Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.
This study is planned to investigate the attitude toward the safety and health management of contractor company. Under the contract based production system, all of activities including safety and health management in the contractor company are depended upon the contract. How to make contract influence the worker's health of contractor company. Worker's health of contractor company can be protected by efforts of company of contract-out and contractor company, especially their safety managers. The modelling of the effective safety and health management system for contractor company should consider the need of safety manager of each company and employer of contractor company. Data is collected from safety managers of 3 contract out compaines as electronic and electrical manufacturing industry and 55 safety manager, 57 employers of their contractor compaines using self administered survey with structured questionnaire. The most of all respondents want to support from the contract out compaines. The most important items supported from contract out company is the information based on the safety information network between each company. Safety manager and employer of contactor company also itemized safety education and training in the supporting system from contract out company. These results can be generalized to survey on the other industries.
International conference on construction engineering and project management
/
2005.10a
/
pp.469-473
/
2005
Contract design plays a key role in the life cycle of BOT project. All project management activities and operation processes are arranged in consistence with the document of BOT contract which the public sector ensures that the respective roles and responsibilities set out in the contract are fully understood and fulfilled to the contracted performance criteria. With limited theories to deal with some fundamental issues of BOT contract design, we try to collect data from case studies and formulate several practical principles. The conclusions presented in this paper are analyzed from two cases, one is based on an early case in the United Kingdom, and the other based on the Taiwan High Speed Railway case. The purpose of this paper is not about covering all legal issues about BOT contract design, but rather, our work provides common considerations applicable to the contract parties of a broad range of BOT contracts. The results in this paper shall propose some fundamental principles of the BOT contract design.
This article attempts to describe and analyze the rules on the service provider's duty to provide his service in conformity with the contract under the Draft Common Frame of Reference (here-in-after DCFR), which are applied to construction, storage, design and factual information contracts. It categorizes such rules in accordance with the requirements of conformity with the contract, the time when the service provided must be in conformity with the contract, and the exemptions of the service provider's duty. On the basis of such categorization, it examines the rules on the service provider's duty in each type of service contract under the DCFR. By doing so, it seeks to figure out how the members of EU compromised on the various issues of the service provider's duty under the DCFR which is regarded as the first uniformed legislation in the area of the service contract. This may provide some guidance to the legislators of domestic law for their amendment or interpretation of their laws. In addition to them, this article also seeks to point out problems in terms of their interpretations and gaps in their rules to cover various aspects of non-conformity and put forward some solutions for such problems and gaps.
A contract is made when both parties have reached agreement, or they are deemed to have. After contract the law recognizes rights and obligations arising from the agreement. In order to discover whether agreement was reached between these two parties, we have to analyse the process of negotiation. Recently The People's Republic of China legislated a New Contract Law, which has come into effect since 1st of October 1999. This Law adapts the rules of United Nations(Vienna) Convention on Contracts for the International Sale of Goods and the Unidroit Principles for International Commercial Contracts. And this law is now widely enforced to commercial transactions between individuals, enterprises or other economic organizations of the People's Republic of China and foreign enterprises. Therefore, the foreigner who wish to make a sales contract with Chinese should understand the rules of New Contract Law of China. According to this New Law only a contract which contain offer and acceptance is valid and binding, and it is also pointed out that terms of contact must be certain. Though an oral contract is usually equivalent to a written one, in a case of commercial transactions written contract with signature is desirable. The purpose of this paper is to analyze the new rules of this Law and the new features of their application to commercial transactions in China.
Korean Journal of Construction Engineering and Management
/
v.6
no.5
s.27
/
pp.177-185
/
2005
Construction uncertainties are frequently exposed to the claims. In most cases, an interpretation of the claims is based on the construction contract. Therefore, the key points of contract negotiation are how to fairly distribute the contract risks to the client and contractor. For these, a FIDIC that is considered as an international standard contract form would be a good reference to decide reasonable contract risk distribution. In order to find out any unreasonable and unfair contract clauses at the general conditions of contract applying generally to public construction project in Korea, this study surveys, analyses and evaluates the general conditions of contract based on a FIDIC, and then proposes a risk mitigation methodology to response those clauses' risk factors reasonably.
