• Title/Summary/Keyword: Conventional railway

Search Result 696, Processing Time 0.03 seconds

Application of linear-array microtremor surveys for rock mass classification in urban tunnel design (도심지 터널 암반분류를 위한 선형배열 상시진동 탄성파 탐사 적용)

  • Cha, Young-Ho;Kang, Jong-Suk;Jo, Churl-Hyun
    • Geophysics and Geophysical Exploration
    • /
    • v.9 no.1
    • /
    • pp.108-113
    • /
    • 2006
  • Urban conditions, such as existing underground facilities and ambient noise due to cultural activity, restrict the general application of conventional geophysical techniques. At a tunnelling site in an urban area along an existing railroad, we used the refraction microtremor (REMI) technique (Louie, 2001) as an alternative way to get geotechnical information. The REMI method uses ambient noise recorded by standard refraction equipment and a linear geophone array to derive a shear-wave velocity profile. In the inversion procedure, the Rayleigh wave dispersion curve is picked from a wavefield transformation, and iteratively modelled to get the S-wave velocity structure. The REMI survey was carried out along the line of the planned railway tunnel. At this site vibrations from trains and cars provided strong seismic sources that allowed REMI to be very effective. The objective of the survey was to evaluate the rock mass rating (RMR), using shear-wave velocity information from REMI. First, the relation between uniaxial compressive strength, which is a component of the RMR, and shear-wave velocity from laboratory tests was studied to learn whether shear-wave velocity and RMR are closely related. Then Suspension PS (SPS) logging was performed in selected boreholes along the profile, in order to draw out the quantitative relation between the shear-wave velocity from SPS logging and the RMR determined from inspection of core from the same boreholes. In these tests, shear-wave velocity showed fairly good correlation with RMR. A good relation between shear-wave velocity from REMI and RMR could be obtained, so it is possible to estimate the RMR of the entire profile for use in design of the underground tunnel.

Evaluation of Installation Length of CWR Considering Rail Tenser's Capacity And Track Maintenance (레일긴장기의 성능을 고려한 효율적인 장대레일 설정방법)

  • Park, Ok-Jeong;Kim, Eung-Rok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.72-79
    • /
    • 2010
  • The significant of continuous welded rail (CWR) management is growing because KORAIL has the plan to convert the whole of conventional railway lines into CWRs through continuous activities since constructed the CWR track with 1.8km in Gyeongbu line in 1966. The CWR recently is needed a efficient management method because it is difficult to manage the CWR by the poor of technic and equipment, limited maintain labor force and shorted the maintain work time of CWR caused by industrialization, greenhouse effect and global warming In this point, The 70ton Tenser's which is using in the rail site has been analysised with no extra tenser's capacity in case of the under low temperature and exceed the length of 1km as a result of reviewing the CWR-related rules and standards, a series of records of safety accidents, operation obstacles, and the situation of broken rails published by KORAIL, existing rail temperature measurements, and CWR researches. Therefore avoid the excessive plan of the first set-up section, choice the proper time in the normal temperature that is possible to weld the rail, turning the difference of rail temperature and Installation temperature down is desirable.

  • PDF

Evaluation of Behavior of Direct Fixation Track and Track Girder Ends on Yeongjong Grand Bridge (영종대교 강직결 궤도 및 종형거더 단부의 거동 분석)

