• 제목/요약/키워드: Construction validity

검색결과 706건 처리시간 0.022초

Telematics 기술의 건설현장 적용을 위한 경제적 타당성 분석 (Analysis of Economical Validity for Implementation of Telematics in Construction Fields)

  • 이성현;이동욱;구자경;이태식
    • 한국철도학회논문집
    • /
    • 제8권5호
    • /
    • pp.444-453
    • /
    • 2005
  • The safety evaluations of railway wheelsets make use of the static fracture toughness obtained in ingot materials. The static fracture toughness of wheelset materials has been extensively studied by experiments, but the dynamic fracture toughness with respect to wheelset materials has not been studied enough yet. It is necessary to evaluate the characteristics of the fracture mechanics depending on each location for a full-scale wheelset for high-speed trains, because the load state for each location of the wheelset while running is different the contact load between the wheel and rail, cyclic stress in the wheel plate, etc. This paper deals with the fracture toughness depend on load rates. The fracture toughness depending on load rate data shows that once the downward curve from quasi-static values was reached, subsequent values showed a slow increase with respect to the impact velocity. This means that dynamic fracture toughness should be considered in the design code of the wheelset material.

아웃소싱 업체의 전략적 제휴를 위한 재고 공유 시스템 타당성 연구 - 제조업체 재고 및 판매 중심으로 - (Study on the Validity of Inventory Sharing System for the Strategic Cooperation of Outsourcing Companies)

  • 김경섭;박진원;정석재;송일윤
    • 한국시뮬레이션학회논문지
    • /
    • 제12권4호
    • /
    • pp.61-71
    • /
    • 2003
  • Recently, a matter of the highest priority that the company must do for the satisfaction of customer service is that the company ensure the competitive power throughout the strategic cooperation in the market environment changing rapidly In this situation, one of allied strategies is the supply chain management and the outsourcing is one of the supply chain management strategies. In this paper, the inventory sharing system is introduced as the method to solve two inconsistency problem such as inventory and customer service. This paper also suggests how to increase customer service and to decrease inventory throughout construction of the inventory sharing system among outsourcing companies. For this, we experimented the effect of the inventory sharing system on the supply chain dynamics by using the simulation modeling and analyzed the validity about construction of the inventory sharing system presented in this study. The simulation is designed by Vensim(Process simulation package) and has some feedback loops.

  • PDF

공동주택 재건축 안전진단 적정성 검토 사례분석 연구 - 건축 마감 및 설비노후도 평가 중심으로 - (A Case Analysis Study on the Validity Assessment of Safety Inspection Findings for Reconstruction - Focusing on the Building Finish and Equipment Deterioration Sector -)

  • 전준서;김홍섭;김은영;최경철;이문환
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.271-272
    • /
    • 2023
  • In this study, we conducted a case analysis of the building finish and equipment deterioration sector in the validity assessment of safety inspection findings for reconstruction. A total of 21 cases were analyzed to confirm the characteristic of performance score for each subsector. It is confirmed that the average performance score was generally affected by maintenance activity, had regional characteristics.

  • PDF

사례기반 건설안전 관리시스템의 추론 모형 (Reasoning Model of the Case-Based Construction Safety Management System)

  • 예태곤;이재용;이현수
    • 한국안전학회지
    • /
    • 제14권1호
    • /
    • pp.167-176
    • /
    • 1999
  • Construction accidents occur reiteratively in similar fashions. There have been several attempts to develop a safety program for preventing construction accidents on sites. It will be very effective to use previous accident cases for establishing proper safety plan and managing safety process. This research develops a case-based construction safety management system which enables construction managers or safety managers to prevent potential accidents during the construction process. The case-oriented approach is performed through the representation of previous accident cases in accordant with the similarity to the conditions of current site. It uses a case-based reasoning which is one of the reasoning methods of an expert system. A prototype system for the reasoning model was implemented using one of the case based system development tools. The system was applied to a real construction site to verify its capability and validity. It was founded that the causes of accidents were successfully removed, so the proposed model proved to be reasonable. Additional research is needed to resolve the technical problem how to adapt the countermeasures for accident prevention provided by the reasoning model.

