A Study on the Construction of Detail Integrated Scheduling System of Ship Building Process (선박건조공정의 미세 통합 일정 관리 체계 구축에 관한 연구)

  • Kim, Yong-Seop;Lee, Dae-Hyung
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.44 no.1 s.151
    • /
    • pp.48-54
    • /
    • 2007
  • Higher productivity and less cost during the manufacturing process of ships are required to maintain international competitiveness of modern shipbuilding industries. The integrated hull/ outfitting/ painting scheduling(IHOP) process is a final point, where logistics are finally being integrated and upcoming schedules are made. Therefore, more profits are expected from IHOP by effective management. In this thesis, IHOP is proposed in order to solve how to choose block erection date with IHOP scheduling logic. The result of IHOP scheduling is highly advised to utilize fabrication, outfitting shops. A standardized operation and load of resource will eventually be applied in long-term time span point of view for this will make it easy to enable capacity planning and workforce planning. It is also expected to eliminate inefficiency in overtime work and efficiently utilize manpower in short-term.

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

Projection of Activity Duration Utilizing Historical Cost Data (자원투입 비용을 고려한 공정관리 작업기간 산정)

  • Moon, Sung-Woo;Kang, Sang-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.444-447
    • /
    • 2006
  • Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.

  • PDF

Implementation of Cable Drum Scheduling Algorithm for Productivity Enhancement of Power Plant Electrical Installations (발전소 전기설비의 생산성 향상을 위한 케이블 드럼 스케줄링 알고리즘 구현)

  • Lee, Yang-Sun;Park, Ki-Hong;Choi, Hyo-Beom;Oh, Ji-Hyun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.10a
    • /
    • pp.770-771
    • /
    • 2015
  • In this paper, we proposed and implemented the automation of cable drum scheduling which is required a considerable construction cost for electrical equipment in power plant. Implemented cable drum scheduling can be reduced the calculation time of cable drum scheduling, and it is possible to minimize the consuming time of cable drum scheduling than conventional methods. Some experiments are conducted to verify the proposed method, and as a result, the automation of cable drum scheduling is well performed, enabling cables can be optimized and scheduled to fit the drum capacity with productivity enhancement of electrical installations.

  • PDF

An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings

  • Kim, Sun-Kuk;Son, Ki-Young;Joo, Jin-Kyu;Lee, Dong-Hoon;Lee, Sung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.396-406
    • /
    • 2011
  • Execution of the finish work for high-rise residential construction occurs when a mixture of work progresses simultaneously at each floor or sector and is carried on by highly-specialized subcontractor teams. Therefore, the finish work plan requires an effective scheduling method that interfaces between the work and the teams. In order to address these issues, the TACT technique is utilized in Korea. This technique is based on Line-of-Balance and Lean construction. However, according to recent case studies, finish work using TACT technique was frequently delayed with cost overruns because the work was performed without a detailed schedule control plan outlining the relationship between architecture and mechanical, electrical, and plumbing work. This paper describes the enhanced-TACT technique which provides a detailed work flow chart and TACT work template. With improved TACT technique, this paper will contribute to improved cash flow and reduced cycle time and provide quality improvement through work continuity.

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

Preparing a Construction Cash Flow Analysis Using Building Information Modeling (BIM) Technology

  • Kim, Hyunjoo;Grobler, Francois
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.1
    • /
    • pp.1-9
    • /
    • 2013
  • Construction is a competitive industry and successful contractors must be able to win bids to obtain projects. Cash flow analysis not only determines actual profit at the end of the project, but also estimates required cash resources or cash ballances at the end of every month. Cash flow analysis is important in managing a construction project; however, it requires extensive information that is not immediately available to the general contractor. Before contractors can perform cash flow analysis, they must first complete a series of pre-requisites such as the quantity take off, scheduling, and cost estimating, followed by accurate assessments of project costs incurred and billable progress made. Consequently, cash flow analysis is currently a lengthy, uncertain process. This paper suggests improved cash flow analysis can be developed using data extraction in Building Information Modeling (BIM). BIM models contain a wealth of information and tools have been developed to automate a series of process such as quantity takeoff, scheduling, and estimating. This paper describes a prototype tool to support BIM-based, automated cash flow analysis.

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

Method of Transforming PDM Overlapping Relationships to BDM Overlapping Relationships in CPM Schedule (CPM 공정계획의 PDM 중복관계를 BDM 중복관계로 전환시키는 방법)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.144-152
    • /
    • 2012
  • The reason why most scheduling softwares currently using at construction projects adopt PDM (Precedence Diagramming Method) is that it can express an overlapping relationship between activities. However, the overlapping relationships in PDM are represented only by combinations of four overlapping types that connect the start and finish points of two activities, therefore, PDM cannot express efficiently the relationships between any middle points of two activities if they should be represented. This research proposes the method of transforming the four overlapping types of PDM to the overlapping relationships of BDM(Beeline Diagramming Method), new networking technique, that can connect the inter-relationships at any middle points of two activities as well as express multiple overlapping relationships. The proposed method will help not only to improve an efficiency of scheduling but also to upgrade the scheduling technique because BDM technique has a lot of unique advantages in scheduling.