• Title/Summary/Keyword: Consturction

Search Result 24, Processing Time 0.028 seconds

Experimental Study on Dynamic Property of Vibration-Controlled Concrete Beam (진동제어 콘크리트 보의 동적특성에 관한 연구)

  • 최우성;정영수;김현호;이상형
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.10a
    • /
    • pp.394-400
    • /
    • 1996
  • Recently, the construction of infrastructures has been booming and acceleratin to keep up with rapid economic growth. Consturction activities and operation of transportation facilities caues unfavorable effects such as civil petitions associated with vibration-induced damages or nuisances. Vibration-controlled mixtures are latex, rubber powder and plastic resin, which have been deternimed to reduce vibration by and large reduce vibration. KS F2437 and travel time method have been used to figure out 1st natural frequency and dynamic elastic moduli. Dynamic damping ratios have been computed by adopting the polynomial curvefitting method and the geometric analysis method on the frequency spectrum curve, of which results have been compared and analyzed hereon.

  • PDF

Optimum Support Pattern Design of the Tae-Gu Subway Tunnel (대구 지하철 터널의 적정지보패턴 선정에 관한 연구)

  • 지왕률;최재진
    • Tunnel and Underground Space
    • /
    • v.4 no.2
    • /
    • pp.119-131
    • /
    • 1994
  • This is a Double-Track Railway tunnel in typical Tae-Gu black and gray shale forming part of the No.1 Line of the Tae-Gu Subway. The main fault zone at tunnel is a moderately to highly weathered and closely jointed zone, 0.5 m wide with associated paralled jointing which is slickensided and fractured. After excavation by blasting, the soft rocks should need to be reinforced with optimal supporting pattern which might be better redesigned through the consideration of the results of in-situ rock measurements at the field. Performances fo the field tests included Point Load Test, Schmidt Hammer Test, and field joint measurement gave the detail data for the optimum support design and safe excavation of the No.1 Line of Tae-Gu Subway at the No.1-7 consturction site adn the safety of this redesigned supports system was analysed by the FDM program FLAC.

  • PDF

Integration of Construction Inspection to Schedule Management (공정관리와 연계한 건설 검측 업무 체계화 방안)

  • Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

A Study of the Construction in order to 24/25 I-NRZI Modulator Designs for DVCR (DVCR용 24/25 I-NRZI 변조기의 설계를 위한 구조 고찰)

  • Park, Jong-Jin;Kook, Il-Ho;Kim, Eun-Won;Cho, Won-Kyung
    • Journal of the Institute of Electronics Engineers of Korea TE
    • /
    • v.37 no.1
    • /
    • pp.35-41
    • /
    • 2000
  • This paper considers the consturction of 24/25 I-NRZI (Interleaved - Non Return to Zero Inverse) modulator designs for DVCR (Digital Video Cassette Recorder), and size of validity bit in order to store the amplitude value of square-wave and the standard data ( sine and cosine coefficients) at ROM Table that to acceptable the spectrum standard. The validity bit size of the standard data and the amplitude value of square-wave that to store at ROM Table are affected the size of pilot signal on the output spectrum, and the hardware size of modulator. At the designable 24/25 I-NRZI modulator, we simulated using random pattern (F0,F1,F2) that to verification the output data of the spectrum. Moreover, the resultant of the spectrum analysis, at the optimizing value, is 0.065 on the amplitude value of square-wave, and 3bit on the size of bit in order to store the standared data at ROM Table. In order to verify the hardware of designable 24/25 I-NRZI modulator, we perform to modeling of C-language firstly, and coding to Verilog HDL (Cadence Verilog XL) and synthesized using Synopsys (Library "Samsung KG75") tool as a base of spectrum results. In a foundation of this result, we are considered the size of hardware. In this paper, a considerable 24/25 I-NRZI modulator designable less than 10,000 gates as that is improved consturction as regards the path method of pre-coder etc, and able to application digital camcorders as now practical use.

  • PDF

A Study on the Prediction Method of Ground Displacement by Deep Excavation (깊은굴착에 의한 지반변위의 예측방법에 관한 연구)

  • 안종필;박경호
    • The Journal of Engineering Geology
    • /
    • v.12 no.1
    • /
    • pp.1-21
    • /
    • 2002
  • Recently, the rapid industrialization and urbanization of the country due to a high economic growth, require optimization, usage and the expansion of underground space. Therefore the consturction of large and deep basements takes place in braced excavated area where their earth retaining structures cause many problems such as settlement and damages of nearby buildings and underground utilities. this study deals with the influence distance of settlement and the amount for settlement based on the measurement which were obtained at five excavation construction sites. Maximum ground surface settlement, (0.28∼0.3)(%)H utilizing depth, is similar to the measurement and the value by Clough's method. It was found that the settlement and the influence distance of settlement calculated by Clough's method were rational.

Experimental Study on Interface Shear Strength of Concrete in Vertical Construction Joint (콘크리트 수직시공이음 접합면의 전단강도에 대한 실험적 연구)

  • Kim, Ook-Jong;Kim, Young-Chan
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.2
    • /
    • pp.125-129
    • /
    • 2004
  • In masive concrete placement, cracking problem due to hydration heat is frequently encountered. One of measure to solve this problem is to make a construction joint. However, it is cumbersome to make it by chipping the surface of joint. In this study, push-out test for 18 specimens was conducted to compare the interface shear strength of consturction joints whose surfaces were prepared with three methods; chipping, rib-lath, folded rib-lath. Compared to the specimens made with conventional surface chipping, those with rib-lathe showd excellent preformance increasing shear resistance capacity and the role of shear key conceived by folding rib-lath played important role in enhancing shear resistance.

