• Title/Summary/Keyword: Cost ratio

Search Result 2,603, Processing Time 0.028 seconds

Value Chain Optimization in Timber Supply Chain: Case Study in Gangwon-do

  • Kang, Byongrho;Kim, Hyoungtae;Jang, Jaeyoung;Woo, Heesung;Woo, Jongchoon
    • Journal of Forest and Environmental Science
    • /
    • v.34 no.4
    • /
    • pp.304-312
    • /
    • 2018
  • This study investigates to identify the impact factors of timber production cost on the relationship between production cost components and revenues generated by evaluating the entire timber supply chain. In this research, selected 13 logging zones as target areas and classified 14 forest production cost factors, six groups. Additionally, established 13 externalenvironmental factors with related stakeholders and forestry experts. And the BCR (Benefit Cost Ratio) method was then used to analyze the economics of each zone. Filled up a checklist and rated using 5 point scale for each target region, and extracted major cost factors for the production economy of the item. The analysis of major cost factors in the timber production revealed that wood grab equipment usage fee was the first ranked and forest trees purchase cost was ranked in the $2^{nd}$Also, the $3^{rd}$ranking was logging expenses, and transport cost, which accounted for 84% of the total cost, was ranked in the $4^{th}$. In addition, the rock land ratio, slope, timber payment (forest trees purchase cost), special timber, ratio of timber, DBH (Diameter at Breast Height), and mixed forest ratio were the factors that most affected the timber supply chain cost.

The developing optimum maintenance cost model for water pipe network by waterworks business characteristics (수도사업자의 경영환경을 고려한 상수도관망 적정 유지관리비 산정 모델 개발 연구)

  • Kim, Kibum;Kim, Changhwan;Shin, Hwisu;Seo, Jeewon;Hyung, Jinseok;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.1
    • /
    • pp.51-62
    • /
    • 2017
  • For the asset management of a water pipe network, it would be necessary to understand the extent of the maintenance cost required for the water pipe network for the future. This study would develop a method to draw the optimum cost required for the maintenance of the water pipe network in waterworks facilities to maintain the aim revenue water ratio and to achieve the target revenue water ratio, considering the water service providers' waterworks condition and revenue water ratio comprehensively. This study conducted a survey with 96 water service providers as of the early 2015 and developed models to estimate the optimum maintenance cost of the water pipe network, considering the characteristics of the water service providers. Since the correlation coefficient of all the developed models was higher than 0.95, it turned out that it had significant reliability, which was statistically significant. As a result of applying the developed models to the actual water service providers, it was drawn that increasing revenue water ratio to more than a certain level can reduce the maintenance cost of the water pipe network by a great deal. In other words, it is judged that it would be the most efficient to secure the reliability of waterworks management by increasing the short-term revenue water ratio to more than a certain level and gradually increase the revenue water ratio from the long-term perspective. It is expected that the proposed methodology proposed in this study and the results of the study will be used as a basic research for planning the maintenance of water pipe network or establishing a plan for waterworks facilities asset management.

A Study on the Cost State of the Stow Net Fisheries. (연안안강망어업의 원가실태에 관한 연구)

  • 박정호
    • The Journal of Fisheries Business Administration
    • /
    • v.7 no.1
    • /
    • pp.27-41
    • /
    • 1976
  • The results analyzed of the actual state of the stow net fisheries based on the cost expended in 1975 areas follows; The total cost of this fisheries will be 1, 672, 238 won; the production cost, 1, 588, 060 won (95%) ; the material cost in proportion to total cost (100%)408, 480won (24.4%);the labour cost, 1, 006, 480 won (60.2%) ; the expenses, 173, 100won(10.4%)and the commission and the interest payment, 84, 178won(5%). As above the commission and the interest payment doesn't need to be paid much, but only production cost should be paid in case of small scale inshore fisheries. The cost per unit of caches (per Kg) becomes 12 won, the ratio cost of sales (83.4%), the ratio of profit, 16.%. According to the adove, in case of the powered vessel; it shows a tendency of spending too much expenses owing to excessive payment of oil. And in case of nonpowered vessels, it shows a tendency of spending less expenses but still get much gains, due to the fact that the commission and the interest payment are less, and none is paid for fuel procurement.

