• 제목/요약/키워드: Cost impact

검색결과 1,739건 처리시간 0.034초

Risk Analysis on Offshore Windfarm Industry in South Korea: Based on the Jeonnam Offshore Windfarm Project

  • Kim, Tae Hyun;Kim, Yea-Sang;Chin, Sangyoon;Pallesen, Kristian
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.204-212
    • /
    • 2022
  • Recently, the Korean government has been actively promoting the smart city as their strategic agenda. However, to build smart cities that are greener, the authors believe it is essential to rapidly transit conventional energy sources such as fossil fuels to renewable energy. Although there is a big potential for Offshore wind in Korea, there has not been a full-scale commercial offshore wind farm until today. Since Korea is relatively a new market compared to the EU, it can be risky for developers. The authors will introduce risk management best practices in the offshore wind industry applicable to the Korean environment. This paper will mainly introduce an offshore wind project size of 99 MW. The project is expecting a Finance Close (FC) in Q3 2022, so the project team has prepared a risk register with over 150 risks and levers throughout the project lifecycle. Overall risks include risks with Development Expenditure (DEVEX) impact, a Capital Expenditure (CAPEX) impact, and an Operating Expenditure (OPEX) impact. Based on the identified risks, a more qualitative assessment of Cost and Schedule Impact was conducted. In conclusion, a Monte Carlo simulation was performed to propose a quantitative risk assessment to evaluate a benchmark contingency of the project cost.

  • PDF

고속도로 교량국조물의 통행차량에 의한 충격계수 산정방법 개발 (Development for Determining Impact Factor with Respect to Traffic Loads of Highway Bridges)

  • 구봉근;신재인;류택은;이재범;류연종
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.809-814
    • /
    • 2001
  • In this paper, dynamic properties of a bridge by traffic loads, is proposed as a reasonable method for the determining the impact factor. In addition, impact factors obtained from previous inspection reports were classified by the span length of the bridge, kind of the bridge and type of the bridge and adjusted the result of the impact factor by the statistical method and presented problems. Also, the determining method of the impact fatter using traffic load is proposed and compared the proposed method with the specification code. The method estimating the impact factor by the traffic loads can be efficiently concluded to the response of structure as reflecting the impact factor and saving the investigation cost. Also it is expected to use to maintenance of structures using the usual test of the bridge.

  • PDF

충돌에 대한 흡수 성능을 가진 크래쉬 박스의 형상설계 (Shape Design of Crash Box with Absorption Performance against Impact)

  • 조재웅;한문식
    • 한국생산제조학회지
    • /
    • 제20권2호
    • /
    • pp.169-173
    • /
    • 2011
  • Crash box is introduced to vehicle design to improve the impact performance and reduce the damage of vehicle body at impact speed. The crash box behind bumper can absorb impact energy effectively to improve vehicle safety. Repair cost at collision accident can be cut down by use of this box. The configuration of car body must be designed by considering the characteristic of material due to the deformation of car body happened at impact. Many papers have been published about material of crash box all over the world. The study of crash box with tube expansion type has been going on Korea. This study is done by the simulation analysis about front collisions against 5 kinds of aluminum crash boxes with the basic structure of square section.

모의 측면 충돌 시험 기법 개발 및 응용 (A Study of Development and Application for Side Impact Sled Test)

  • 최현진
    • 한국자동차공학회논문집
    • /
    • 제12권1호
    • /
    • pp.138-144
    • /
    • 2004
  • Occupant protection in the side impact of a vehicle becomes one of the most important issues today. So, to reduce development time and cost, it needs test equipment which conducts an accurate simulation of the side impact crash. This paper describes a new test method for side impact, which utilizes a standard 12inch-HYGE-type sled facility. If a side impact sled test can simulate vehicle intrusion very well, it will contribute to develop full-scale side impact crash performance. The newly developed sled test method enables simulation for dummy motion, injury, door velocity, trim crack, and vehicle structure to be accurate. Ant also this sled test method can be applied to the development of side air-bag.

비재무적인 효과의 화폐가치화를 위한 IT ROI의 평가 (An Assessment of IT ROI by Estimating the Monetary Value of Non-financial Benefits)

  • 김영운;정기원
    • 한국전자거래학회지
    • /
    • 제11권1호
    • /
    • pp.91-112
    • /
    • 2006
  • IT 투자는 기업의 일반적인 투자와는 달리 직접적인 효과를 계량화하기 어려운 부분이 있기 때문에 재무적 측정지표만으로 IT 투자의 성과를 제대로 평가 할 수 없다. 따라서 본 논문은 IT 투자와 그 투자에서 얻어지는 비재무적 효과를 포함한 효과를 화폐가치로 변환 후 투자수익률을 분석하는 방법론을 제시한다. 이 방법론은 IT 소유비용을 체계적으로 분석해서 가시적 인 비용뿐만 아니라 숨겨진 비용도 파악한다. 또한 IT투자로 인한 재무적인 효과와 비재무적인 효과를 화폐가치화 하여 IT ROI를 산출한다. 본 논문은 정보시스템이 기업의 활동에 기여하는 효과를 객관적인 타당성을 확보하여 IT투자 의사결정을 도와주고, IT 투자우선순위를 보다 합리적으로 결정할 수 있어 효율적인 IT투자가 이루어질 수 있는 체계를 제시한다.