Design and consturction of single drilled shaft foundation (단일 현장타설말뚝 기초의 설계 및 시공)

  • Jeon, Kyung-Soo;Kim, Kyung-Suk;Kim, Jeong-Yeul
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.86-100
    • /
    • 2006
  • The single drilled shaft foundation has been used in the other countries, but has not used in South Korea at all This foundation is very effective and economic method in South Korea which is easy to meet a good rock mass within 50m depth from the ground We have many experiences to construct 1.52 5m drilled shaft foundations and ability to construct 30m drilled shaft foundation without special efforts The soil behavior is nonlinear, but it can be proposed in linear in practical purpose on bridges. The elastic modulus of soil can be rationally obtained by the method of Road Bridge Design Manual in South Korea using the Schmertmann(1970)'s proposal, and the elastic modulus of rock can be obtained by the field test. In seismic design the column and drilled shaft must be restricted to the elastic design because the behavior of this foundation is flexible and the arrangement of the rebars makes the various defect In this paper the design criteria is compared with FHWA design criteria, and the design criteria is proposed in consistent with Road Bridge Design Manual in South Korea. The single drilled shaft foundation of a test bridge was constructed in the Iksan-Jangsoo highway, and we checked its stability, workability and economy

  • PDF

A Basic Study on Quantification Model Development of Human Accidents based on the Insurance Claim Payout of Construction Site (건설공사보험 사례를 활용한 건설현장 인명사고 정량화 모델 개발 기초연구)

  • Ha, Sun-Geun;Kim, Tae-Hui;Kim, Ji-Myong;Jang, Jun-Ho;Son, Ki-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.195-196
    • /
    • 2017
  • The number of human accidents in the construction industry is increasing every year, and it constitute the highest percentage among industry. This means that activities performed to prevent safety accidents in the country are not efficient to reduce the rate of accidents in the construction industry. In order to solve this issue, research has been conducted from various perspectives. But, research regarding to quantification model of human accidents is insufficient. the objective of this study is to conduct a basic study on quantification model development of human accidents. To achieve the objective, first, Cause of accident is defined the through literature review. Second, a basic statistic analysis is conducted to determine the characteristics of the accident causes. Third, the analysis is conducted after dividing into four categories : accumulate rate, season, total construction cost, and location. In the future, this study can be used as a reference for developing the safety management checklist for safety management in construction site and development of prediction models of human accident.

  • PDF

EXPLORING THE CHALLENGES TO USAGE OF BUILDING CONSTURCTION COST INDICES GHANA

  • Osei-Tutu, E;Adobor, C.D;Kissi, E.;Osei-Tutu, S.;Adjei-Kumi, T.
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.313-320
    • /
    • 2017
  • Price fluctuation contract is imperative and of paramount essence in the construction industry as it provides adequate relief and cushioning for changes in the prices of input resources during construction. As a result, several methods have been devised to better help in arriving at fair recompense in the event of price chang es. However, stakeholders often appear not to be satisfied with the existing methods of fluctuation evaluation, ostensibly because of the challenges associated with them. The aim of this study was to identify the challenges to usage of building construction cost indices in Ghana. Data was gathered from contractors and quantity surveying firms. The study utilized survey questionnaire approach to elicit responses from the contractors and the consultants. Data gathered was analyzed scientifically, using the Relative Importance Index (RII) to rank the problems associated with the existing methods. The findings revealed the following among others; late release of data; inadequate recovery of costs; and work items of interest not included in the published indices as the main challenges of the existing methods. This study will provide useful lessons for policy makers and practitioners in decision making towards the usage and improvement of available indices.

  • PDF

Construction Based Model for Assessing Maturity Level of Enterprises

  • Marzouk, Mohamed;Attia, Tarek;El-Bendary, Nasr Eldin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.14-19
    • /
    • 2012
  • Maturity models allow organizations to assess and compare their own practices against best practices or those employed by competitors, with the intention to map out a structured path to improvement. This research explores the aspects of the Maturity Models that are relevant to distinguish them from one to another. The different Project Management maturity models for define maturity differently and measure different things to determine maturity. Because of this, organizations should give careful consideration to select appropriate maturity model. The main reason behind this research lies on the modification to the existing Organizational Project Management Maturity Model (OPM3) by adding four knowledge areas, dedicated to construction industry as best practices. These are Safety, Environment, Financial and Claim Management. This Model contains (Yes/No) questions; all of these questions must be answered before the user reviews the results that describe the overall maturity and areas of strength and weakness of an organization. The research presents the implementation of the proposed Model Construction Enterprises Maturity Model (CEM2). All the components of the developed Model have been implemented in Microsoft Access. CEM2 helps Construction Enterprises to assess their Maturity Level and know Areas of Weaknesses for future improvement. The easy to use Yes/No user interfaces help enterprises' employees to assess the maturity level of their enterprises. The Model maintains users' responses in its database; as such, many employees from different enterprise divisions can be involved during assessment phase in several sessions.