• Title/Summary/Keyword: Cost Down

Search Result 895, Processing Time 0.033 seconds

Dental implant cost by top-down approach (하향식(Top-down)방식을 적용한 치과 임플란트 원가산정)

  • Shin, Hosung;Kim, Min-Young
    • The Journal of the Korean dental association
    • /
    • v.52 no.7
    • /
    • pp.416-424
    • /
    • 2014
  • The purpose of this study is to analyze the cost of dental implant by top-down method and, on that basis, to provide salient information for the suitable standard of dental insurance fee. A survey data and accounting documents from 36 samples of dental clinics secured with the organisation authority are used and analysed for extracting the representative sample of dental clinic. A researcher visited the dental clinics in person and conducted additional interviews in the omitted case of accounting documents. A dental implant cost by top-down method was estimated to 1,430,000 won. Labor cost accounted for 43% of the total cost structure, ranking it 1st and, management cost, material cost and interest cost on investment cost in order are investigated. Labor cost counts of the total cost that shows the similar aspect to the existing result. Cost in cost accounting of medical care would be used for the judge that cost pursed value for dental service, not price or fee.

A Developmental Study on the Cost Down of the Architectural Temporary Work (건축 가설공사의 COST DOWN 기법 연구)

  • Choi, Jang-Soon;Kim, Sam-Neung;Jang, Hwa-Jung;Lee, Jae-Young
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.5 no.3
    • /
    • pp.1-7
    • /
    • 2003
  • This study is to find out the betterment way of cost down in the architectural temporary work. To do so, it is more important to check every case above all and find and choice optimum way fitting a scene of a construction field. In addition, in case that the way to apply in proportion to a given condition is complicated, the way to find out cost down way is to adopt the individual peculiarity instead of the generality. Hereupon this study is rather to find out the better way to reduce such as material and manpower cost than to leave matters not to be settled to get the best way in the existing temporary work. So this study is composed with finding the existing problems, fixing the focus about the developmental way to reduce cost in the exterior and interior temporary work, presenting the new construction way and describing the merits and attentions of an improved exterior and interior temporary work.

  • PDF

A study on the logistics cost reduction in textile industries by introducing Pad Pool System (PPS(PAD POOL SYSTEM) 도입에 의한 섬유업계 물류비 절감에 관한 연구)

  • Kwon An Sik;Park In Sul
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.2
    • /
    • pp.95-106
    • /
    • 2005
  • Many Korean companies are challenged to reduce logistics cost and meet environmental-friendly logistics. The textile companies in harsh competition are requested to make improvement on their logistics environment to cut down the total cost. However, they have reached the limit on improving the manufacturing process. We believe that the logistics department is the most improvable part at present. Improving logistics will be highly effective to cut down the total cost. In this study, we present Pad Pool System(PPS) as the solution to save their logistics cost. PPS, which means the shared use of Styrofoam pads, will enable the textile companies to cut down their cost and strengthen enterprise competitiveness. Also, PPS will be helpful reducing environmental disruption because the system reuses retrieved Styrofoam pads many times.

A study on the development of a web-based cost management system of building interior projects (웹을 기반으로 한 실내건축공사의 원가관리 시스템 개발에 관한 연구)

  • 송영규
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.3
    • /
    • pp.197-204
    • /
    • 2004
  • This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.

A Study on an application of PERT/CPM for process Management (공정관리를 위한 PERT/CPM 활용에 관한 연구)

  • 이종철;강규철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.9
    • /
    • pp.7-18
    • /
    • 1983
  • In this paper, I have approached the problem of scheduling that can be reasonably cost down and duration down in the tenement house by using PERT/CPM technics. The tenement house of 'M' construction company consistute 78 element workings in total. I made out the net-work scheduling through 78 element workings, after calculating by computer, G-COS 101, I reduced the duration and cost by MCX, and then enforced from the least cost slope to six times. Resulty, I attained PERT/CPM scheduling for construction scheduling ; a) Make Possible the effectiveness budgeting control b) How the scientific materials c) Make possible the reasonably decision making d) Strengthen the material control by relevance of element workings e) Make possible the duration down through the least cost.

