• Title/Summary/Keyword: Cost factor

Search Result 2,576, Processing Time 0.04 seconds

A study on economic analysis of new renewable energy power(photovoltaic, wind power, small hydro, biogas) (신재생에너지 발전(태양광, 풍력, 소수력, 바이오가스)의 경제성 분석 연구)

  • Kim, Chong-Min;Kim, Ki-Young
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.6
    • /
    • pp.70-77
    • /
    • 2008
  • The purpose of this study evaluates a feasibility and economical efficiency of new renewable energy. According as weather change is serious problem now days, every people make attention to the reduction of greenhouse gas. The revitalization of new renewable energy creates the variety of energy source, stability of energy supply and reduction of greenhouse gas. In this study evaluates a feasibility and economical efficiency from new renewable energy of various photo voltaics, wind power, small hydro and biogas. Feasibility does in standard of technical characteristic, politic support, marketability, establishment present condition and development aim. Economical efficiency does in standard of developmental unit cost, utilization factor, equipment life, politic support cost, interest ratio. The results of this study were as follows photo voltaics, wind, small hydropower, biogas in order feasibility is high. Developmental unit cost, utilization factor, equipment life, politic support cost and analyzed the relationship of interest ratio fluctuation and economical efficiency. From all new renewable energy the utilization factor most is important in economical efficiency but necessary utilization factor is difficult because environmental problem.

Design strategy of hybrid stay cable system using CFRP and steel materials

  • Xiong, Wen;Cai, C.S.;Xiao, Rucheng;Zhang, Yin
    • Steel and Composite Structures
    • /
    • v.13 no.1
    • /
    • pp.47-70
    • /
    • 2012
  • To enhance cable stiffness, this paper proposed a combined application of carbon fiber reinforced polymers (CFRP) and steel materials, resulting in a novel type of hybrid stay cable system especially for the cable-stayed bridges with main span lengths of 1400~2800 m. In this combination, CFRP materials can conserve all their advantages such as light weight and high strength; while steel materials help increase the equivalent stiffness to compensate for the low elastic modulus of CFRP materials. An increase of the equivalent stiffness of the hybrid stay cable system could be further obtained with a reasonable increase of its safety factor. Following this concept, a series of parametric studies for the hybrid stay cable system with the consideration of stiffness and cost were carried out. Three design strategies/criteria, namely, best equivalent stiffness with a given safety factor, highest ratio of equivalent stiffness to material cost with a given safety factor, and best equivalent stiffness under a given cost were proposed from the stiffness and cost viewpoints. Finally, a comprehensive design procedure following the proposed design strategies was suggested. It was shown that the proposed hybrid stay cable system could be a good alternative to the pure CFRP or traditional steel stay cables in the future applications of super long span bridges.

A Performance Variation by Scaling Factor in NM-MMA Adaptive Equalization Algorithm (NM-MMA 적응 등화 알고리즘에서 Scaling Factor에 의한 성능 변화)

  • Lim, Seung-Gag
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.18 no.2
    • /
    • pp.105-110
    • /
    • 2018
  • This paper compare the adaptive equalization performance of NM-MMA (Novel Mixed-MMA) algorithm which using the mixed const function by scaling factor values. The mixed cost function of NM-MMA composed of the appropriate weighted addition of gradient vector in the MMA and SE-MMA cost function, and updating the tap coefficient based on these function, it is possible to improve the convergence speed and MSE value of current algorithm. The computer simulation was performed in the same channel, step size, SNR environment by changing the scaling factor, and its performance were compared appling the equalizer output constellation, residual isi, MD, MSE, SER. As a result of computer simulation, the residual values of performance index were reduced in case of the scaling factor of MMA cost function was greater than the scaling factor of SE-MMA. and the convergence speed was improved in case of the scaling factor of SE-MMA was greater than the MMA.

