• Title/Summary/Keyword: Construction technology sector

Search Result 186, Processing Time 0.026 seconds

A Case Study on HVAC&R Energy Efficiency in Office Buildings (사무소 건물 HVAC&R 시스템의 에너지 효율화 사례연구)

  • Cho, Jin-Kyun;Woo, Kyung-Hun;Park, Woo-Pyoung;Shin, Seung-Ho
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.9 no.1
    • /
    • pp.8-14
    • /
    • 2013
  • HVAC&R systems are the most energy consuming building services representing approximately half of the final energy use in the building sector. Despite their significant energy use, there is a lack of a consistent and homogeneous framework to efficiently guide research, mainly due to the complexity and variety of HVAC&R systems but also to insufficient rigour in their energy analysis. This research reviews energy consumption of HVAC&R systems with the aim of establishing a common idea for the analysis of energy efficiency. The paper focuses on energy flow of the HVAC&R which include air-conditioning, transport and heat generation system for low-energy buildings.

Development and Application of Failure-Based Learning Conceptual Model for Construction Education

  • Lee, Do-Yeop;Yoon, Cheol-Hwan;Park, Chan-Sik
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.11-17
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning conceptual model.

ROBOTICS AND AUTOMATION IN CONSTRUCTION INDUSTRY

  • Younus Khan;G. Chandra Sekhar Reddy;V.S.S. Kumar
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.527-532
    • /
    • 2005
  • The construction industries are facing problems of productivity, quality of work, safety, and the completion of projects in time. In construction industry a worker is exposed to hazardous environment, and has to do more physical work, effecting his health and also productivity. The automation and robotics can offer solution to many problems of the industry. In the past the major barrier to construction automation is the lack of electronic components and systems. This is solved now with the development of information technology, and the current obstacle is the high cost of automated systems, shortage of public money for R&D, and problems of acceptance. The robots employed in construction have followed the same concept as those employed in manufacturing. However, construction industry requires a different kind of robot compared to manufacturing Industry. The robots are stationery and product moves along the assembly line in manufacturing sector, but construction robots have to move about the site because buildings are stationary and of large size. The construction robots must function in adverse weather conditions, including variation in humidity, and temperature and increase the overall construction productivity rate. The major objective of the paper is to review the existing applications of building robots and to assess their implementation in building industry. A case study is considered for the implementation of robots for the painting work of the University Building at Saifabad PG College of Science, Hyderabad, India.

  • PDF

An Analysis on Determinants of the Amount of Orders Received in Construction Technology Engineering Industry Sector (건설기술부문 엔지니어링업체의 수주액 결정요인 분석)

  • Lee, Jae Song;Kim, Hyun Soo;Jang, Keun Young;Choi, Yeol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1087-1093
    • /
    • 2017
  • The purpose of this study is to present an empirical analysis of determinants of the amount of orders received in construction technology engineering industry sector. Regression model was applied for 5 years from 2010 to 2014 to find out how the factors affecting the amount of orders received each year are different and what trends are observed. Although common significant variables were identified that there is a difference in the impact on their orders received. Specifically, the increase in the number of orders received while reducing the impact on orders received from 2010 to 2013, 2014 showed a slight tendency to increase. And increase in the number of employees shows that the influence of order received is higher in 2014 than in 2010. In addition, the gap between the metropolitan area and the non-metropolitan area has doubled in 2014 compared to 2010, but it is also confirmed that the metropolitan area is still strong. On the other hand, in the case of licensed technology, the only statistically significant variable was the negative correlation between the amount of orders received. Although the influence declined in 2014 compared to 2011, it still had a large impact on the amount of orders received.

'Knowing' with AI in construction - An empirical insight

  • Ramalingham, Shobha;Mossman, Alan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.686-693
    • /
    • 2022
  • Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.

