• Title/Summary/Keyword: Cost estimation standards

Search Result 68, Processing Time 0.028 seconds

Estimation of Rice Grain Yield Distribution Using UAV Imagery (무인비행체 영상을 활용한 벼 수량 분포 추정)

  • Lee, KyungDo;An, HoYong;Park, ChanWon;So, KyuHo;Na, SangIl;Jang, SuYong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.4
    • /
    • pp.1-10
    • /
    • 2019
  • Unmanned aerial vehicle(UAV) can acquire images with lower cost than conventional manned aircraft and commercial satellites. It has the advantage of acquiring high-resolution aerial images covering in the field area more than 50 ha. The purposes of this study is to develop the rice grain yield distribution using UAV. In order to develop a technology for estimating the rice yield using UAV images, time series UAV aerial images were taken at the paddy fields and the data were compared with the rice yield of the harvesting area for two rice varieties(Singdongjin, Dongjinchal). Correlations between the vegetation indices and rice yield were ranged from 0.8 to 0.95 in booting period. Accordingly, rice yield was estimated using UAV-derived vegetation indices($R^2=0.70$ in Sindongjin, $R^2=0.92$ in Donjinchal). It means that the rice yield estimation using UAV imagery can provide less cost and higher accuracy than other methods using combine with yield monitoring system and satellite imagery. In the future, it will be necessary to study a variety of information convergence and integration systems such as image, weather, and soil for efficient use of these information, along with research on preparing management practice work standards such as pest control and nutrient use based on UAV image information.

A Benchmarking Study on CM Fee Estimation (해외사례 벤치마킹에 기반한 국내 CM 대가체계 개선 시사점 도출)

  • Kim, Sang-Bum;Lee, Jeong-Dae;Kim, Jae-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.96-106
    • /
    • 2008
  • The Korean Construction Industry significantly contributed to the Korean economic development not only by preparing the domestic infrastructure but also by successfully conducting various international projects. However, major incidents such as the collapse of Sung-Su Bridge and Sam-Pung Department Store along with stagnation of Korean Economy have raised questions about underlying systematic problems of the Korean Construction Industry. As a solution to resurrect the Korean Construction Industry, the Construction Management (CM) system introduced in late 1990's and increasingly utilized as an innovative delivery system. Despite of the fast growth of CM, the performance of CM has not been up to the hype and low CM fee has been identified as one of the main reasons of unsatisfactory CM performance. Therefore, this research attempted to propose ways of improving 'CM Fee Guidelines' published by Korean Ministry of Construction and Transportation by conducting a benchmarking study on Global Standards of estimating CM Fee. International organizations benchmarked in this research include CMAA, ASCE, DOL, DOE, etc. Various investigation and analysis revealed that Korean 'CM Fee Guidelines' need to significantly modified comparing to Global Standards. This research also tried to prepare recommendations to improve the CM deliver system focusing on the 'Method of CM Fee Estimation' and Selection of a CM firm as an owner's agent.

Improvement of CM Fee Estimation Criteria for Efficient CM Service (건설사업관리업무 효율화를 위한 대가 산출기준 개선방향)

  • Cho, Youngjun;Sung, Youngmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.105-112
    • /
    • 2019
  • As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.

A Study on the Method for the Estimate of Construction Management in the Program Management (종합건설사업관리 사업관리비용산정을 위한 방법연구 - 기획단계에서 실시설계 입찰까지 -)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.3-12
    • /
    • 2014
  • With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work.

A Study on Dam Exterior Inspection and Cost Standards using Drones (드론을 활용한 댐 외관조사 및 대가기준에 대한 연구)

  • Kim, Tae-Hoon;Lee, Jai-Ho;Kim, Do-Seon;Lee, Suk-Bae
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.3
    • /
    • pp.608-616
    • /
    • 2021
  • Purpose: Safety inspections by existing personnel have been limited in evaluation and data securing due to concerns about the safety of technicians or difficulty in accessing them, and are becoming a bigger problem as the number of maintenance targets increases due to the aging of facilities. As drone technology develops, it is possible to ensure the safety of personnel, secure visual data, and diagnose quickly, and use it is increasing as safety inspection of facilities by drones was introduced recently. In order to further enhance utilization, it is considered necessary to base a consideration standard for facility appearance investigation by drones, and in this paper, research was conducted on dams. Method: To calculate the quality, existing domestic safety inspection and drone-related consideration standards were investigated, and procedures related to safety inspection using drones were compared and analyzed to review work procedures and construction types. In addition, empirical data were collected through drone photography and elevation image production for the actual dam. Result: Work types for safety inspection of facilities using drones were derived, and empirical survey results were collected for two dams according to work types. The existing guidelines were applied for the adjustment ratios for each structural type and standard of the facility, and if a meteorological reference point survey was necessary, the unmanned aerial vehicle survey of the construction work standard was applied. Conclusion: The finer the GSD in appearance investigation using drones, the greater the number of photographs taken, and the concept of adjustment cost was applied as a correction to calculate the consideration standard. In addition, it was found that the problem of maximum GSD indicating limitations should be considered in order to maintain the safe distance.

