• 제목/요약/키워드: Cost item

검색결과 419건 처리시간 0.023초

의학교육에서 컴퓨터바탕검사와 문항은행 데이터베이스 구축 (Computer-Based Testing and Construction of an Item Bank Database for Medical Education in Korea)

  • 허선
    • 의학교육논단
    • /
    • 제16권1호
    • /
    • pp.11-15
    • /
    • 2014
  • A number of medical schools in Korea have been using computer-based testing (CBT) for evaluating their students' scientific and/or clinical performance since the early 1990s. Introducing CBT to medical education would have several advantages: first, presenting figures and audio-video files of clinical content is simple with CBT, making it possible to evaluate medical students' competency with navigating more realistic clinical situations at minimum cost; second, CBT enables automatic item analysis and score reporting. To establish CBT, constructing an item bank with item parameters such as difficulty or discriminating parameters will be needed. To select more psychometrically sound items, analysis of the items according to item response theory is necessary. CBT has already been introduced in high stakes tests like the United States Medical Licensing Examination and the Medical Council of Canada Qualifying Examination. The National Health Personnel Examination Board in Korea is also planning to introduce a CBT-based version of the National Medical Examination soon. Thus all medical schools in Korea will need to introduce CBT and construct item banks to prepare their students for their licensing examinations and to measure the students' competency more accurately.

제품 설계 단계에서의 제품 원가 추정 시스템 개발 (The Development of an Product Cost Estimation System at the Product Design Stage)

  • 한관희;박찬우;이규봉;황태일;김강용
    • 한국CDE학회논문집
    • /
    • 제8권2호
    • /
    • pp.101-108
    • /
    • 2003
  • Presented in this paper is the development of an product cost estimation system at the product design stage. The efficient cost estimation function at the design stage is essential for the cost reduction activities through the entire product life cycle. For this purpose, it is necessary to establish a systematic working procedure, and to develop information system for managing a great deal of production and product-related data required for the cost estimation. The developed system has the capability of estimating a cost of assembly type products as well as unit-item type products. As proposed system is based on the variant approach, it can be used easily at an early design stage without the need for detail design information. Also, this system is integrated with legacy PDM (Product Data Management) and ERP (Enterprise Resource Planning) system for fast. accurate and easy product cost estimation. The estimated cost includes material cost, overhead cost as well as labor cost.

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 - (Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost)

  • 구자경;이동욱;심명섭;이태식
    • 대한토목학회논문집
    • /
    • 제30권6D호
    • /
    • pp.655-662
    • /
    • 2010
  • 사회기반시설은 국가 경쟁력 지표로써, 전통적으로 정부의 SOC 재정으로 건설되어 왔다. 그러나 SOC 예산 축소에도 불구하고 사회기반시설의 확충 요구를 해결하기 위해 민간투자사업제도가 도입되었으며, 이 중 도로사업의 비중이 높다. 본 연구는 기 제안된 도로사업 사업계획서의 운영관리비와 사업계획서와 연계되는 재무모델의 운영관리비 항목을 분석하고, 도로사업의 특성을 반영하기 위해 한국도로공사의 사업비 항목과 운영관리 업무를 분석하였다. 분석 결과를 통해 분류체계를 마련하여 비용산정 기준을 마련하는 것이 요구된다. 또한 업무의 효율성을 고려하여 기존의 업무 도구를 웹기반으로 통합하여 하나의 시스템으로 개발하는 것을 제안하였다. 이를 통해 민간투자사업의 전체적인 사업성 확보에 기여하고, 수익성을 기반으로 하는 사회기반시설의 확충에 기여할 것으로 기대된다.

단계별 보증제도에서의 비용분석 및 보증기간 설정 (Cost Analysis and Period Determination in Stepdown Warranty Policy)

  • 김재중;장중순;김원중
    • 품질경영학회지
    • /
    • 제20권1호
    • /
    • pp.39-47
    • /
    • 1992
  • This paper is concerned with cost analysis and determination of warranty period in a stepdown warranty policy. Manufacturer's warranty cost is analyzed for nonrepairable item, where the warranty is assumed to be renewed at any failure within the warranty period. It is shown that from this result in free replacement policy, pro-rata policy and hybrid policy can be easily calculated. The method of determining optimal warranty period is also explored.

