DOI QR코드

DOI QR Code

Calculation of the target revenue water ratio of local waterworks considering economic feasibility

경제성을 고려한 지방상수도 목표 유수율 산정

  • Donghong Kim (Korea Water Resources Corporation, Local Water Supply Dept.) ;
  • Jaebum Lee (Korea Water Resources Corporation, Jeonnam Regional Collaboration Office) ;
  • Jungkwan Song (Korea Water Resources Corporation, Central Jeonnam Office) ;
  • Taeho Choi (Korea Water Resources Corporation, Water & Wastewater Research Center)
  • 김동홍 (한국수자원공사 지방상수도처) ;
  • 이재범 (한국수자원공사 전남지역협력단) ;
  • 송정관 (한국수자원공사 전남중부권지사) ;
  • 최태호 (한국수자원공사 상하수도연구소)
  • Received : 2023.09.08
  • Accepted : 2023.11.03
  • Published : 2023.12.15

Abstract

As an advanced study on the method of calculating the target revenue water ratio of local waterworks through the leakage component analysis method proposed by Kim et al. (2022), this study developed a model to calculate the achievable revenue water ratio within the specified project cost, the required project cost to achieve the specified target revenue water ratio, and the economically appropriate target revenue water ratio level by considering the leakage reduction cost and leakage reduction benefit for each revenue water ratio improvement strategy, and conducted an applicability evaluation of the developed model using actual field data. The procedure for calculating the target revenue water ratio of local waterworks considering economics proposed in this study consists of three stages: physical data linkage model construction, leakage component analysis, and economic analysis, and the applicability was evaluated for Zone H with branch type and the Zone M network type. As a result of the application, it was calculated that approximately 32.5 billion won would be required to achieve the target revenue water ratio of 70% in the Zone H, and approximately KRW 10.5 billion would be required to achieve the target revenue water ratio of 75% in the Zone M. If the business scale of Zones H and M was corrected to 10,000 m3/day of water usage, the required project cost for a 1% improvement in the revenue water ratio of Zone H was calculated to be 0.7642 billion won and 0.4715 billion won for Zone M.

Keywords

References

  1. Choi, K., and Cho, J. (2014). Case study on the Jeollabuk-do local water supply efficiency by using DEA and Malmquist Index, J. Digit. Converg., 12(12), 571-580. https://doi.org/10.14400/JDC.2014.12.12.571
  2. Ko, S., Lee, S., and Kwon, Y. (2015). "Analysis of the Efficiency of Local Waterworks Business", Proceeding 2015 of The Korea Association for Local Government Studies, South Korea, 271-298.
  3. Kim, N., Kim, S., and Lee, M. (2015). Waterworks Business Efficiency Analysis using Data Envelope Analysis, KRUMA, 28(4), 269-288.
  4. Choi, T., Kang, K., and Koo, J. (2015). Efficiency Evaluation of Leakage Management Using Data Envelopment Analysis, J. Am. Water Works Assoc., 107(1).
  5. Kim, T., Choi, T., Kim, K., and Koo, J. (2015). A study on cost benefit analysis optimization model for water distribution network rehabilitation project of Taebaek region, J. Korean Soc. Water Wastewater, 29(3), 395-406. https://doi.org/10.11001/jksww.2015.29.3.395
  6. Kim, D., Kim, G., Son D., and Choi, T. (2022). Development and application of methology for calculating revenue water ratio improvement strategy to achieve target revenue water ratio, J. Korean Soc. Water Wastewater, 36(6), 377-390. https://doi.org/10.11001/jksww.2022.36.6.377
  7. Lambert, A.O., Brown, T.G., Takizawa, M. and Weimer, D.(1999). A review of performance indicators for real losses from water supply systems, J. Water Suppl. : Res. Technol. Aqua, 48(6), 227-237. https://doi.org/10.2166/aqua.1999.0025