT Press, Cambridge, 1982
|
21 |
Billington, P.J., 'The Classic Economic Production Quantity Model with Setup Cost as a Function of Capital Expenditure,' Decision Sciences, Vol.18, No.1(1987), pp.25-42.
DOI
ScienceOn
|
22 |
Lee H.L. and M.l. Rosenblatt, 'A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay,' IIE Transactions, Vol.21 , No.4(1989), pp.68-75
DOI
|
23 |
Robinson Jr., E.P. and F. Sahin, 'Economic Production Lot Sizing with Periodic Costs and Overtime,' Decision Sciences, Vol.32, No.3(2001), pp.423-452
DOI
ScienceOn
|
24 |
Rosenblatt M.J, and H.L. Lee, 'Economic Production Cycles with Imperfect Production Processes,' lIE Transactions, Vol.21 No.1(1986), pp.48-55
DOI
|
25 |
Cheng, T.C.E., 'EPQ with Process Capability and Quality Assurance Considerations,' Journal of the Operational Research Society, Vol.42, No.8(1991), pp.713-720
DOI
|
26 |
Kim, D. and W.J. Lee, 'Optimal Joint Pricing and Lot Sizing with Fixed and Variable Capacity,' European Journal of Operational Research, Vol.109, No.1 (1997), pp.212-216
DOI
ScienceOn
|
27 |
Szendrovits, A.Z., 'Non-Integer Optimal Lot Size Ratios in Two-Stage Production! Inventory Systems,' International Journal of Production Research, Vol.21, No.3 (1983), pp.323-336
DOI
ScienceOn
|
28 |
Vickson, R.G., 'Optimal Inspection Sublots for Deteriorating Batch Production,' IIE Transactions, Vol.30, No.11(1998), pp.1019-1024
DOI
|
29 |
Yano, C.A. and H.L. Lee, 'Lot Sizing with Random Yields: A Review,' Operations Research, Vol.43, No.2(1995), pp.311-334
DOI
ScienceOn
|
30 |
Guu, S. and A.X. Zhang, 'The Finite Multiple Lot Sizing Problem with Interrupted Geometric Yield and Holding Costs,' European Journal of Operational Research, Vol. 145, No.3(2003), pp.635-644
DOI
ScienceOn
|
31 |
Rahim, M.A., 'Joint Determination of Production Quantity, Inspection Schedule and Control Chart Design,' lIE Transactions, Vol.26, No.6(1994), pp.2-11
DOI
ScienceOn
|
32 |
Cheng, T.C.E., 'An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Process,' lIE Transactions, Vol.23, No.1 (1991), pp.23-28
DOI
ScienceOn
|
33 |
Juran, J,M. and F.M. Gryna Jr., Quality Planning and Analysis, 2nd edition, McGraw- Hill, New York, 1980
|
34 |
Zhang X. and Y. Gerchak, 'Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield,' IIE Transactions, Vol.22, No.1 (1990), pp.41-47
DOI
|
35 |
Kim, D., V.A. Mabert, and P.A. Pinto, 'Integrative Cycle Scheduling Approach for a Capacitated Flexible Assembly System,' Decision Sciences, Vol.24, No.1(1993), pp. 126-147
DOI
ScienceOn
|
36 |
Porteus, E.L., 'lnvesting in Reduced Setups in the EOQ Model,' Management Science, Vol.31, No.8(1985), pp.998-1010
DOI
ScienceOn
|
37 |
Shingo, S., Modem Approaches to Manufacturing Improvement: The Shingo System Robinson A (ed), Productivity Press, Cambridge, 1990
|
38 |
Leung, K.F., 'A Generalized Geometric Programming Solution to 'An Economic Production Quantity Model with Flexibility and Reliability Considerations',' European Journal of Operational Research, Vol.176, No.1(2007), pp.240-251
DOI
ScienceOn
|
39 |
Cheng, T.C.E., 'An Economic Production Quantity Model with Flexibility and Reliability Considerations,' European Journal of Operational Research, Vol.39, No.2(1989), pp.174-179
DOI
ScienceOn
|
40 |
George, M.L., Lean Six Sigma: Combining Six Sigma Quality with Lean Speed, McGraw- Hill, New York, 2002
|
41 |
Voros, J., 'Lot Sizing with Quality Improvement and Setup Time Reduction,' European Journal of Operational Research, Vol.113, No.3(1999), pp.568-574
DOI
ScienceOn
|
42 |
Yeh, RH. and T. Chen, 'Optimal Lot Size and Inspection Policy for Products with Warranty,' European Journal of Operational Research, Vol.174, No.2(2006), pp.766- 776
DOI
ScienceOn
|
43 |
Suzaki, K, The New Manufacturing Challenge : Techniques for Continuous Improvement, The Free Press, New York, 1987
|
44 |
Porteus, E.L., 'Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction,' Operations Research, Vol.34, No.1(1986), pp.137-144
DOI
ScienceOn
|
45 |
Kim, D., 'Optimal Two-Stage Lot Sizing and Inventory Batching Policies,' International Journal of Production Economics, Vol.58, No.3(1996), pp.221-234
DOI
ScienceOn
|