• Title/Summary/Keyword: Cost control

Search Result 5,844, Processing Time 0.031 seconds

Developing an Assessment Model for Major Cost-Increasing Factors in Skyscraper Construction Using FMEA (FMEA 기법을 이용한 초고층 건축시공의 원가 증가요인 평가모델의 개발 방법론 연구)

  • Kim, Ki-Kook;Gang, Ji-Sun;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.507-510
    • /
    • 2006
  • Recently, the skyscrapers are increasing. There are major cost-increasing factors to management in the skyscraper construction. The more projects are large like the skyscraper construction, the more systematic methods and tools are needed for cost control. This study proposes an assessment model for major cost-increasing factors in skyscraper construction using FMEA.

  • PDF

An economic design of CUSCORE control chart for quality characteristics with exponential distribution (제품의 수명특성 관리를 위한 누적점수 관리도의 경제적 설계)

  • Kim, Jong-Gurl;Jeong, Young-Min
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.31-39
    • /
    • 1993
  • This paper considers a procedure for the economic design of a cumulative score(CUSCORE) control chart and more sensitive than X-type control chart for small shift to control the mean of a process with a exponentially distributed quality characteristic. An expected loss - cost model as a function of design variables(sample size, sampling interval, scoring limit and decision limit) is derived. Direct search techniques are used to optimize the model subject to ARL in control. Numerical examples and sensitivity analysis of the model are presented. For selected values of situation parameters a comparison study with CUSUM charts is given. CUSCORE control charts compare favourably with CUSUM charts in cost for speedy production process. The proposed control chart can be directly applied for controlling the lifetime characteristics.

  • PDF

A direct adaptive control using generalized predictive control (일반형 예측제어를 이용한 직접 적응 제어)

  • Lee, Young-Il;Kwon, Wook-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 1989.11a
    • /
    • pp.376-379
    • /
    • 1989
  • In this paper a direct adaptive control scheme which minimizes N-step cost function is proposed. It is derived via GPC control algorithm under the assumption that we know N-step unit step response of the given system. The proposed adaptive scheme is shown to have the same stability properties with the RHTC control, and require very small amount of calculation compared with other adaptive algorithms which minimize N-step cost function. And it is shown through simulations that the proposed adaptive algorithm is robust to the variation of the unit step response which is assumed to be known.

  • PDF

Active Control of Vibrational Intensity at a Reference Point in an Infinite, Elastic Plate (무한 탄성 평판상의 기준점에 전달되는 진동인텐시티의 능동제어)

  • 김기만
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.11 no.4
    • /
    • pp.22-30
    • /
    • 2001
  • In this paper, active control of vibrational intensity at a reference point in an infinite, elastic plate was discussed. The plate is excised harmonically by a vibrating source, which has a vertical point force. The optimal condition of controller was investigated to minimize the vibrational intensity being transmitted from the vibrating source to a reference point. Hence the method of feedforward control was employed for the control strategy and then the cost function was evaluated to find the optimal control force. Three types of control force (Vertical force, Moment, and Coupling force (a set of vertical force and moment) ) and controller's positions were examined to define the optimal condition of the controller. The vibrational intensity at a reference point was found to be reduced down to a zero level, compared with the uncontrolled case. Especially maximum reduction of vibrational intensity was achieved when the controller was collinearly positioned between a vibrating source and a reference point.

  • PDF

An Induction Motor Motion Control System with Direct Torque Control (직접 토크제어에 의한 유도전동기의 위치제어 시스템)

  • Kim, Nam-Hun;Kim, Min-Ho;Kim, Dong-Hee;Kim, Min-Huei
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1036-1038
    • /
    • 2000
  • This paper presents an implementation of digital motion control system of induction motor vector drives with a direct torque control(DTC) using the 16bit DSP TMS 320F240. The DSP controller enable enhanced real time algorithm and cost-effective design of intelligent controllers for induction motors which can be yield enhanced operation, fewer system components, lower system cost, increased efficiency and high performance. The system presented are stator flux observer of current model that inputs are current sensing of motor terminal and rotor angle, and optimal switching look-up table by using fully integrated control software. The developed system are shown a good motion control response characteristic results and high performance features using 2.2Kw general purposed induction motor.