  • Choi, Jung-Youl;Chung, Jee-Seung;Kim, Jun-Hyung;Lee, Kyu-Yong;Lee, Sun-Gil
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.6
    • /
    • pp.45-51
    • /
    • 2016
  • The purpose of this study is to investigate the influence of train-induced end rotation of simple supported track girder on the performance of a direct fixation track system (DFTS) in Yeongjong grand bridge. In this study, the influences of deflection of a DFTS and track girder on dynamic rail-track girder interaction forces for the track girder ends currently employed in airport express lines were assessed by performing field tests using actual vehicles running along the service lines. Therefore, the dynamic displacement of rail and track girder and the fastener stress on the center and ends sections of DFTS were measured for two different trains (AREX and KTX) running in Yeongjong grand bridge. A three-dimensional finite element analysis (FEA) model using the time-history function based on the design wheel load was used to predict the train-induced track and track girder displacement, and the FEA and field test results were compared. The analytical results reproduced the experimental results well within about 3-7% difference in the values. Therefore, the FEA model of DFTS on track girder is considered to provide sufficiently reliable FEA results in the investigation of the behavior of DFTS. Using the analytical and experimental results, the influence of train-induced end rotation of simple supported track girder on the interaction behavior of rail and track girder installed on a simple supported track girder ends, i.e., upward displacement of rail-track girder and the fastener stress, was investigated. It was found that the train-induced end rotation effect of track girder was not significantly affected by the upward displacement of rails and the fastener stresses of track girder ends. Further, the interaction behavior of rail and track girder were similar to or less than that of the general railway bridge deck ends, nevertheless the vertical displacement of track was higher than that of conventional DFTS on the general railway bridge. From the results, the dynamic responses of the DFTS on track girder ends were not significantly affected by the safety and stability of DFTS ends.

Loading tests and strength evaluation of bogie frame for intermodal tram (인터모달 트램 대차프레임의 하중 시험 및 강도 평가)

  • Seo, Sung-il;Mun, Hyung-Suk;Moon, Ji-Ho;Suk, Myung-Eun;Kim, Jeong-guk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.554-561
    • /
    • 2016
  • In this study, loading tests and a strength evaluation of the bogie frame were conducted to verify the structural safety of the bogie system in an intermodal tram, which runs with cars on a road track. The loads were calculated taking into account the features of the road track with many sharp curves and steep gradients, which are different from the track of conventional railway. They were compared with the loads specified in the previous standard specifications. After the comparison, it was confirmed that the loads acting on the bogie system operating on a road track are slightly different from the specified loads. The specified vertical load of the standard specification for all kinds of trains is conservative, but the specified lateral and longitudinal loads are less than the calculated loads. The application of the actual loads was proven to be reasonable in the development of a new railway system. Based on the defined loads, the bogie frame was fabricated on which strain gauges were attached. It was set on the large loading frame so that the stresses could be measured when loads were applied by hydraulic actuators. After measuring the stresses, it was shown that they were below the allowable stress, which verified the structural safety of the bogie frame.

Evaluation of SWMM Snow-melt Module to Secure Bi-Modal Tram Operation (바이모달 트램 운행 안전성 확보를 위한 SWMM 융설 모듈 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.441-448
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the show pack melt/freezing due to unexpected snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snow-fall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for know removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system prediction.

A Study on the Improvement for the Substitute Block System of the Conventional Line (기존선 대용폐색방식 개선에 관한 연구)

  • Song, Nak-Kyoon;Kim, Hae-Gon;Kim, Ho-Soon;Kim, Dae-Sik;Joo, Chang-Hun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.545-555
    • /
    • 2011
  • Presently, The Regular Block System(Automatic, Interlocking block system) is usually used during the operation of block section. However, In case that the regular block system fails because of the failure of the fixed signals and block equipment or in case of the unexpected emergency which should drive on the single line due to the accidents in the double line section or the repair work of the single line, the Substitute Block System to use the driving permission license(mapping ticket and paper) is used. In case of the operation of the opposite line and the temporary one line, the safety gets worse and the SBS may cause the fatal accidents such as a head-on & a rear-end collision. Also, the unmanned railroad stations has recently increased owing to the effective operation of the stations, for it is difficult to execute the SBS in their absence. As a result, the increase of the operation time made the train delayed. Being on the rise of these problems, in this study, we analyzed the problems and difficulties of the SBS on one line which is lacking stability and safety and on the sections combined between maned and unmaned railroad stations. And we proposed the suitable method in KORAIL referring to the examples of European & Japan railways lately. According to the passing of the high tech time, If the new SBS equipped with stability and safety is executed, it will contribute to the effective operation of trains and the satisfaction of KORAIL customers in the future.

