물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구 (A Study on the Escalation Method for Contract Adjustment Public Construction Project)

  • 배경태;최동수;황치원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

군사시설 건설사업의 설계변경 요인분석 및 개선방향 (Causes of Change Orders in the Military Facility Construction Projects and Suggestions for Improvement)

  • 이경한;최종수
    • 한국건축시공학회지
    • /
    • 제13권3호
    • /
    • pp.263-271
    • /
    • 2013
  • Change orders have been widespread in both the private and public construction sectors. In particular, in the case of G2B (Government to Business) contracts, adjustment of contract price and/or schedule extension is a frequent occurrence due to change orders. To uncover the causes of change orders and suggest an appropriate strategy, this study analyzed 296 cases of change orders in military facility construction projects from 2008 to 2010. The analysis revealed that the major causes of change orders are users' additional requirements (28.38%), a change of finishing materials (23.99%), and change of footing type (17.57%), in that order. Building on the results of this analysis, the authors suggest plans for practical improvements. Specific recommendations include 1) reflect user requirements at the early stage, 2) minimize the use of additional budget due to change orders, and 3) reduce the process and time for contract amendment, among others. The results of this study may provide significant implications to those involved in military construction projects, particularly project owners (i.e., the Ministry of Defense) and contractors.

BTDF를 이용한 직거래 전력시장에서의 혼잡처리에 관한 연구 (A study of congestion management in bilateral electricity market using BTDF)

  • 이승진;이기송;박종배;신중린;이명환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.609-611
    • /
    • 2003
  • This paper presents a method for a congestion management in the competitive market which is modeled as the multiple bilateral transaction. Traditionary, the congestion management for the multiple bilateral transaction is accomplished through the process of adjustment bids. It is necessary in for the market entity to submit their price information when the congestion is occured. Finally, the ISOs can be blown about the approximated contract price of participants from the price of adjustment bids. However, the entities can submit only the amount of their contract to ISOs and ISOs are required the method to manage the congestion only by the contracted quantity. Therefore, this paper presents a method for congestion management by curtailing the only contracted quantity of market entities. To evaluated the above problem, we suggest Bilateral Transaction Distribution Factors(BTDFs), which is the sensitivity of line flow with curtailment of transactions. Using this factor, we studied about congestion management when the objective function is to minimize total curtailment of transaction.

  • PDF

건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구 (A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price)

  • 성주용;김동진;이민재
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.3-11
    • /
    • 2019
  • 시설공사는 도로, 철도 등 기간시설과 주거, 사무 공간 등의 다양한 인프라를 구축하는 행위로써 주문제작방식으로 시행되는 산업의 특성 상 대부분 장기간이 소요된다. 장기간에 걸쳐 공사가 진행되는 동안 공사를 구성하는 원재료 가격이 등락이 발생한다. 따라서 공사비 등락 또한 필연적으로 발생하게 된다. 공사비의 등락은 곧 시공사의 이익 및 정부의 예산지출의 효율성에 민감하게 맞물린다. 따라서 요구되는 공사품질 확보와 효율적인 예산지출 위해서는 합리적으로 공사비를 조정하여 적정한 수준의 시공비가 유지되도록 해야 한다. 이러한 문제의 해결을 위한 완충제도가 물가변동으로 인한 계약금액 조정제도(Escalation/De-Escalation)이다. 본 연구에서는 효율적인 계약금액 조정방법의 제안을 위하여 품목조정방식을 기반으로 지수조정방법을 접목한 방법을 제안하였다. 또한, 물가변동 조정과 관련된 국가계약법령 및 계약예규에 반영되지 못한 사항들을 조사하여 법적으로 성문화하도록 제안하였다.

공급능력제약이 존재하는 분권화된 공급체인의 조정메커니즘 (Coordination Mechanisms for Decentralized Supply Chain in a Capacitated Distribution Network)

  • 박정훈;최동현;김성태
    • 한국시스템다이내믹스연구
    • /
    • 제13권1호
    • /
    • pp.81-112
    • /
    • 2012
  • This study investigate the impact of supply chain contracts on supply chain performance. This study employed Price adjustment contract(PAC) and Quantity adjustment contract(QAC) as two main types of a vertical coordination mechanism. We simulate different types of coordination mechanisms with various degrees of demand uncertainties and several capacity tightness scenarios. This study shows that PAC and QAC significantly enhance the supply chain profits and fill rates suggesting that supply chain performance can be improved by implementing a proper coordination mechanism depends on the level of a capacity tightness and demand uncertainty.