The Effectiveness of Tax Incentive Policy on R&D Expenditures (기술개발지원 조세제도의 효과와 정책 시사점)

  • 송종국
    • Journal of Technology Innovation
    • /
    • v.5 no.1
    • /
    • pp.181-205
    • /
    • 1997
  • There has been considerable controversy over the impacts of the tax credit on R&D expenditures in many countries. Korea has adopted various kinds of tax credit system to stimulate private firm' R&D expenditures. Korean government, Recently, is trying to reform tax system to reduce tax credit programmes according to Uruguay Round agreement and in line with OECD policy standards. The purpose of this paper is to analyze the effectiveness of current tax credit system on technology innovation in Korea and derive some policy implications over tax reform. In this paper, firstly, I investigate the size of tax reduction effects from each program in theoretical models and simulate the actual rate of individual tax incentive to a unit of R&D expenditure. I find that theoretically the reserve fund for technology development program has given the largest tax reduction effects to private firms irrespective of the R&D incentive system reform. Tax credit on R&D expenditure also has been very effective instrument to firm's tax reduction. Secondly, I try to measure the effectiveness of tax credit through the estimation of effective margianl tax rate between with the system and without the system of credit on R&D expenditure during the tax credit reform periods. I find that the tax credit on R&D has lowered firm's investment cost since the system introduced. I also have strong results that there has been a positive relation between the fluctuation of firm's R&D expenditure and the change of effective marginal tax rate. I suggest that it is better to sustain the system of tax credit on R&D for a while to increase firm's R&D expenditure.

  • PDF

A Study on the Estimation of Optimal ESS Capacity Considering REC Weighting Scheme (REC 가중치를 고려한 최적 ESS 용량 산정에 관한 연구)

  • Lee, Sungwoo;Kim, Hyoungtae;Shin, Hansol;Kim, Tae Hyun;Kim, Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.8
    • /
    • pp.1009-1018
    • /
    • 2018
  • As the generation of renewable energy increases rapidly, the stability of the grid due to its intermittency becomes a problem. The most appropriate way to solve this problem is to combine and operate the renewable generators with the ESS(Energy Storage System). However, since the revenues of operating the ESS are less than the investment cost, many countries are implementing various incentive policies for encouraging investment of the ESS. In this paper we estimated optimal capacity of the ESS to maximize profits of renewable energy generation businesses under the incentive policy of Korea and analyzed the impact of the incentive policy on the future electric power system of Jeju island. The simulation results show that the incentive policy has significantly improved the profitability of the renewable energy businesses generation business. But the volatility of the net demand has increased as the energy stored in the ESS is discharged intensively at the time of the incentive application.

Analysis on the Application of Estimation Criteria for Construction Cost of Masonry and Demolition (돌쌓기 및 헐기 공사의 공사비산정기준 적용실태 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.234-235
    • /
    • 2019
  • In the stacking and pitching items of the stone masonry and demolition process presented by 2018's standard of estimate, 7 estimating standards are presented according to the depth of masonry stone, and it is presented that the quantity per unit increases as the depth of masonry stone grows. As a result of analyzing the application status in the site, it is shown that 2 or 3 stones are mainly used according to the stone sizes regardless of the depth of masonry stone, and that as the size of the stone becomes larger, the quantity per unit decreases due to the size per square meter(㎡). Also, in most of sites, machine construction is mainly carried out by excavators with clampers attached to them. Therefore, in the 2019's application standard of estimate, it is analyzed that the size is simplified down to 3 sizes reflecting the site application status and that it is revised as a standard reflecting the result that as the stone size becomes bigger, the productivity increases.

  • PDF

A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation (BIM 견적 작업 생산성 향상을 위한 업무 환경 조성에 관한 연구)

  • Kim, Seong-Ah;Park, Gweon;Song, Byeong-Seob;Choi, Chel-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.56-65
    • /
    • 2016
  • Many cases have mentioned the effect by applying BIM on the media such as at conferences, workshops, reports, ect. These cases reported that costs could be saved directly by prevention the need to re-do and reconstruct caused by using BIM. BIM users mentioned that using BIM has potential value in saving costs. The benefits of the BIM include intangible value that cannot be estimated in costs, such as reducing work time and improving productivity. However, the financial value of using BIM, such as Return on Investment, has not yet been exposed, and BIM users have a negative view of the financial value of BIM in Korea. Therefore, this study has researched the effects of applying BIM on construction estimate services in view of business productivity, not finance. This study compared the traditional and BIM based estimation, and verified the effect of estimating BIM through work sampling. This study investigated a precondition for getting the effects of BIM based estimation. The results show a need for BIM education, 3D Modeling standards, and database on quantity in order to improve product ivity and reduce work time on BIM based estimation

Estimation of Parking Lot Planning and, Suggestion of Parking Planning Methods Considering Vehicle Types (차종을 고려한 주차 계획단위 산정 및 주차계획 방법 제시)

  • Kwon, Sung-Dae;Park, Je-Jin;Kim, Joong-Hyo;Ha, Tae-Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.755-764
    • /
    • 2011
  • At the present, planning and installation of parking space sections and lane width are implemented in accordance with the installation standard and parking lot structure by the enforcement regulations of the Parking Act. While large and RV (Recreational Vehicle) vehicles have increased in number recently, parking is complex with improper installation standards. It causes serious problems, including vehicle vandalism, increased civil complaints, travel inconveniences for parking lot users, management and maintenance issues for parking lots, and so forth. The study, therefore, determined that the practical and appropriate realignment of parking unit adjustment and lane width regulations are essential. The study conducted prior review on domestic parking sections and change cases of composition by vehicle types, including the component ratio of domestic and foreign vehicles, width of vehicle by types in order to examine the parking problems that account for a increasing social issues, and provided parking plan methods by types of vehicle, as well as reform and reaction plans for parking unit adjustment and lane width considering security and smooth traffic flow. After comparing and analyzing between estimated installation of parking space and lane width and internal and external cases, the study suggests the improvement that considers expenses and convenience of a driver. Also, it shows installation of parking space that considers traffic safety, improvement of lane width, and parking way depends on vehicle types. By providing estimation for parking planning and parking planning methods that secure safe and smooth traffic flow within a parking lot, the study will contribute to the development of improved alternatives for cost-effective traffic safety and set-up structure, including installation standards of parking lots.