  • PDF

Prediction of the Elastic Modulus of Improved Soil Using the Flat TDR System (판형 TDR 시스템을 이용한 개량지반의 탄성계수 예측)

  • Song, Minwoo;Kim, Wanmin;Kim, Daehyeon;Choi, Chanyong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.3
    • /
    • pp.77-85
    • /
    • 2016
  • This study was conducted to solve the problem such as damage of completed compaction ground using the conventional compaction control method. In this study, a TDR system equipped with a flat type probe has been developed. Also, the Piezoelectric stack, which is an instrument for measuring the elastic wave on the ground, has been added to the developed flat type probe. In this study, the strength variation of reinforced soil with time was determined by using the TDR system. The value of compression and shear modulus increased from 198.65MPa to 541.80MPa and from 125.55MPa to 302.02MPa with time, respectively. Based on the test results, it has been confirmed that the developed TDR system can be used as reinforced effect analysis of soil and compaction control.

A study on increasing KTX operation efficiency of long-distant transportation methods in Korea (고속철도 운영효율성 분석)

  • Lee, Yon-Jai;Oh, Tae-Wan
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.1 no.2
    • /
    • pp.225-253
    • /
    • 2006
  • Last 1970's Korea opened the Kyoung-bu highways from Seoul to Pusan, and Korea government had change the transportation policy to focusing on the road and motors. but 1990's Korea had been the heavily traffic jam in long distant transportation system and logistics. That's why Korea government studied on feasibility survey of High-speed train. As the KTX opens, traffic networks covering large areas In Kyeongbu-line (Seoul- Daejeon- Busan) are expected to raise synergy effects in economics as well as in korean culture respects. Having been playing an important transportation role in Korea for the last 106 years. With opening of the high speed railway, KORAIL in inevitable to make a drastic reform. To achieve this purpose, it is necessary that KORAIL has to be small and effective streamlined organization. In should increase traffic capacity by improving infra facilities. It need to also expand its internal functions by connecting the KTX with the conventional railroad system.

  • PDF

Evaluation of the Effect of Rotating Tool for Friction Stir Welding Al6005-T6 (회전공구 회전속도에 따른 알루미늄 합금 (Al6005-T6)의 마찰교반접합 특성 연구)

  • Choi, Dooho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.124-129
    • /
    • 2017
  • In this study, we report characteristics of friction stir welding (FSW) technique applied to Al-6005-T6 extruded sheets, which is a common material for railway car bodies. With the welding speed fixed at 300 mm/min, the revolution per minute (RPM) of the rotating tool was varied from 600 to 1800 RPM, with the aim at evaluating the resultant microstructure and mechanical behaviors. Comparison is also made with the conventional Metal Inert Gas (MIG) welding technique. Unlike MIG, no micro-voids were observed for FSW specimens. Hardness measurement revealed that the increased heat input by increasing RPM results in widened heat affected zone (HAZ) and decreased hardness for HAZ due to grain coarsening. Hardness results for the nugget do no show difference. During tensile tests, specimens fractured at HAZ, and increasing rpm led to decrease of the yield stress and tensile stress for the selected RPM range, which is considered to be due to the grain coarsening for HAZ.

A Survey on Safety Analysis Techniques for Safety-Critical Systems (안전 필수 시스템을 위한 안전성 분석 기법)

  • Kim, Eui-Sub;Yoon, Sanghyun;Yoo, Junbeom
    • Journal of Convergence Society for SMB
    • /
    • v.2 no.1
    • /
    • pp.11-18
    • /
    • 2012
  • As scale of software has been expanded and complicated, it is difficult to detect hazards which induce functional failure of software. Functional failure of safety-critical system (nuclear power plant, air traffic control systems, railway operating system) could result in a disaster (personal injury, environmental pollution). Therefore, it is necessary to conduct a safety analysis for preventing functional failure and increasing safety of the software. However, there are some reasons (time and effort problem, low knowledge of various safety analysis techniques, selecting conventional technique in company, organization) which disturb selecting an apposite one. This paper presents some traditional safety analysis techniques, recently presented techniques and combined models. We expect that it helps stakeholders to choice adequate one for target system.

  • PDF