  • PDF

A Study of Optimal Fuel-Mix Considering Power Generation Operation (발전기 출력특성을 고려한 최적전원구성 연구)

  • Jung, Young-Beom;Kim, Kil-Sin;Park, Chang-Ho;Yoon, Yong-Beom
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.10
    • /
    • pp.28-37
    • /
    • 2011
  • Though Korea has introduced CBP(Cost Based pool) power trading system since 2001, long-term Generation system planning has been executed by government for Cost minimization every 2 years. Until currently the model which is used for Generation system planning and best-mix only considers cost minimization and total yearly or quarterly electricity demand every year. In a view point of one day power supply operation, technical characteristics, like the ramp up/down rate of total generation system, minimum up/down time and GFRQ(Governor Free Response Quantity), are very important. this paper analyzes Optimal Fuel-Mix for 2022 Korea generation system satisfying these constraints of each fuel type and considering pump storage plants, construction cost and $CO_2$ emission charge Using MILP(Mixed Integer Linear Programming) method. Also the sensitivity analysis which follows in future power industry environmental change accomplished.

A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey (지하철골공사 공사비산정기준 마련을 위한 현장조사 연구)

  • Song, Taeseok;Han, Sangjun;An, Bangyul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

SiC Mosfet's Application

  • Kim, Simon
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.519-521
    • /
    • 2018
  • For most of application, total system cost is first priority to Engineer. Approach for making system cost down can be to reduce cooling cost by selecting low loss item or reducing filter cost by increasing frequency. SiC Mosfet ($CoolSiC^{TM}$) can approach both of case. This paper shows market-needs and reviews each application with SiC.

  • PDF

Comparative Analysis of Construction Productivity for Modernized Korean Housing (Hanok) (보급형 신한옥 개발을 위한 건설 생산성 분석)

  • Kim, Min;Kim, Yesol;Lee, YunSub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.107-114
    • /
    • 2013
  • The interest in traditional Korean housing has greatly increasing in Korean housing market. However, it is difficult to wildly disseminate for a high construction cost reason. In order to effectively facilitate the Hanok construction, Korean government has initiated a project that develops a new style Korean housing, which meets the requirements of low cost and modernized life style. Cost of building is mainly affected by materials and construction methods. Hanok has some special commodities those significantly impact the cost. In order to effectively cut down the costs, well-organized planning for costs is very important. Also, improving the productivity by utilizing new materials and methods can result in cost down. In this context, this paper compared and analyzed two different types of Korean housing; one is a modernized Korean house which used new materials and methods, the other is a traditional Korean house which was build up by purely traditional methods. Productivity has also been compared and analyzed for 5 major commodities between two types of models. Based on these comparative data, effect of cost down by new model has been analyzed. As a result it is confirmed that by using the new materials and methods could highly effect to increasing productivity and cost down. Especially, the cost of Roofing have been more influenced by using new material while the Wood and Finishes have been influenced by new construction method. Construction cost of Foundation (Earthwork, Concrete, Masonry) and Openings were influenced both factors, changing of materials and methods.

A Study on the Construction Process Management of the Top-Down Construction Method (Top-Down 공사의 공정관리 방법 연구)

  • Kang Hyun-Jung;Rhim Hong-Chul;Lee Ghang;Yun Dae-Jung;Kim Sang-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.133-136
    • /
    • 2006
  • The top-down construction method is an excavation and substructure construction method by excavating earth and building slabs from the ground level to the bottom of a building. The top-down method can be categorized into several types by its process and other technical details. Some of commonly used top-down methods in Korea today are S.O.G., N.S.T.D., and S.P.S. Among these, one method is chosen depending on construction field conditions, cost, construction time and so on. This study explores several factors that may affect the selection of a top-down method. This paper reports preliminary survey results with 54 top-down construction experts and comparison results of 5 top-down construction sites.

  • PDF