  • PDF

중앙창 재고가 있는 수리가능시스템을 위한 해법 (An Optimal Algorithm for Repairable-Item Inventory System with Depot Spares)

  • 김종수;신규철
    • 한국경영과학회지
    • /
    • 제24권3호
    • /
    • pp.1-11
    • /
    • 1999
  • We consider the problem of determining the spare inventory level for a multiechelon repairable-item inventory system. Our model extends the previous results to the system which has an inventory at the central depot as well as bases. We develop an optimal algorithm to find spare inventory leveis, which minimize the total expected cost and simultaneously satisfy a specified minimum service rate. The algorithm is tested using problems of various sizes to verify the efficiency and accuracy.

  • PDF

초기 단계의 성능분포를 활용한 신뢰성 인증시험의 설계 (Design of Reliability Qualification Test Based on Performance Distribution at the Earlier Stage)

  • 정해성
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제12권3호
    • /
    • pp.131-138
    • /
    • 2012
  • A design of reliability qualification test based on performance distribution is developed. In general, the performance of an item degrades as the time goes by and the failure of an item occurs when the performance degradation reaches the pre-determined critical level. This article considers the reliability qualification test based on a more tightened critical value at the earlier stage to reduce the evaluation testing time and cost. A numerical example is provided to illustrate how to use the developed reliability qualification test.

교통기획예산제도(TPBS) 도입방안에 관한 연구 (A Studyon Implementation of TPBS (Transportation-planning Programming Budgeting System))

  • 김종민
    • 대한교통학회지
    • /
    • 제13권1호
    • /
    • pp.153-165
    • /
    • 1995
  • The budget management in Korea is one-year budget system which is just following int he steps of last years budget plan. This system towards traditional item-by-item and restriction-centered budget system. The budget distribution without establishing and considering rational policy goals and directions have brought inefficient resource allocations. In order to promote the implementation of transportation planning, there are some alternatives like introduction of top-down planning system preparing for the provincial self-government era. In this study, the most efficient alternatives to promote the existing management system is referring by foreign countries transportation planning examples(BVWP system in Germany). First of all, mid-long term transportation and budget planning should be established and then make decisions of resource availability and allocation. In order to provide ration budget planning, introduction of Transportation Planning Programming Budget System(TPBS) has been judged as one of the method of unifying the sysematic transportation improvement planning and budgeting. All transporation planning and related activites can not be expressed in quantity and due to the limitation of excessive cost of analyzing transportation planning and ranking priority, here after, the continuous study to minimize the evaluation cost and introduction of TPBS should be done.

  • PDF

정규모형하에서의 선별검사 및 공정감시 절차의 경제적 설계 (An Economic Design of a Screening and Process Monitoring Procedure for a Normal Model)

  • 권혁무;홍성훈;이민구;김상부
    • 대한산업공학회지
    • /
    • 제26권3호
    • /
    • pp.200-205
    • /
    • 2000
  • An economic process monitoring procedure is presented using a surrogate variable for the case where performance variable is dichotomous. Every item is inspected with a surrogate variable and determined whether it should be accepted or rejected. When an item is rejected, the previous number of consecutively accepted items is compared with a predetermined number r to decide whether there is a shift in fraction nonconforming or not. The conditional distribution of the surrogate variable given the performance variable is assumed to be normal. A cost model is constructed which includes costs of inspection, misclassification, illegal signal, undetected out-of-control state, and correction. Methods of finding the optimum number r and screening limit are provided. Numerical studies on the effects of cost coefficients are also performed.

  • PDF

Item Replacement Policy with Minimal Repair in Stepdown Warranty Model

  • Jae Joong, Kim;Won Joong, Kim
    • 산업경영시스템학회지
    • /
    • 제18권33호
    • /
    • pp.87-92
    • /
    • 1995
  • This paper proposes age replacement policy in stepdown warranty policy. The replacement policy is considered in case of minimally repairable items. And renewal theory is used in analyzing warranty costs. The expected cost per unit time is presented in stepdown warranty policy, free replacement, prorata and hybrid policy. In this article it is assumed that item is replaced at the age of T but the any failure is minimally repaired before the age T. At this point the expected cost per unit time is shown in customer's view point. And numerical example is explored in weibull time-to-failure distribution.

  • PDF