Information technology (IT) convergence have been recognized one of the key drivers in the industry perspective. Especially, IT convergence have been one of the most important innovative way for defense sector. Korea government established IT convergence policy in 2008 and have been applying it to the core industry such as automotive, shipbuilding and defense industries. Recently, the creative vitamin project has been launched. Vitamin 'D' means the way to create the value of defense industry. This research analyzes and evaluates various IT convergence business models based on an operation of defense IT convergence center from 2011 to 2014, which is the industry IT convergence centers. Defense IT convergence business models can be classified into four types of mission area as follows : weapon acquisition and management, military intelligence, military power construction, and resources management. We define the concept of defense IT convergence and describe the framework and processes for applying IT to the defense sector. We analyzes and evaluates various business models designed through defense IT convergence framework and processes.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.5
/
pp.753-759
/
2016
Power automation system to operate power distribution systems can be distinguished by distribution SCADA with remote monitoring and control; and distribution automation system with basic functions such as service restoration to the distribution SCADA; and distribution management system which is operated by various applications in order to enhance distribution system operation performance based on the distribution automation system. In the technological change, a technical boundary of information technology (IT) and operation technology (OT) is being blurred by that new concepts such as interoperability. In addtion, IT/OT convergence has been proposed by the improvement of ICT and power system technology. At the viewpoint, advanced distribution management system (ADMS) to have the new concepts and to increase distribution system operation efficiency through global information and functions from the other systems has been proposed. In order to implement the ADMS, IT and OT have to be employed together on the ADMS; and the concept-based IT/OT convergence concept has been presented. Therefore, this paper introduces ADMS and IT/OT convergence and proposes a design of IT/OT convergence based ADMS system design with configurations and functions.
Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.
In recent innovation trends, one notable feature is the merging and overlapping of technologies: in other words, technological convergence. A key technological convergence is the fusion of biotechnology (BT) and information technology (IT). Major IT advances have led to innovative devices that allow us to advance BT. However, the lack of data on IT-BT convergence is a major impediment: relatively little research has analyzed the inter-disciplinary relationship of different industries. We propose a systematic approach to analyzing the technological convergence of BT and IT. Patent analysis, including citation and co-classification analyses, was adopted as a main method to measure the convergence intensity and coverage, and two portfolio matrices were developed to manage the technological convergence. The contribution of this paper is that it provides practical evidences for IT-BT convergence, based on quantitative data and systematic processes. This has managerial implications for each sector of IT and BT.
The Journal of Economics, Marketing and Management
/
v.5
no.2
/
pp.40-42
/
2017
The purpose of this study was to review and analyze JEMM(The Journal of Economics, Marketing, and Management) of ICMA(The International Convergence Management Association) and all of published articles of 2013 to 2016 and to revise and update the existing publication strategies in order to improve the internationalization and reputation of JEMM. JEMM of ICMA is a new academic journal of Korea Distribution Science Association(KODISA). It is still in its early stage as it is founded in 2013 as an academic journal to increase an recognition through KCI Candidate application under National Research Foundation of Korea(NRF). It endeavors its efforts to be recognized as a reputable international journal. This study was conducted to confirm the current status of JEMM in the current standards and to establish a strategic process to complement the deficiencies and achieve the goals. JEMM of ICMA has three distinguished features of online submission and review system, only English-based papering, reviewing by anonymous refrees. JEMM of ICMA continuously revised and updated its publication standards and practices and adopted technological support systems to enable its journals to remain independent and open access in order to ultimately become one of the most international journals.
The Journal of Korean Institute of Communications and Information Sciences
/
v.42
no.3
/
pp.698-701
/
2017
The district heating system supports currently 1.3 million of houses in South Korea, and it is composed of two main parts: provision and distribution. For the provision part, Korea District Heating Corporation supervises the system with proper devices and experts, whereas for the distribution parts, there is no main supervision system and it depends highly on experts although it is very difficult to find the proper experts. In this paper, we consider IoT based remote management system for district heating distribution to properly supervise heating distribution by experts and/or programs remotely.
We present the motivation, design and implementation of a smart home system in Korea. Our system is open, extensible, integrated, intelligent, and usage-centric. We detail the challenges and key design requirements for the smart home system based on our past experiences, and show how convergence system design is a capable methodology for enabling an integrated and multi-faceted home management system that encompasses energy management, home appliance control, environment management, u-health, and living support functionalities under a single unified design. Using energy management as a specific case study, we demonstrate how convergence system design can encapsulate technology heterogeneity and hardware-software disparity without compromising simple yet powerful user interfaces.
Analyzing the diffusion of a convergence product is a new and challenging research field. It is very difficult to find research dealing with this issue due to the inherent complexity and lack of data. In analyzing the diffusion of a convergence product, we should simultaneously take into account its relationship with related single-function products because of their similarities in terms of technology and functionality. In this study, we empirically analyze the diffusion of the convergence mobile phones in South Korea and find that the convergence products can affect the diffusion of MP3 players and digital cameras positively or negatively. This research may be significant for business strategies in technology management and product development.
An enterprise patch-management system (PMS) typically supplies a single point of failure (SPOF) of centralization structure. However, a Blockchain system offers features of decentralization, transaction integrity, user certification, and a smart chaincode. This study proposes a Hyperledger Fabric Blockchain-based distributed patch-management system and verifies its technological feasibility through prototyping, so that all participating users can be protected from various threats. In particular, by adopting a private chain for patch file set management, it is designed as a Blockchain system that can enhance security, log management, latest status supervision and monitoring functions. In addition, it uses a Hyperledger Fabric that owns a practical Byzantine fault tolerant consensus algorithm, and implements the functions of upload patch file set, download patch file set, and audit patch file history, which are major features of PMS, as a smart contract (chaincode), and verified this operation. The distributed ledger structure of Blockchain-based PMS can be a solution for distributor and client authentication and forgery problems, SPOF problem, and distribution record reliability problem. It not only presents an alternative to dealing with central management server loads and failures, but it also provides a higher level of security and availability.
The government announced that it would ask the contractors not only the supplier but also the contractors to take the same responsibilities if they did not observe industrial accident safety measures from 2019. The semiconductor manufacturing process belongs to the representative disaster industry group in which the facility is directly located inside a closed space called clean room. According to previous studies, the semiconductor industry group used checklists for safety management of their suppliers. This study has developed a model for assessing suppliers by constructing a quantitative checklist item through the risk assessment methodology, laws and regulations. The evaluation model of the supplier set up through this study becomes the safety management standard in the semiconductor industry. Furthermore, it is applied to the partner companies in the operation of ISO 14001, 45001, I would like to apply it as a measure of performance management for CSR (Corporate Social Responsibility).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.