  • PDF

Classify and Quantify Cumulative Impact of Change Orders On Productivity Using ANN Models

  • 이민재
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.69-77
    • /
    • 2005
  • Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative Impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results skew that ANN models give significantly improved performance compared to traditional statistical models.

Conflicting Factors in Korean Construction Industry

  • Acharya Nirmal K.;Lee, Young-Dai;Kim, Jung-Ki
    • 한국건설관리학회논문집
    • /
    • 제7권2호
    • /
    • pp.171-180
    • /
    • 2006
  • Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results show that ANN models give significantly improved performance compared to traditional statistical models.

건설공사 지불규정제도 도입에 따른 공사비조정방안 (Adjustment of Contract Price according to Introduction of Pay Adjustment)

  • 이상범
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.175-180
    • /
    • 2010
  • 건설 산업은 지속적인 품질관리 노력에도 불구하고 건설공사의 품질은 크게 향상되지 못하고 있다. 이러한 이유는 사용자의 요구품질수준은 높아지고 있으나 시방서의 품질수준은 환경변화를 수용하지 못하고 있으며, 품질향상노력 역시 시방기준 충족에 만족하고 있다. 이에 반해 해외 선진국들은 건설공사에 지불규정제도를 도입하여 성능기준에 따라 대가를 지급함으로써 유지보수에 대한 추가 비용을 절감하고 시공기술 향상에 큰 효과를 얻고 있다. 이에 따라 우리나라도 건설 산업의 품질향상과 건설기술개발을 유도할 수 있는 지불규정제도의 도입이 필요하지만 성능품질검사에 따른 대가 조정의 법적 논리가 부족한 실정이다. 따라서 본 논문은 국내 법규체계에 맞는 지불규정제도를 도입하기 위해서 성능품질검사 결과에 따른 공사비를 조정할 수 있는 법적 논리방안을 개발하였다.

실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석 (Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju)

  • 홍정호;이동욱
    • 대한토목학회논문집
    • /
    • 제34권2호
    • /
    • pp.667-676
    • /
    • 2014
  • 본 연구는 제주특별자치도 내 실적공사비가 적용된 도로현장을 중심으로 물가변동에 따른 실적공사비 등락률 산정의 문제점을 분석하기 위하여 실시되었다. 본 연구를 위하여 제주특별자치도 내 9개 도로공사 현장을 중심으로 실적공사비방식, 표준품셈방식, 건설공사비지수방식에 따른 등락률을 비교 분석하였다. 분석결과 9개 현장 중 약 56%인 5개 현장에서 실적공사비의 지수조정률이 표준품셈과 건설공사비지수의 지수조정률에 비해 낮게 산정되었다. 이는 실적공사비가 적용됨에 따라 물가변동으로 인한 계약금액 조정 성립요건이 지연되고 있다는 것을 알 수 있으며, 이에 따라 공사 준공 전 물가변동으로 인한 계약금액 조정횟수의 감소와 함께 물가변동금액 역시 차이를 보일 수 있음을 의미한다. 또한, 건설공사비지수 사례분석 결과, 도로부문에 대한 지수를 적용하여 지수조정률을 산출하였으나 지수조정률이 2.0%~9.4%까지 산정되어 이는 공사금액 및 물가변동 적용시기에 따라 상당한 영향을 미치는 문제점이 나타났다.

물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안 (Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation)

  • 정기창;김영애;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.540-545
    • /
    • 2008
  • 본 연구의 목적은 물가변동에 따른 실적공사비 등락률 산출 과정의 문제점과 개선방안을 제시하고자 수행되었다. 이 연구를 수행하기 위해서, 실적공사비 내역이 포함된 현장을 표본으로 실적공사비적용 방식 및 품셈적용 방식으로 물 가변동률을 산출하여 문제점을 분석하고 물가변동금액 산출에 대한 개선방안을 제안하였다. 이에 따른 연구의 결과는 다음과 같다. 1) 전체공사 내역 중 실적공사비 단가로 작성된 내역에 대해선 품셈 방식을 준용하여 물가변동 부분을 산출하는 것이 더 적정한 것으로 나타났다. 2) 산출방식에 혼선이 없도록 관련 법령 및 규정에서의 실적공사비 등락률 산출부분을 품셈으로 풀어 산정하도록 일부개정이 이루어져야 하는 것으로 나타났다.

  • PDF