  • PDF

Economic Analysis of the Piezoelectric Power using the California Standard Test (캘리포니아 표준 테스트 방법을 사용한 압전 발판의 경제성 분석)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.51-56
    • /
    • 2017
  • The purpose of this study is to suggest economic analysis for piezoelectric power. Economic analysis method uses california standard test. Perspectives of california standard test is participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. This study identifies the cost and benefit components. This study identifies benefit-cost calculation procedures from four test : participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. In the economic analysis, the order of benefit cost ratio in piezoelectric power shows total resource cost test, program administrator cost test, ratepayer impact measure test and participant test.

The Effect of Requirement Creep on the Fixed-Cost Project Planning (요구사항 변경이 확정가 프로젝트 계획에 미치는 영향)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.14D no.6
    • /
    • pp.641-648
    • /
    • 2007
  • To develop a dynamic system project in which the requirement changes frequently, it's impossible to finish the development within a fixed-cost due to additional budget occurring in need of requirement creep. To manage the successive project within a fixed-cost, it's better to manage the ratio of necessarily changed size of project and necessary optional requirement. According to Bhagwat, it is occurred in the construction phase. Also, he stated that the software development cost, construction phase cost and requirement cost are equal and it was wrong explanation in the ratio of requirement creep and optional requirement. This paper assumes the requirement creep to be happening in the phase of elaboration and construction. In addition, some differences were supposed to happen between software development cost, construction phase cost, and requirement creep cost. As a result, the reality was preferred rather than the ratio of optional requirement and the ratio of requirement creep.

Cost Estimation of Intermittent Aerobic Digestion (간헐포기소화의 비용 평가)

  • Kim, Woon Joong;Kim, Seong Hong;Kim, Hee Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1B
    • /
    • pp.113-118
    • /
    • 2006
  • Cost estimation of an intermittent aerobic digestion technology was carried out in this study. Aeration ratio is one of the most important design factors and it affects installation and power consumption cost. For the purpose, digestion efficiency was fixed at 35% of SS reduction and the reactor type was assumed a 2-chamber sequencing batch reactor (SBR). Installation cost and power consumption cost were evaluated and converted in terms of present value that could reflect the rate of discount and the rate of economic growth. The lower aeration ratio needs higher installation cost but lower power consumption cost. From the point of only installation cost, conventional aerobic digestion is cheaper than intermittent aerobic digestion. But intermittent aerobic digestion is better economical for more than 10 years of estimated service life. The optimal aeration ratio was dependent on the service life and it was lower as the estimated service life increased. For the 45 years as the service life, the optimal aeration ratio was estimated 0.3 and the total cost was 64% of the conventional aerobic digestion.

Development of Program for Estimation of Direct or Indirect Loss Cost Due to Industrial Disaster (산업재해로 인한 직.간접 손실비용 산출 프로그램 개발)

  • 최광만;서재민;임차순;류병태;고재욱
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.2
    • /
    • pp.63-68
    • /
    • 2001
  • In this study the main elements which can be commonly adopted to every kind of business are selected through the research, case-study, benchmarking common items of a direct or indirect loss cost. As a result of the development of a program for evaluating loss cost a case or accumulated data can be easily managed through estimating the direct and indirect loss cost as tell as the ratio between directs and indirect cost. The program is fit to case-study and we are compared direct cost with indirect cost. Automatically, this program showed ratio between directs and indirect cost for style, scale of accident The person in charge of safety and hygiene can have better chances to get into management also the owner or the CEO can recognize the importance of management of safety and hygiene. So this can guide the company to invest in a prevention of disaster and to adopt a safety and hygiene management promote the prevention activity of a company, and finally decrease the accident rate in the country.