  • PDF

New MPPT Control Strategy for Two-Stage Grid-Connected Photovoltaic Power Conditioning System

  • Bae, Hyun-Su;Park, Joung-Hu;Cho, Bo-Hyung;Yu, Gwon-Jong
    • Journal of Power Electronics
    • /
    • v.7 no.2
    • /
    • pp.174-180
    • /
    • 2007
  • In this paper, a simple control method for two-stage utility grid-connected photovoltaic power conditioning systems (PCS) is proposed. This approach enables maximum power point (MPP) tracking control with post-stage inverter current information instead of calculating solar array power, which significantly simplifies the controller and the sensor. Furthermore, there is no feedback loop in the pre-stage converter to control the solar array voltage or current because the MPP tracker drives the converter switch duty cycle. This simple PCS control strategy can reduce the cost and size, and can be utilized with a low cost digital processor. For verification of the proposed control strategy, a 2.5kW two-stage photovoltaic grid-connected PCS hardware which consists of a boost converter cascaded with a single-phase inverter was built and tested.

An Economic Design of the Chart with Variable Sample Size Scheme

  • Park, Chang-Soon;Ji, Seon-Su
    • Journal of the Korean Statistical Society
    • /
    • v.23 no.2
    • /
    • pp.403-420
    • /
    • 1994
  • An economic design of the $\bar{X}-R$ chart using variable sample size (VSS) scheme is proposed in this paper. In this design the sample size at each sampling time changes according to the values of the previous two sample statistics, sample mean and range. The VSS scheme uses large sample if the sample statistics appear near inside the control limits and smaller sample otherwise. The set of process parameters, such as the sampling interval, control limits and the sample sizes, are chosen to minimize the expected cost per hour. The efficiency of the VSS scheme is compared to the fixed sample size one for cases where there is multiple of assignable causes. Percent reductions of the expected cost in the VSS design are calculated for some given sets of cost parameters. It is shown that the VSS scheme improves the confidence of the procedure and performs statistically better in terms of the number of false alarms and the average time to signal, respectively.

  • PDF

A Low-Cost Current-Sensing Scheme for MOSFET Motor Drives (MOSFET을 이용한 전동기 구동을 위한 저가격형 전류검출법)

  • 장성동;정재호;박종규;이균정;신휘범
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.8 no.1
    • /
    • pp.40-47
    • /
    • 2003
  • A low-cost current-sensing scheme for the motor drives with MOSFET is described. Many motor drives usually employ the common current sensors to measure current for the purpose of control or protection. These current sensors, however, significantly burden the power circuit with the size and cost. The proposed current-sensing scheme utilizes information concerning MOSFET's On-voltage and On-resistance. An analogue circuit detecting On-voltage can overcome the above disadvantages because the circuit is small and is made at a low cost, and the fuzzy inference for On-resistance is also simply designed based on MOSFET's characteristics. The validity of this scheme will be experimentally verified by adopting the current control of a battery car.

Optimal Design of Process-Inventory Network Considering Backordering Costs (역주문을 고려한 공정-저장조 망구조의 최적설계)

  • Yi, Gyeongbeom
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.20 no.7
    • /
    • pp.750-755
    • /
    • 2014
  • Product shortage which causes backordering and/or lost sales cost is very popular in chemical industries, especially in commodity polymer business. This study deals with backordering cost in the supply chain optimization model under the framework of process-inventory network. Classical economic order quantity model with backordering cost suggested optimal time delay and lot size of the final product delivery. Backordering can be compensated by advancing production/transportation of it or purchasing substitute product from third party as well as product delivery delay in supply chain network. Optimal solutions considering all means to recover shortage are more complicated than the classical one. We found three different solutions depending on parametric range and variable bounds. Optimal capacity of production/transportation processes associated with the product in backordering can be different from that when the product is not in backordering. The product shipping cycle time computed in this study was smaller than that optimized by the classical EOQ model.

A Study on an application of PERT/CPM for process Management (공정관리를 위한 PERT/CPM 활용에 관한 연구)

  • 이종철;강규철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.9
    • /
    • pp.7-18
    • /
    • 1983
  • In this paper, I have approached the problem of scheduling that can be reasonably cost down and duration down in the tenement house by using PERT/CPM technics. The tenement house of 'M' construction company consistute 78 element workings in total. I made out the net-work scheduling through 78 element workings, after calculating by computer, G-COS 101, I reduced the duration and cost by MCX, and then enforced from the least cost slope to six times. Resulty, I attained PERT/CPM scheduling for construction scheduling ; a) Make Possible the effectiveness budgeting control b) How the scientific materials c) Make possible the reasonably decision making d) Strengthen the material control by relevance of element workings e) Make possible the duration down through the least cost.

  • PDF