Korea Fair Trade Commission (KFTC), one of the Government agencies, has been preparing a standard model form of Exclusive Contract for Entertainment Management (hereinafter referred to as "Exclusive Contract") to eliminate some types of unfairness that placed entertainers at disadvantage such as forced PR activities or activities without payment, excessive privacy infringement, and exemption of payment after the termination of the exclusive contract. The said Exclusive Contract was drafted by The Korean Commercial Arbitration Board (the "KCAB") in association with the Korean Entertainment Law Society (the "KELS") and KCAB has persistently persuaded Corea Entertainment Management Association (the "CEMA"; mainly actors management) and Korea Entertainment Producers' Association (the "KEPA"; mainly singers management) to adopt the above-mentioned Exclusive Contract, respectively, and especially arbitration clause instead of litigation. After KCAB's tens of meetings and persuasion, they finally decided to accept KCAB's offer and they have submitted the Exclusive Contract drafted by KCAB and KELS to KFTC on April 17, 2009. The arbitration clause drafted by KCAB was already accepted by unfair contract examination division and unfair contract advisory committee and the final standard model contract was supposed to be publicly announced on June 30, 2009 after final examination of unfair contract standing committee, but the announcement has been delayed owing to severe controversies between the concerned parties, such as CEMA, KAU (Korea Artists' Union), KEPA and KSA (Korea Singers' Association) related to delicate issues like contract period and ownership of intellectual properties, etc. But it is expected the announcement will be made very soon by which the contract will include the originally drafted arbitration clause by KCAB. Therefore, it is very timely to examine the various legal issues which can be arisen out of disputes, and arbitration appropriateness with Exclusive Contract of Entertainment Management on this paper.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.662-665
/
2007
There are many contract patterns in the international construction market, such as CM, EPC, PM and so on. To be geared to international standards, the Construction Ministry of P.R.C improved the laws and regulations related to the construction contract. Therefore, some international contract patterns are available in China now, but the application of the international contract patterns is still in the early stage, At the same time South Korea has made a great achievement to use the international contract patterns in the practical projects. This pater carried out a study to identify differences of construction contract patterns between these Chinese construction market and Korean construction market, and to learn from each other to gain more experiences.
Purpose: The revenue sharing contract has been used in various industries and it is expected to coordinate the individual companies' operations in a way to improve the whole supply chain performance. This study evaluates the performance of the revenue sharing contract to find out whether this contract achieves its original goal, the supply chain coordination. Research design, data, and methodology: The profit optimization models are developed to represent two stage supply chain system with a supplier and a buyer. By using the numerical examples of the proposed mathematical models, this study examines whether this supply chain contract coordinates the supply chain system. Results: The numerical examples show that the revenue sharing contract does not make the same supply chain profit as the centralized system does. With the proper combination of the wholesale price discount rate and revenue share ratio, both manufacturer and retailer can obtain increased profits from the revenue sharing contract. Conclusions: The outcomes of the numerical analysis imply that the revenue sharing certainly improves the supply chain performance but it does not fully coordinate the supply chain system. By controlling the wholesale price and revenue share ratio, every supply chain member can be beneficiaries of this supply chain contract.
This study deals with construction contract bid-rigging by Japanese contractors who monopolized the construction market of the Korean Peninsula during the Japanese colonial rule, and investigates the abuses of the contract bid-rigging. First of all, construction contract bid-rigging in Korea was triggered by Japanese construction contractors and contract brokers, who had savored the benefits of bidrigging in Japan and had repeated the bid-rigging in Korea since 1903. Second, the agency played a significant role to mediate construction contractors, and existed throughout the Japanese colonial rule on the Korean Peninsula with changing their names. Most of them were engaged in major contract bid-rigging scandals. Among them was Construction Association of Korea, which existed for over 13 years. The agencies had took part in governmental services since the mid-1930s when Japan exploited Korean people during wartime, and focused on sweating human resources for the constructions. Third, one of the biggest construction bid-rigging scandals during the Japanese colonial rule was "the 1st and 2nd scandal on Daegu construction contract bid-rigging." Indeed, the second scandal paved the way for the serial scandals: "Kyeongseong construction contract bid-rigging scandal", "Busan construction contract bid-rigging scandal", and other cases throughout the nation. Fourth, along with the contract bid-rigging cases related to the Japanese Government-General of Korea and local authorities, bid-riggings firmly took rooted in local governments' farmland reclamation projects in the 1920s and the poor relief services in the 1930s. The "bid-rigging charges" forced contractors to compensate their losses with exploiting material costs and labor costs, generating serious problems. The construction contract bid-rigging enabled Japan to monopolize the construction industry and to sweat farmers on the Korean Peninsula. Against this backdrop, contract bid-rigging by Japanese construction contractors during the its colonization made Korean contractors ruled out, and helped Japanese monopolize the industry. A large amount of bid-rigging charges drove Japanese contractors to do fraudulent work with cheap materials and to exploit Korean labor force.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.