• Title/Summary/Keyword: Contract for work

Search Result 312, Processing Time 0.03 seconds

A Study on Effective Trade Claims Solutions through Commercial Arbitration System

  • Choi, Rack-In
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.1
    • /
    • pp.99-106
    • /
    • 2017
  • In this paper, the first to identify in detail the direct and indirect causes of trade claims and to provide a way to prevent the causes and measures specific claims. Trade claims is not the best way to prevent in advance, measures to prevent future trade claims is as follows. First, it should be the credit investigation of the counterparts. Second, the contract must determine the rights and obligations of each other through sufficient consultation with contract and faithfully perform its contractual obligations. Third, the explicit trade arbitration clause of arbitration in the contract, and shall be a sufficient review of the procedure such as import and export, international business practices, norms and partners of economic policy, foreign exchange regulations, the trade system transactions. Finally, for it is to be treated as a one-stop strengthening the organization and function, and the Ministry of Commerce and Trade Association, and KOTRA and Trade Insurance Corporation strategic support systems, such as done by covering the work on trade claims prevention and resolution in the Korean Commercial Arbitration Board.

Basic Research on Nuclear Power Plant Construction Claims and Dispute Management Processes Development

  • Son, HyeJin;Lee, SangHyun;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.710-711
    • /
    • 2015
  • A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.

  • PDF

System Dynamics Modeling of Korean Lease Contract Chonsei

  • Myung-Gi Moon;Moonseo Park;Hyun-Soo Lee;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.151-157
    • /
    • 2013
  • Since the sub-prime mortgage crisis from the US in 2008, the Korean housing market has plummeted. However, the deposit prices of the Korean local lease contract, Chonsei, had been increasing. This increase of Chonsei prices can be a threat to low-income people, most of whom prefer to live in houses with a Chonsei contract. In the housing and Chonsei market, there are many stakeholders with their own interest, hence, simple thoughts about housing and Chonsei market, such as more house supply, will decrease house price, would not work in a real complex housing market. In this research, we suggests system dynamics conceptual model which consists of causal-loop-diagrams for the Chonsei market as well as the housing market. In conclusion, the Chonsei price has its own homeostasis characteristics and different price behavior with housing price in the short and long term period. We found that unless government does not have a structural causation mind in implementing policies in the real estate market, the government may not attain their intended effectiveness on both markets.

  • PDF

A Proposal of Enhanced Personal Information Security management Framework of Consigning of Personal Information (개인정보보호 강화를 위한 위탁 업무 보안관리 프레임웍 제안)

  • Ko, Youngdai-Dai;Lee, Sang-Jin
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.25 no.2
    • /
    • pp.383-393
    • /
    • 2015
  • Recently, the number of companies consigning their personal information management work has been increasing; they consign the work for various reasons and purposes, for example, in order to reduce costs related to personal information managers, improve efficiency through professional performance and to improve service quality. As such, since the cases where an consigning agency - not the personal information manager - handles personal information are increasing due to the increase of consigning of the personal information management work, we need to concerned with and pay attention to how much such agency makes efforts for personal information protection. In this regard, this study suggests a plan for efficient management of the agency during the course of consigning work as well as a list of requirements for personal information protection to be considered in each phase of the following; establishment of personal information protection framework for all consigning work processes, selection of consigning agency, execution of consigning contract, operation and management of consigning work, and termination of contract.

Relationship between Work Unstability and Personal Medical Expenditure Ratio (고용불안정과 가구소득 대비 개인 의료비 지출 비중의 연관성)

  • Jung, Woo-young;Han, Yun-su;Kim, Chan-ho;Hwang, Yun-tae;Lee, Yejin;Noh, Young-Min;Noh, Jin-Won
    • Korea Journal of Hospital Management
    • /
    • v.24 no.2
    • /
    • pp.1-11
    • /
    • 2019
  • Purpose: The purpose of this study is to identify relationship between work unstability and personal medical expenditure ratio focusing on wage workers' contract period. Method: This study analyzed 2015 yearly data beta version of Korea Health Panel, co-managed by Korea Institute for Health and Social Affairs and National Insurance Corporation for data analysis. When executing linear regression, Household income was applied with equivalized income, and the proportion of personal medical expenditure was naturally logged to perform linear regression and the demographic and socioeconomic factors were taken into account. The demographic and socio-economic factors were also considered. Findings: As a result of reviewing the used factors, it was found that the more unstable work status, the higher personal medical expenditure ratio. This result corresponds to 'The Theory of Fundamental Causes' by Link & Phelan. Conclusion : It indicates that policy efforts should be made to improve the working environment and health level of socially unstable workers.