A Study on the Derivation and Sensitivity Analysis of the Adjustment Factor in the Software Cost Estimation Guidelines (소프트웨어 사업대가기준 보정계수의 유도 및 민감도 분석)

  • Byun, Boon-Hee;Kwon, Ki-Tae
    • The KIPS Transactions:PartD
    • /
    • v.15D no.1
    • /
    • pp.61-72
    • /
    • 2008
  • One of the most significant tasks of software development project is to know how much it will be the software development cost in the early stage of software development cycle. The software development environment and technology are changing very rapidly. For accuracy, we should apply those to the software cost estimation. And it is important that we select the suitable adjustment factor and the value of a suitable adjustment factor. For that, this paper have applied the method of AHP. And we have also analyzed the sensitivity of the adjustment factor which is influenced by decision metrics. In conclusion, the value of the application type adjustment factor is responded more sensitively to the data complexity and the control complexity than processing complexity. And the value of the language adjustment factor is responded more sensitively to the supplying manpower and the time of the coding than the time of the debugging. In the future, we will research the selection of an additional adjustment factor and a suitable value of the adjustment factor which are influenced by the environment and the technology of the domestic software development. And then, in the language adjustment factor, we will try to calculate the value about the individual programming language.

A Study on the Equilibrium-Pricing Mechanism of Apartment (아파트의 가격형성 메커니즘에 관한 연구)

  • Chung, J.-Young;Yoon, Tae-Kwon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.65-74
    • /
    • 2008
  • The aim is to get comprehensive view point for the price of apartment. Apartment construction cost is the sun of land cost and building cost. Land price reflects the value of location where building stands. When the gap between price and affordability is narrow enough, effective demand promote apartment construction. The today's trends of rising price, which began in apartment housing, spreads to real estates market and finally overall consumer price. Problem is that price is decided only by supplier's interest. Equilibrium-pricing is common process in housing market. However it is important to review hedonic price and the factor of housing services and focused on the affordability of demanders. AHP analysis was used to study real needs and preference of demanders and dealt with 200 interviewees with brief checklists. We found that social factor is more important than building cost or site development. Especially location of apartment is most important to affect environment quality and accessibility to facilities.

Analyses of the Cost function for the Reductions of the Dynamic Response and the Vibrational Intensity of a Discrete System and Its Elastic Supporting Beam (이산계와 탄성 지지보의 동응답 및 진동 인텐시티 저감을 위한 목적함수 해석)

  • Kim, Gi-Man;Choi, Seong-Dae
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.20 no.1
    • /
    • pp.83-91
    • /
    • 2010
  • In this paper, the feasibility of the cost function having two control factors were discussed in compared to two others which has one different control factor respectively. As of the control factors, the dynamic response of a discrete system and the vibrational intensity at the reference point which is the connecting point of a discrete system to a flexible beam were controlled actively by the control force obtained from the minimization of the cost function. The method of feedforward control was employed for the control strategy. The reduction levels of the dynamic response of a discrete system and the vibrational intensity at a reference point, and also the input power induced by the control force were evaluated numerically in cases of the three different cost functions. In comparison with the results obtained from the cost functions of one control factor, which is the dynamic response or the vibrational intensity, in most cases of the cost function of two control factors the better or similar results were obtained. As a conclusion, it is surely noted that both the dynamic response and the vibrational intensity of the vibrating system be controlled up to the expected level by using the single cost function having two control factors.

Mooring Cost Sensitivity Study Based on Cost-Optimum Mooring Design

  • Ryu, Sam Sangsoo;Heyl, Caspar;Duggal, Arun
    • Journal of Ocean Engineering and Technology
    • /
    • v.23 no.1
    • /
    • pp.1-6
    • /
    • 2009
  • The paper describes results of a sensitivity study on an optimum mooring cost as a function of safety factor and allowable maximum offset of the offshore floating structure by finding the anchor leg component size and the declination angle. A harmony search (HS) based mooring optimization program was developed to conduct the study. This mooring optimization model was integrated with a frequency-domain global motion analysis program to assess both cost and design constraints of the mooring system. To find a trend of anchor leg system cost for the proposed sensitivity study, optimum costs after a certain number of improvisation were found and compared. For a case study a turret-moored FPSO with 3 ${\times}$ 3 anchor leg system was considered. To better guide search for the optimum cost, three different penalty functions were applied. The results show that the presented HS-based cost-optimum offshore mooring design tool can be used to find optimum mooring design values such as declination angle and horizontal end point separation as well as a cost-optimum mooring system in case either the allowable maximum offset or factor of safety varies.