  • PDF

Determinants of the Indirect Cost Rates of the Government-Funded Research Institutes in Korea (정부출연연구소의 간접비율 결정요인에 관한 연구)

  • 조성표;권선국;박구선;김재식
    • Journal of Technology Innovation
    • /
    • v.5 no.2
    • /
    • pp.155-177
    • /
    • 1997
  • Since 1995 the Korean Ministry of Science and Technology has introduced and implemented a project based system (PBS) for awarding R&D funds. While capital investments for national laboratories such as buildings and research facilities are supported by the government, normal operating expenses including personnel expenses should be earned by national laboratories through open competition under PBS. The project budget includes both direct research costs and indirect costs. The purpose of this paper is to examine the components of indirect costs and to examine determinants of indirect costs of national laboratories in Korea. The indirect costs of nineteen national laboratories are examined. The direct personnel costs and indirect personnel costs out of total personnel costs are 72% and 28%, respectively. The average indirect cost rate is 74.1% of direct personnel costs. Major components of indirect costs are general operating costs, indirect personnel costs, taxes and dues, and expenses related to the usage of equipment. The significant determinants of indirect cost are indirect personnel ratio. the ratio of unique projects, the type of national laboratories (pure research laboratories or other), and asset activity ratio measured as research divided by total assets. The high indirect personnel ratio, the high ratio of unique projects, the laboratories classified as other, the low asset activity ratio are related to high indirect cost rates.

  • PDF

A study on the cost state of the stow net Fishery (근해안강망어업경영의 원가실태에 관한 연구)

  • 박정호
    • The Journal of Fisheries Business Administration
    • /
    • v.9 no.2
    • /
    • pp.59-89
    • /
    • 1978
  • The analyzed results of the actual state of stow net fishery based on the cost expended are as follows. According to the calculation of interests, the total cost of this fishery comes to ₩38,010,653 and in this account, the production cost comes to ₩35,477,198(93.3%), the material cost, 14,567,239(38.3%), the labour cost, 12,740,274(33.5%), the expenses, ₩8,169,685(21.5%), the commision and administration expenses, 2,533,455(6.7%). The expenses for this fishery are paid out as production costs, and the expenses for sale and administration expenses are the lowest of them, and the 93% of expenses are paid out as production costs. The ratio of cost element to 100% is as follow. The wages, 28.4%, fuel, 15.2%, repair, 11.6%, deprecation, 9.5%, fishing gear, 8.7%, ice, 6.1%, container(box for fish), 5.2% administration expenses, 5.2%, food, 3.5%, ship grar, 3.2%, public welfare, 1.7%, commision for sale, 1.5%, insurance for crew, 0.2%, taxes, 0.2%. This fishery is managed with the larger fishing boat than it was and so, it demands better crews with higher wages. In the former fishery, the search for fishing ground is very difficult with long navigation and great fuel consumption. when the weak fishing gears are used, the expenses for their repair and for their gears are greatly paid out. The unit costs of catches to each box come to ₩2.807(₩187 each kg). As the ratio of cost of sales comes to 86.7%and the ratio of interests comes to ₩5,850,812(13.3%), and so the net profit comes to 13.3% of total profits. According to above the ratio of cost of sales is shown as a universal validity, Asthe total expenses comes to 86.7% to the money on sales in the break-even point, the break-even point comes to ₩26,209,168 Accordingly for the profit control the account of production should be raised, and by the saving method of expenditure the break-even point should be brought down for the development of total profits.

  • PDF

Calculation of the target revenue water ratio of local waterworks considering economic feasibility (경제성을 고려한 지방상수도 목표 유수율 산정)

  • Donghong Kim;Jaebum Lee;Jungkwan Song;Taeho Choi
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.311-324
    • /
    • 2023
  • As an advanced study on the method of calculating the target revenue water ratio of local waterworks through the leakage component analysis method proposed by Kim et al. (2022), this study developed a model to calculate the achievable revenue water ratio within the specified project cost, the required project cost to achieve the specified target revenue water ratio, and the economically appropriate target revenue water ratio level by considering the leakage reduction cost and leakage reduction benefit for each revenue water ratio improvement strategy, and conducted an applicability evaluation of the developed model using actual field data. The procedure for calculating the target revenue water ratio of local waterworks considering economics proposed in this study consists of three stages: physical data linkage model construction, leakage component analysis, and economic analysis, and the applicability was evaluated for Zone H with branch type and the Zone M network type. As a result of the application, it was calculated that approximately 32.5 billion won would be required to achieve the target revenue water ratio of 70% in the Zone H, and approximately KRW 10.5 billion would be required to achieve the target revenue water ratio of 75% in the Zone M. If the business scale of Zones H and M was corrected to 10,000 m3/day of water usage, the required project cost for a 1% improvement in the revenue water ratio of Zone H was calculated to be 0.7642 billion won and 0.4715 billion won for Zone M.