• 제목/요약/키워드: Construction of complex

검색결과 1,942건 처리시간 0.034초

도막.시트 일체형 방수재를 이용한 옥상용 복합방수 공법에 관한 실험적 연구 (An Experimental Study on the Roof Composite Waterproofing Method for Membrane & Sheet Integrated Waterproofing Material)

  • 오미현;박진상;최성민;박영태;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.31-34
    • /
    • 2006
  • In this study on the appliable Asphalt sheet of monolithic and inorganic matter waterproofing material using of field because of problem of complex waterproofing sheet. Before this cement polymer modified waterproof coating and appliable asphalt sheet of monolithic whether have stability by method of construction about all style waterproofing that evaluate to new method of construction development naturally big emphasis put and try to approach. Did performance test item first at, as a result, drew by suitable thing in all KS items. This is considered to have more effective spot construction work because if means that have stability by material as well as method of construction.

  • PDF

4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성 (Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation)

  • 송성열;양정삼;명태식
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

디지털 패브리케이션을 활용한 비정형 건축물의 시공공법 고찰 (Review of Freeform Buildings using the Digital Fabrication)

  • 김성진;박영미;박성진;박기홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.175-176
    • /
    • 2015
  • Starting from Guggenheim Bilbao Museum in 1997, it has been increased steadily that complex geometry buildings using digital designs and construction process. Since 2010, the domestic Freeform design has been widely used for buildings such as Dongdaemoon Design Plaza, Seoul City Hall, Tri-Bowl, and etc. But there are many defects such as the increased cost and period of construction, and the declined quality of construction because of the lack of optimized method and engineering experiences. Therefore, this study has an effort to review case study of the recent freeform buildings and construction methods using digital fabrications. And this study proposed the improve method for the construction quality for freeform buildings.

  • PDF

AI와 디지털 트윈을 결합한 지능형 건설안전 위험감지 시스템 개발 (The Development of an Intelligent Risk Recognition System for Construction Safety by Combining Artificial Intelligence and Digital Twin Technology)

  • 서정완;김동오;이태규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.405-406
    • /
    • 2023
  • In the era of AI, intelligent construction safety technologies are being introduced to the construction safety environment, but the application of AI has limitations due to the lack of accident images to learn in complex construction sites. In order to overcome this, we will introduce an intelligent risk detection system that dramatically improves risk detection accuracy by combining AI with digital twin technology, and introduce various cases.

  • PDF

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구 (Development of Construction Schedule Management System based on BIM)

  • 박소현;송정화;오건수
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

국제표준기반의 건설도면정보 교환 모델에 관한 연구 (A Study on Construction Drawing Data Exchange Model for Information Interoperability Based on International Standards)

  • 김인한;김경
    • 한국CDE학회논문집
    • /
    • 제6권3호
    • /
    • pp.147-156
    • /
    • 2001
  • In the construction industry, construction process includes a variety of design stages with cooperation and regulation by many related disciplines. In addition, the construction market is growing and becoming more complex. With this characteristic, design information has become more and more complicated and difficult to manage by the simple and traditional data management methodology. In the practical field, although CAD has been widely available for the last ten years, related disciplines have not shared digital information efficiently. This paper suggests a construction CAD data exchange model that has been developed through investigation and analysis of Korean construction CAD practices and foreign CAD standards. Moreover, this paper investigates a CAD data exchange model using STEP to improve information availability and overcome the limit of CAD systems.

  • PDF

CONSTRUCTION MATERIAL MANAGEMENT USING SMART MOBILE COMPUTING

  • Kwang-Pyo Lee;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.221-228
    • /
    • 2011
  • As construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued and more effective construction management is needed in construction industry. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause re-processing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Meanwhile, these technologies rather decrease the construction productivity except for the data saving and database function. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. In virtue of the construction material management Application which will be developed in this study, it will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible. At the same time, this study will investigate the possibility and applicability of new IT device, Smart Phone to construction sites.

  • PDF

아산배방 복합단지개발 PF사업의 CM적용 사례와 향후 발전방향에 관한 연구 (A Study on the status and improvement of construction management in Project Finance Business of Asan Baibang public combination)

  • 김종수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.19-24
    • /
    • 2008
  • 아산배방 복합단지개발 PF사업의 건설사업관리는 건설에 대한 전문적인 조직 구성 및 운영에 대한 여러 가지 문제점을 해결하기 위하여 발주자의 대리인으로 프로젝트 진행 과정을 관리하는 초고층, 초대형 복합단지개발 프로젝트이다. 본 사업은 민관합동 PF사업에서 의욕적으로 CM을 도입한 사례로 그 의미를 찾을 수 있다. 즉, 발주처는 건설본부 조직을 구성하여 많은 직원을 고용하지 않고도 초대형 복합단지개발 프로젝트를 성공적으로 수행할 수 있다는 가능성을 보여준 민관합동 PF사업의 CM 적용사례이다. 이에 본 사례연구에서는 CM사가 참여하면서 시공단계 및 준공이후단계에 적용하는 건설사업관리 업무를 기준으로 작성하였으며, 이를 통하여 민관합동 PF사업에 있어서 CM도입의 필요성을 검토하고, CM 적용효과를 분석함으로써 향후 민관합동 PF사업에서 CM도입의 확대 적용에 기여하고자 한다.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

건물의 형상이 안전사고에 미치는 영향분석에 관한 기초연구 (A Basic Study on Analysis of the Impact of Building Shape on Safety Accidents)

  • 손승현;김지명;안성진;한범진;나영주;김태희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.27-28
    • /
    • 2022
  • There is a limit to preventing various types of safety accidents in advance at construction sites. Even for buildings of the same total floor area, it is expected that the more complex the building shape or the higher the number of floors, the higher the probability of a safety accident. Therefore, it is necessary to analyze the effect of the shape of a building on safety accidents using safety accident data generated during actual construction. The purpose of this study is to analyze the impact of building shape on safety accidents. As a result, the R2 value of shape factor and safety accident was 0.901, and the R2 value of construction difficulty and safety accident was 0.944. In the future, the results of this study will be used as basic data for improving safety management related systems.

  • PDF