  • PDF

A Study on the Design Development and Construction Process in British Airways London Eye (런던아이의 디자인 전개와 건립과정에 관한 연구)

  • Woo, Dae-Seung
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

Policy Evaluation and Improvement Plan of Overseas Construction Engineering Industry (해외 건설엔지니어링산업의 정책평가 및 개선방안)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.375-384
    • /
    • 2018
  • Due to the downturn in the local construction business, entry into the overseas markets has been regarded as one of the core tasks of the building sector and the government. Thus, entry into overseas markets, not only by large and middle-standing enterprises, but also by small and medium sized enterprises, has recently become a major construction policy. Therefore, this study identified and evaluated overseas construction support policies in the field of construction engineering, ranked them as the policies for developing market development funds, fostering and educating expert workers, and supporting the provision of information on winning orders. Through these policy assessment results, the study proposed improvement measures from the government and from the business side. As for the government viewpoint, a measure of providing information suited to engineers in design companies, project manager (PM), construction manager (CM), a measure of producing skillful workers through the expansion of education support policies, and the promotion of specialized overseas workforce in the construction engineering sector were proposed. In the construction engineering industry, this study suggested measures for securing global expert manpower, sharing performance of overseas construction market development project, strengthening construction project management capacity, and strengthening risk management.

The Study on Hardware Sizing Method Based on the Calculating (계산에 기초한 하드웨어 도입 규모산정 방식 연구)

  • Ra, Jong-Hei;Choi, Kwang-Don;Jung, Hae-Yong
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.47-59
    • /
    • 2006
  • According to the policy for "e-Korea construction" of Korean government, Investment of information system during the past decade are dramatically increasing. More than a half of this investment is cost of hardware infrastructure. So, accurate hardware sizing are essential for higher efficiency of investment. Accurate hardware sizing benefits are generally viewed in terms of the avoidance of excess equipment and lost opportunity costs by not being able to support business needs. Unfortunately, however, little research effort to make the hardware sizing methodology are doing. We propose a sizing method for information system in public sector. This method is determinate empirical study that are gathering and analyzing cases, making method and reviewing expert. Finally we are proposed calculating method for hardware components that is CPU, memory, internal and external disk according to the application system type which is OLTP, Web, WAS. Our study certainly will act as a catalyst for higher investment-efficiency of the future information programs in public sector.

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

South-South Collaborations: A Policy Recommendation Model for Sustainable Win-Win Infrastructure Partnerships Based on Sino - Ghana and Nigeria Case.

  • Eshun, Bridget Tawiah Badu;Chan, Albert P.C.;Oteng, Daniel;Antwi-Afari, Maxwell Fordjour
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.33-41
    • /
    • 2022
  • Infrastructure procurement has been a major engagement route between China and Africa. This contributes immensely to the gradual infrastructure development seen on the continent. However, maturing discourse purports that these infrastructure collaborations lack intentionality in the continuous development of strategic guidelines and policies for effective implementation despite their uniqueness and criticality. This study proposes that an efficient approach to policy recommendations is through the political and economic analysis (PEA) of these partnerships using public-private partnership (PPP) optics. Unquestionably, these partnerships are representative of the concept of diplomatic transnational public-private partnership (DT-PPP) where infrastructure is procured through the collaboration of public (African governments) and private sector (Chinese state-owned corporations) who provide the managerial, financial, and technical resources for the project implementation. Given the quest for sustainable win-win, this study identifies strategies towards the realization of win-win in the implementation (i.e enablers of win-win) such that fairness and co-benefit, as well as interests, will be achieved. Thus, based on the PEA framework, case scenarios from Ghana and Nigeria using expert interviews identify the criticalities and best practices for the realization of these enablers at the development phase. Findings indicate more effort is required of the public sector (African host countries) in terms of people, structure/institutions, and the implementation processes. Recommendations include improvement of environmental management structures, contract administration procedures, external stakeholders/local community engagement mechanisms, knowledge and technology transfer procedures, and sector-based project operation and maintenance culture and systems. Additionally, actors must have emotional intelligence, good problem-solving abilities, and overall ensure cordial relationships for continued bilateral cooperation.

  • PDF