  • PDF

동일 플렛폼 차량에 대한 저속 충돌시 손상성 수리성에 미치는 영향에 관한 연구 (A Study on Characteristics of Damageability and Repairability with Similar Platform Type at Low Speed 40% Offset Crash Test)

  • 임종훈;박인송;허승진
    • 한국자동차공학회논문집
    • /
    • 제13권2호
    • /
    • pp.108-113
    • /
    • 2005
  • The damageability and repairability of similar platform type vehicles could be very concerned with design optimization. In all the vehicles crash tested, small size passenger vehicles were weakness in aspect of damageability and repairability. The most critical area appears to be repair cost considering that parts cost is the largest portion of total repair cost segments. Besides repair cost, attaching method of front sidemember and subframe are placed special importance for impact energy absorption and damageability and repairability. So in order to improve damageability and repairability of vehicle structure and body component of the monocoque type passenger vehicles, the end of front side member and front back beam should be designed with optimum level and to supply the end of front side member as a partial condition approx 300mm. The effectiveness of design concept on the 40% offset frontal impact characteristics of the passenger vehicle structure is investigated and summarized.

스무딩된 주문 정책이 공급사슬의 성과지표에 미치는 영향 (Impact of Smoothed Replenishment Ordering Policy on the Performance Measures in Supply Chain)

  • 조면식
    • 한국시뮬레이션학회논문지
    • /
    • 제20권2호
    • /
    • pp.19-27
    • /
    • 2011
  • 본 연구에서는 스무딩된 주문정책이 리드타임, 만족율, 재고비용에 미치는 영향을 연구한다. 이를 위해 스무딩된 order up to 주문정책을 사용하는 하류업체와 make to order 방식을 사용하는 상류업체로 구성된 공급사슬을 사용한다. 스무딩을 하면 리드타임이 예상하는 바와 같이 감소된다. 그러나 스무딩에 의해 하류업체에서의 만족율이 감소하며 재고비용이 증가된다. 한편 상류업체 제조시간의 분산이 평균 제조시간보다 만족율 및 재고비용에 미치는 영향이 더 크므로, 상류업체 제조시간의 변동성을 최소화해야 한다.

Optimal control of impact machines using neural networks

  • Sasaki, Motofumi;Nakagawa, Makoto;Koizumi, Kunio
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1995년도 Proceedings of the Korea Automation Control Conference, 10th (KACC); Seoul, Korea; 23-25 Oct. 1995
    • /
    • pp.91-94
    • /
    • 1995
  • A newly developed discrete-time control design method for impact machines is proposed. It is composed of identification and control using neural networks, where the optimal controller with saturationn and no use of velocity measurements is obtained. By computer simulation, the proposed method is demonstrated to be effective: as the training progresses, the cost function becomes smaller, the proposed control is superior to PID control tuned with Ziegler-Nichols (Z-N) parameters; robust performance with respect to uncertainty, disturbances and working time is so good.

  • PDF

생산시스템의 설치에 따른 비용분석 및 경제성평가 (Cost Analysis and Economic Evaluation for Manufacturing System Installation)

  • 최형호
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.161-172
    • /
    • 1995
  • The paper examines the cost analysis and economic evaluation for manufacturing system installation in a metal industry. The evaluation procedure is consist of four steps. 1) Attribute determination of manufacturing system 2) Cost Estimating 3) Alternative and Model determination of manufacturing system 4) Economic Analysis. The impact of manufacturing system installations on employment displacement and strategic benefit is discussed and suggested to make a coherent determination of company's objective.

  • PDF

품질비용 발생편차와 품질관리활동 그리고 성과간의 관계:품질성과와 납기성과를 중심으로 (The Relationships among the Degree of Quality Cost Deviation, Quality Management Activities and Performance)

  • 김달곤;김순기;정순여
    • 품질경영학회지
    • /
    • 제31권4호
    • /
    • pp.1-18
    • /
    • 2003
  • Quality is a critical competitive factor in today's environment because of the impact of quality on costs and delivery. Many companies regard quality as a key concept of company strategy in order to achieve the competitive edge. Measuring and reporting quality cost is the first step in quality management program. The supposition of quality cost model is that investment in prevention activities will bring rewards from reduced failure costs, and that further investment in prevention activities will show profits from reduced appraisal costs. In this study, the degree of quality cost deviation is conceptualized. This means a deviation between the ideal and present ranking in the amounts of quality cost categories. This study analysed that the effect of its deviation on quality management activity and performance variables. However, there are no difference in these variables. The major reason is that most of companies are endeavoring for quality management but operating quality cost system unsystematically. The review against a prevention and appraisal activity is necessary.