• Title/Summary/Keyword: Construction scheduling

Search Result 304, Processing Time 0.028 seconds

Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field (건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발)

  • Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.467-476
    • /
    • 2014
  • According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

Application of the 3D CAD Model Data for 4D Simulation and Quantity Estimation (4D 시뮬레이션 및 일정별 물량정보검색을 위한 3D 모델 정보 활용)

  • Lee Jae-Cheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.107-114
    • /
    • 2004
  • This paper represents the application of the 3D CAD Model data for 4D simulation and quantity estimation. These support the effective and practical use of 4D CAD model. By using and manipulating the 3D CAD model information, scheduling and quantity estimation could be developed more quickly and effectively. So the 3D CAD model information is made use of not only drawing a blueprint but also playing an important part of data integration platform. The scheduling module sets up the schedule generation logic that consists of period, priority of element arrangement, and time lag of floor placement. It sorts the working items as a priority of working process. And the quantity estimation module queries the material quantity of the structural elements according to the scheduling conditions. These two modules are developed using the 3D CAD model information and assist the function of 4D CAD model.

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

Exact Activity Overlapping Method for Time-cost Tradeoff

  • Gwak, Han-Seong;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.109-110
    • /
    • 2015
  • This paper presents a computational method that identifies an exact set of optimal overlap rates between critical activities to meet job site specific needs by using rework cost-slope. The procedures to compute the exact solution are provided in peudocode algorithm. The method is coded into Exact Concurrent Construction Scheduling system that allows practitioners to make more informed decision in accordance with the site-specific condition involved in the overlapping of critical activities. Test cases verify the validity of the computational method and the usability of the system.

  • PDF

Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

Research of Circuit Working Construction Elevator with Single-guide Rail and Multi-cages

  • Kun Zhang;Kaiqiang Wang;Di Li;Qing Sun;Zhen Ye;Wei Liu
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.137-144
    • /
    • 2022
  • As one of the most important vertical transportation equipment in super high-rise buildings, the construction elevator directly affects the project period, cost, and effectiveness. The paper proposes a new construction elevator with single-guide rail and multi-cages. It can solve the problems of single construction elevator capacity shortage and efficacy decrease with height reduction, the occupancy of plan and elevation position of multiple construction elevators, and extension of total construction period by cycling operation of multi-cages on a single-guide rail. The paper focuses on the design and research of the main components of the equipment, such as the rotating guide rail mechanism, vertical bearing mast tie system, segmented electrical power supply system, group control scheduling system, and safety anti-collision system.

Development of a Descriptive Cost Effectiveness Model for a Subcontractor with Limited Resources

  • Kim, Dae Young
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.40-48
    • /
    • 2017
  • It only takes one failed project to wipe out an entire year's profit, when the projects are not managed efficiently. Additionally, escalating costs of materials and a competitive local construction market make subcontractors a challenge. Subcontractors have finite resources that should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. The objective of this thesis is to identify the effect of productivity changes on the total cost resulting from shifting crews across projects using a descriptive model. To effectively achieve the objective, this study has developed a descriptive cost model for a subcontractor with multi-resources and multi-projects. The model was designed for a subcontractor to use as a decision-making tool for resources allocation and scheduling. The model identified several factors affecting productivity. Moreover, when the model was tested using hypothetical data, it produced some effective combinations of resource allocation with associated total costs. Furthermore, a subcontractor minimizes total costs by balancing overtime costs, tardiness penalties, and incentive bonus, while satisfying available processing time constraints.

A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints

  • Jeon Hyong-Bae;Kim Jun-Gyu;Kim Hwa-Joong;Lee Dong-Ho
    • Management Science and Financial Engineering
    • /
    • v.12 no.1
    • /
    • pp.95-112
    • /
    • 2006
  • Disassembly scheduling is the problem of determining the quantity and timing of disassembling used or end-of-life products while satisfying the demand of their parts and/or components over a planning horizon. The case of assembly product structure is considered while the resource capacity constraints are explicitly considered. A cost-based objective is considered that minimizes the sum of disassembly operation and inventory holding costs. The problem is formulated as an integer programming model, and a two-stage heuristic with construction and improvement algorithms is suggested in this paper. To test the performance of the heuristic, computational experiments are done on randomly generated problems, and the results show that the heuristic gives near optimal solutions within a very short amount of computation time.