Contract Farming of Raw Cabbage for Making Kimchi, Led by Local Traders of Agricultural Produce, and Changes Brought to the Agriculture of the Contract Area (산지유통인이 주도하는 김치제조용 원료배추의 계약생산과 계약지역의 농업 변화)

  • Seoyoen Kim;Youngjin Jang
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.27 no.1
    • /
    • pp.1-17
    • /
    • 2024
  • The purpose of this study is to identify the role of each party in relation to the contract farming of cabbage which is taking place under the contract between the local trader of agricultural produce that supplies raw cabbage to company "D," a manufacturer of kimchi, and the cabbage farm where the cabbage is grown, and to describe the changes brought by the contract farming to the agriculture of the contract area. As a result of the study, it was discovered that, while the farming of cabbage in the contract area used to be led by farmers, it is now increasingly being controlled by the local traders of agricultural produce. First, as the key player in the decision-making related to the cabbage farming in the main cabbage producing areas, local traders of agricultural produce are replacing the role of farmers by supervising the entire production process and controlling the overall cabbage farming in the contract area. Second, in the main cabbage producing areas, local traders of agricultural produce are becoming a key farming entity by carrying out functions that are comparable to those of farmers and playing a major role in the second half of the agricultural work at the farms in the contract area. This can be considered as the result of the balance between the demands of the local traders of agricultural produce who need to secure contract volume and manage the quality of their produce and the demands of the farmers in key cabbage producing areas who are facing difficulties due to the increase in the number of elderly farmers and a shortage of manpower.

A Study on the Improvement of Total Cost Change Control in Private Investment Projects (민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로)

  • Kim Se-Jong;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.119-126
    • /
    • 2001
  • This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.

  • PDF

The Legal nature of a contract for supply of a special purpose aircraft -The legitimacy of contract cancellation on the grounds that the performance specification is not satisfied in the purchase specification- (특수 항공기 공급계약의 법적 성질 - 구매규격서상 성능요건 미달을 이유로 한 계약해제의 정당성 -)

  • Kwon, Chang-Young
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.31 no.2
    • /
    • pp.37-72
    • /
    • 2016
  • In the aerospace field, besides special purpose airplanes, contracts for supply of various types of products such as prototypes, unmanned aerial vehicles and space launch vehicles are increasing. In the case of the contractor, it was planned to spend a large amount of money to supply the production, but if the purchase specification that presents the quality and performance standard of the product is poor or lacks the capacity to judge the performance, consuming enormous amounts of time and money. Even if the undertaker does not have the ability to supply the products with the required performance and quality to achieve the purpose of the contract, he/she must pay the cost of burial due to the incompleteness of the work and the compensation for the cancellation of the contract. In this case, the defendant ordered the plaintiff to supply the aircraft by the Happy Box method, which is capable of ILS Offset flight as specified in the Purchase Specification, but the plaintiff attempted to supply the aircraft by the RNAV method. Although the ILS ground signal can be inspected by the RNAV method, the aircraft manufactured in the manner claimed by the plaintiff does not have the ILS Offset flight function required by the purchase specification, so the defendant can not achieve the purpose required by the purchase specification. It was a question of whether a defendant's cancellation of contract was legitimate. The aircraft, which is the object of this contract, is a subordinate substitute, so the case contract is of undertaking. Therefore, in order to complete the work in this contract, the major structural parts of the aircraft must be manufactured as agreed and have the performance generally required in the social sense. However, the aircraft delivered by the plaintiff has serious defects because the defendant can not achieve the purpose required by the purchase specification due to the lack of the ILS Offset flight function required by the purchase specification. This deficiency is impossible for the plaintiff to repair, so the defendant 's cancellation of the contract is legitimate.

Primitive Forms of General Contractor Business in the Railroad Construction during the Daehan Empire (철도공사를 통해 본 대한제국기 청부업의 초기적 형태)

  • Lee, Soo-Neon;Jeon, Bong-Hee
    • Journal of architectural history
    • /
    • v.29 no.5
    • /
    • pp.17-28
    • /
    • 2020
  • The general contractor business in South Korea settled in the railway construction during the Daehan Empire, but depending on the construction intention and circumstances of the railroad, relationship among employer-contractor-subcontractor and their roles under the system of the construction process had changed. At the time of laying the Gyeongin and Gyeongbu-rail, the Empire, which had no capital and technology, passed all the power and responsibility of the rail laying to the contractor, who was involved in most of the process. After this, the empire tried to lay Gyeongui-railroad without the help of other countries. Japan prepared for the Russo-Japanese War and decided to construct the railway rapidly, and completed the railway in parallel with direct management work and contract work. From that time on, the general contractor would only do the work. During the construction of railroad in Daehan empire, the general contract business system was established. The ambiguous process was sorted out and divided. At this time, subjects in charge of design and construction has been divided. The internal organization of the project owner and the contractor were organaized and specialized.

Employment Factors Associated With Long Working Hours in France

  • Isabelle Niedhammer;Elodie Pineau;Sandrine Bertrais
    • Safety and Health at Work
    • /
    • v.14 no.4
    • /
    • pp.483-487
    • /
    • 2023
  • The objectives of the study were to explore the employment factors associated with long working hours, known as a risk factor for various health outcomes. The study relied on the national representative data of the 2013 French working conditions survey and a study sample of 23,378 full-time employees. Long working hours were defined by the threshold of 48 hours a week following the European Working Time Directive. The prevalence of long working hours was higher among men (13.5%) than among women (8.5%). Employees of the private sector, with permanent work contract, in small companies, and men in the services had a higher prevalence of exposure. This prevalence increased with educational and occupational levels. Our findings may help decision-makers to define preventive strategies. More research is needed to improve our knowledge of the employment factors associated with long working hours, as there may be strong differences between countries.