• Title/Summary/Keyword: Contract Price

Search Result 299, Processing Time 0.024 seconds

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

A Study on Court Auction System using Ethereum-based Ether (이더리움 기반의 이더를 사용한 법원 경매 시스템에 관한 연구)

  • Kim, Hyo-Jong;Han, Kun-Hee;Shin, Seung-Soo
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.2
    • /
    • pp.31-40
    • /
    • 2021
  • Blockchain technology is also actively studied in the real estate transaction field, and real estate transactions have various ways. In this paper, we propose a model that simplifies the authentication procedure of auction systems using Ethereum's Ether to solve the problem of offline court auctions. The proposed model is written in Ethereum's Solidity language, the court registers the sale date and the sale date with the DApp browser, and the bidder accesses the address of the individual's wallet created through Metamask's private key. The bidder then selects the desired sale and enters the bid price amount to participate in the auction. The bidder's record of the highest bid price for the sale he wants is written on the Ethereum test network as a smart contract. and creates a block. Finally, smart contracts written on the network are distributed by the court auction manager to all nodes in the blockchain network, and each node in the blockchain network can be viewed and contract verified. As a result of analyzing the smart contracts of the proposed model and the performance of the system, there are fees incurred due to the creation and use of Ether on platforms using Ethereum, and participation. Ether's changes in value affect the price of the sale, resulting in inconsistent fees in smart contracts each time. However, in future work, we issue our own tokens to solve the market volatility problem and commission problem with the value change of Ether, and refine complex court auction systems.

Establishing a Crop System of Organic Farming for Maximizing Agricultural Income (유기농업의 소득 극대화를 위한 작부체계 수립 전략)

  • Kim, Ho;Kim, Sung-Tae
    • Korean Journal of Organic Agriculture
    • /
    • v.20 no.2
    • /
    • pp.143-159
    • /
    • 2012
  • Agricultural income is calculated with producer price, output and management cost. This study compared organic farming with conventional one for agricultural income, producer price and output by items. And then it proposed the method of item selection and crop system from a diversification point of view. The coefficient of variation to producer prices in organic farming was 4.7%, and conventional one was 30.3% because organic products have been produced in a system of contract farming with consumers' cooperative. This result means the price of organic products is stabler than that of conventional price. And agricultural income of organic farming has been generally known more than that of conventional one. However, agricultural gross income of conventional farming was more than that of organic one by 20.3% in 2010. It was caused by output reduction of a few items(fer example; onion, large green onion, potato and young pumpkin) due to freak weather conditions and constant producer price for several years in organic farming. In order to increase agricultural income, appropriate crop selection and system should be introduced to organic farming. A principal crop is the rice plant and 2 subordinate crops are dry crops at bare field and greenhouse respectively. Thus 5 crop systems that agricultural gross income are relatively increased larger among 15 crop systems estimated are rice+ginger+cucumber, rice+ginger+tomato, rice+large green onion+cucumber, rice+sweet potato+cucumber and rice+onion+ cucumber.

The Hedging Effectiveness of Shrimp Futures Contract and Futures Contract Design (새우 선물계약의 헤징유효성과 선물계약 설계)

  • Kang, Seok-Kyu
    • The Journal of Fisheries Business Administration
    • /
    • v.41 no.1
    • /
    • pp.73-91
    • /
    • 2010
  • The objective of this study is to examine the hedging effectiveness of shrimp futures market. Hedging effectiveness is measured by OLS model based on rolling windows. Analysis data are obtained from Kansai Commodities Exchange in Osaka and are weekly data of frozen shrimp futures and cash prices in the time period from July 9, 2003, to May 9, 2007. The empirical results are summarized as follows:First, the correlation coefficients between the nearby futures price changes and the cash(16/20) price changes are very low and have range from 0.141 to 0.208 values. Second, the minimum variance hedge ratios($\hat{\beta}$) are all statistically different from 0 at the 5% level and range from 0.0477 to 0.5039 values excluding Indian shrimps(26/30). Ex post hedging effectiveness, as measured by the coefficient of determination, $R^2$, is relatively very low and range from a low of 0.4% for west-south Indian shrimps(26/30) to a high 4.3% for Vietnamese shrimps(16/20). Third, ex ante hedging effectiveness, as measured by out-of-sample hedging period, is also very low and range from a low of -4.4% for west-south Indian shrimps(21/25) to a high of 3.4% for Vietnamese shrimps(16/20). This indicates that the shrimp futures market doesn't behave as risk management instrument of shrimp spot.

Conflicting Factors in Korean Construction Industry

  • Acharya Nirmal K.;Lee, Young-Dai;Kim, Jung-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.171-180
    • /
    • 2006
  • Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results show that ANN models give significantly improved performance compared to traditional statistical models.