  • PDF

4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성 (Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation)

  • 송성열;양정삼;명태식
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

Life Cycle Cost Breakdown Structure Development of Buildings through Delphi Analysis

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Ryu, Han-Guk;Kim, Gwang-Hee;Kim, Tae-Hui
    • 한국건축시공학회지
    • /
    • 제12권5호
    • /
    • pp.528-538
    • /
    • 2012
  • With domestic construction projects becoming bigger, more specialized and more advanced, the construction industry is striving to improve quality and quantity, and is diversifying functions and shapes. Nevertheless, the process of a construction project causes problems when we estimate construction price, because the cost breakdown structures are different in each step. The primary aim of this study was to estimate building life cycle cost using the Delphi method. The cost breakdown structure for life cycle cost was classified into planning, design, construction, maintenance and waste disposal, and each detailed classification was determined by estimating life cycle cost. Moreover, the developed cost breakdown structure is verified by consulting with experts to secure objectivity and validity.

Individual behavioral competences for construction project risk manager

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moonseo;Kwon, Byung-ki;Hyun, Hosang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.183-187
    • /
    • 2015
  • The Risk Management (RM) is applied for managing uncertainty of project. In this circumstance, the competences of RM have a direct effect on the performance of its application. Especially, as the RM, one of the project management areas, is a peopleoriented management field, the individual behavioral competences are significant for a risk manager. Therefore, this paper describes the development of individual behavioral competences for construction project risk manager. For this, the research classifies the individual behavioral competences of RM. And, the Exploratory Factor Analysis (EFA) are applied to verify a validity of the competences. Likewise, a reliability analysis using Cronbach's alpha values is performed to test internal consistency. Based on the results, the authors carry out the Focus Group Interview (FGI) on expert panels of construction RM to confirm the hierarchical model of the individual behavioral competences. It is concluded that the proposed hierarchical model of individual behavioral competences helps construction companies to diagnose the competences of their project risk manager for progressing.

  • PDF

BIM for Construction Quality Record

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.252-254
    • /
    • 2015
  • Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.

  • PDF

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

대한정형도수물리치료학회 비대면 강의 체계 구축 연구: 포스트 코로나19 대비 델파이 기법 분석 적용 사례 (A Study on the Construction of Non-face-to-face Lecture of KAOMPT: Delphi Survey Research to Post COVID-19 Untact Era)

  • 김진영;신영일;양성화
    • 대한정형도수물리치료학회지
    • /
    • 제27권1호
    • /
    • pp.1-11
    • /
    • 2021
  • Background: The purpose of this study is to identify the elements for the construction of the Korean academy of orthopedic manipulative physical therapy's (KAOMPT's) non-face-to-face lecture system using the Delphi method. Methods: The Delphi method was applied to 50 expert panel members of the Central Committee and the Provincial Branch of the KAOMPT. The Delphi survey was conducted in two rounds, and the first Delphi survey collected opinions on 40 questions on 12 topics. The second Delphi survey was collected into 25 questions on 4 topics. As a result of the survey, the content validity ratio (CVR), consensus and convergence were measured. Referring to the number of expert panels and previous studies were determine a CVR of at least 2.29, a consensus of at least .75 and a convergence of 0 to .5. Result: In the first Delphi result, out of the total 40 items, 20 items with high content validity ratio were found, and 10 items found double agreement. In the second Delphi result, 13 out of the total 25 items had a content validity ratio higher than 2.29, and 5 items found a double agreement. Conclusion: This study derived items on the role of central and municipal councils, lecture support and lecture room construction, non-face regular course and special lecture operation and personnel for the establishment of non-face-to-face lecture system. Based on this content, it is expected that it will help establish a non-face-to-face lecture system in 2021 through a pilot non-face-to-face lecture that will be implemented in the future.