Service Deployment Strategy for Customer Experience and Cost Optimization under Hybrid Network Computing Environment

  • Ning Wang;Huiqing Wang;Xiaoting Wang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.11
    • /
    • pp.3030-3049
    • /
    • 2023
  • With the development and wide application of hybrid network computing modes like cloud computing, edge computing and fog computing, the customer service requests and the collaborative optimization of various computing resources face huge challenges. Considering the characteristics of network environment resources, the optimized deployment of service resources is a feasible solution. So, in this paper, the optimal goals for deploying service resources are customer experience and service cost. The focus is on the system impact of deploying services on load, fault tolerance, service cost, and quality of service (QoS). Therefore, the alternate node filtering algorithm (ANF) and the adjustment factor of cost matrix are proposed in this paper to enhance the system service performance without changing the minimum total service cost, and corresponding theoretical proof has been provided. In addition, for improving the fault tolerance of system, the alternate node preference factor and algorithm (ANP) are presented, which can effectively reduce the probability of data copy loss, based on which an improved cost-efficient replica deployment strategy named ICERD is given. Finally, by simulating the random occurrence of cloud node failures in the experiments and comparing the ICERD strategy with representative strategies, it has been validated that the ICERD strategy proposed in this paper not only effectively reduces customer access latency, meets customers' QoS requests, and improves system service quality, but also maintains the load balancing of the entire system, reduces service cost, enhances system fault tolerance, which further confirm the effectiveness and reliability of the ICERD strategy.

New High Efficiency Zero-Voltage-Switching AC-DC Boost Converter Using Coupled Inductor and Energy Recovery Circuit (결합 인덕터 및 에너지 회생 회로를 사용한 새로운 고 효율 ZVS AC-DC 승압 컨버터)

  • Park, Gyeong-Su;Kim, Yun-Ho
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.50 no.10
    • /
    • pp.501-507
    • /
    • 2001
  • In this paper, new high-efficiency zero voltage switching (ZVS) AC-DC boost converter is proposed to achieve power factor correction by simplifing energy recovery circuit. A lot of high power factor correction circuits have been proposed and applied to increase input power factor and efficiency. Most of these circuits may obtain unity power factor and achieve sinusoidal current waveform with zero voltage or/and zero current switching. However, it is difficult for them to obtain low cost, small size, low weight, and low noise. The topology proposed to improve these problems can compact the devices in circuit and can achieve high efficiency ZVS AC-DC boost converter. Simulation and experimental results show that this topology is capable of obtaining high power factor and increasing the efficiency of the system.

  • PDF

New Factor for Balancing Cost and Delay Unicast Algorithm Based on Statistic Interval Estimation (통계적 구간 추정에 근거한 비용과 지연시간에 조화로운 유니캐스트 라우팅을 위한 새로운 인자)

  • Kim, Moon-Seong;Bang, Young-Cheol;Choo, Hyun-Seung
    • Journal of the Korea Society for Simulation
    • /
    • v.16 no.1
    • /
    • pp.1-9
    • /
    • 2007
  • The development of efficient Qualify of Service (QoS) routing algorithms in high speed networks is extremely difficult to achieve, because in order to operate, divergent services require various quality conditions. If the parameter of concern is to measure the delay on a specific link, the routing algorithm obtains the Least Delay (LD) path. Meanwhile, if the parameter is to measure the link cost, the Least Cost (LC) path is calculated. The Delay Constrained Least Cost (DCLC) path problem of the mixed issues on the LD and LC has been shown to be NP-hard. The path cost of LD path is relatively more expensive than that of the LC path, and the path delay of the LC path is relatively higher than that of the LD path in the DCLC problem. In this paper, we introduce the new factor for balancing cost and delay. The simulation result shows that our introduced factor is satisfied to solve the DCLC problem.

  • PDF