A Study on the Chinese Arbitral Award relating to a Documentary Credit - with a special reference to Inco. v. China XX awarded by CIETAC, Shanghai Commission - (중국 중재판정부의 신용장 관련 중재 판정에 대한 연구 - Inco. v. China XX (가칭) 사건의 중국국제경제무역중재위원회, 상해위원회 중재판정을 중심으로-)

  • Hahn Jae-Phil
    • Journal of Arbitration Studies
    • /
    • v.15 no.2
    • /
    • pp.93-123
    • /
    • 2005
  • As the international commercial transaction has drastically grown up with the mainland China, commercial disputes that are required to settle through ADR have tremendously increased during the last decade. Since China has not been fully exposed to the Free World for a long period of time, there would have been a great amount of misunderstanding about their competency and integrity to deal with internationally oriented commercial transactions with a view to internationally acceptable manner. This arbitration case was related to the contract in dispute of C&A Inc. as the importer v. China XX Importation Co. as the exporter for the sale of Silicon Metal. But after the contract were formed, exporter(respondent) declined to deliver the goods under the contracts because the market price of Silicon Metal increased according to the argument of the importer(claimant). Importer had to purchase alternative goods from other companies to substitute for the goods subject to the contracts in dispute. Importer purchased silicon metal of the same quality as under the contracts from two other Chinese companies as the necessary measure to mitigate the loss, paying prices higher than the contract price. Since exporter had breached the contracts, importer's loss should be compensated by the exporter as the Arbitration Tribunal decided for supporting importer's claim of loss for the substitute goods. This study is aiming at analyzing the rationale of the arbitral awards made by the Shanghai Commission in terms of (l)Place of Arbitration, (2)Applicable Law, (3)Validity of the Contracts, (4)Doctrine of Frustration, (5)Responsibility for the Mitigation of Damage by the Importer.

  • PDF

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

Analytical Effect of Retailers Pull-to-center Behavior on Determining Optimal Buyback Price (소매상의 제한된 합리성이 반품가 결정에 미치는 영향에 대한 분석적 연구)

  • Lee, Jung Min;Seo, Yong Won;Park, Chan-Kyoo
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.38 no.3
    • /
    • pp.87-101
    • /
    • 2013
  • The purpose of this paper is to analyze supplier's optimal decision of the buyback price facing irrational retailers. It has been known that retailers show irrational ordering behaviors, such as pull-to-center effect. We model the retailer's pull-to-center behavior and derive the supplier's optimal buyback price considering the retailer's bounded rationality. The result shows that the supplier's profit can be significantly improved exploiting the retailer's irrationality in the ordering behavior.

A Study on the Risk Examination of the Unit Price of Public Housing Construction Projects (공공주택공사에서의 도급단가 리스크 규명에 관한 연구)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.35-44
    • /
    • 2010
  • Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.

Passing of Risk of Loss of the Goods under CISG (국제물품매매협약상 위험이전)

  • HEO, Hai-Kwan;OH, Tae-Hyung
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.75
    • /
    • pp.1-28
    • /
    • 2017
  • Article 67 of CISG which provides for the passing of risk of loss of the goods applies to the contract of sale involving carriage of the goods. The risk here is in nature the price risk. Under Article 67(1), if the seller is bound to hand the goods over to a carrier at a particular place, the risk passes to the buyer when the goods are handed over to the carrier at that place; if the seller is not bound to hand them over at a particular place, the risk passes to the buyer when the goods are handed over to the carrier. In these cases, the risk passes even though the seller duly retains documents controlling the disposition of the goods. Article 69 of CISG applies to the contract of sale that does not involve carriage of the goods. Under Article 69(1) which covers the situation that the buyer is bound to take over the goods at the place of business of the seller, the risk passes when the buyer takes over the goods, however if the buyer does not take over the goods in due time, the risk passes at the time when the goods are placed at the buyer's disposal and he commits a breach of contract by failing to take delivery. Under Article 69(2) which covers the situation that the buyer is bound to take over the goods at a place (including his own place of business) other than the place of business of the seller, the risk passes when delivery is due and the buyer is aware of the fact that the goods are placed at his disposal at that place. Under these provisions of CISG, this study suggests what should be the definition of the contract of sale involving carriage of the goods. This study goes further to looks into what should be the concepts of the handing over of the goods by the seller to the carrier, the taking over of the goods by the buyer and the placing the goods at the buyer's disposal by the seller. This study may, we hope, provide a guidance for clearer understanding of the exact time of passing of risk under CISG.

  • PDF