Selection Method of Remodeling Based on User Request (사용자 요구에 따른 공동주택 리모델링 선정방법)

  • 임재현;윤여완;양극영
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.119-124
    • /
    • 2003
  • Lately Construction industry tends to prefer remodeling of existing building rather then new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. Specially in case of Apartment houses, since vagueness on ownership and management authority on common part exists. So in this study we are to present the procedure of analyzing apartment house remodeling method through user request by approaching to several considerable factors in user request side.

  • PDF

Improvement of Architecture and Building Process of Sensor Network for Sustainable u-City Service (지속가능한 u-City 서비스를 위한 센서망의 구조 및 구축 절차 개선)

  • Choi, Yeon-Suk;Park, Byoung-Tae
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.1
    • /
    • pp.137-145
    • /
    • 2012
  • In the previous study, the construction guide line of IT infra-structure for a u-City was introduced. However, it is only concentrated on the components and construction procedure for provider-oriented and technology-oriented sensor networks. In this paper the architecture and building process of demander-oriented sensor networks for sustainable u-City service are proposed. In the paper it is described (1) the enhancement methods of the procedure that can be flexibly constructed according to the scale of the project, (2) the methods that can improve the structure from the wireless sensor network such as RFID/USN to the hybrid sensor network, and (3) the consideration factors for providing the sustainable u-City service.

EFFECT OF CONCRETE STRENGTH ON FLEXURAL DEFLECTION OF HIGH-STRENGTH REINFORCED CONCRETE BEAMS

  • Inju Lee;Taewan Kim;Sung-Nam Hong;Jie Cui;Sun-Kyu Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1313-1317
    • /
    • 2009
  • Deflections of Reinforced concrete structures must satisfy the permissible values and it is hard to predict the due to uncertainty of deflection of the reinforced concrete structures. Thus, many researchers have suggested a number of experimental equation of deflection against the uncertainty. In a specification, a procedure to evaluate flexure deflection using effective moment of inertia and moment-curvature relation is suggested. ACI offers a method using effective moment of inertia, which has been developed by Branson. Eurocode 2(EC2) suggests a procedure to evaluate deflection of reinforced concrete structure using moment-curvature relation. In this paper, a series of experiments were conducted on the singly reinforced concrete beams which have the same reinforcement ratio and different concrete strength. Therefore, the effect of the concrete strength on the deflection of the beams was analysed. The deflections obtained from the experiment were compared with the deflections calculated with ACI code and EC2.

  • PDF

DEVELOPMENT OF LEGALITY SYSTEM FOR BUILDING ADMINISTRATION PERMISSION SERVICE BASED ON BIM

  • Inhan Kim;Jungsik Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.593-600
    • /
    • 2009
  • In Korea, the government has developed SEUMTER, an administration system for building related public service, to facilitate and promote the electronic submission and permission activities. SEUMTER is progressing legality system based on 2D drawing for building administration permission service. However, there are a lot of problems related to legality system owing to complexity of Korea regulation relation and structure, inefficiency of legality system based on 2D drawing, duplication examination of document (soliciting forms for civil affairs) and drawing. Therefore, the purpose of this study is to develop legality system for building administration permission service based on BIM in Korea. To achieve this purpose, the authors have investigated permission procedure and regulation structure that is used in current building administration permission and suggested permission procedure and regulation structure for legality system based on BIM. In addition, the authors have investigated element technologies (for examples, method of structured regulation, BIM model checker, Viewer, etc) for legality system based on BIM. Finally, the authors have suggested strategy and hereafter direction for application of legality system based on BIM.

  • PDF

A Case Study of Asphalt Pavement Construction Quality Assurance Using the Quality Related Specification Software

  • Jeong, M. Myung;Jung, Younghan
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.3
    • /
    • pp.14-21
    • /
    • 2016
  • One of the major issues in the material-based or acceptance quality characteristics asphalt pavement Quality Assurance (QA) is that the method does not have rationality to link between the individual materials and the projected performance of the pavement. A new asphalt mix QA method has been recently developed under a national research project using the probabilistic Performance Related Specification (PRS). This advanced PRS QA methodology integrates the AASHTOWare Pavement ME Design$^{(R)}$ technology with the simple performance test concept that bridges the material characteristics with the pavement performance. This paper presents a case study of asphalt pavement performance using the developed PRS QA computer program, named Quality Related Specification Software (QRSS), with an actual pavement project, to demonstrate the developed PRS procedure and to assess the robustness of QRSS in terms of the rationality of the distress predictions. The results of this limited case study show that the new PRS QA method reasonably predicts the pavement performance, properly applied the probabilistic methods, and produced rational pay adjustment.

Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

CONSTRUCTION PRICE FORMATION: A THEORETICAL FRAMEWORK

  • Alexander Soo;Bee Lan Oo
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.241-248
    • /
    • 2011
  • Past theories on construction price formation have been shown to be inadequate in terms of their ability to represent real-life industry practice and price formation predictability. In this paper, we develop a theoretical framework on construction price formation that integrates four theories within the domains of marketing, learning, resource management and economics. These are: (i) marketing pricing theory; (ii) experiential and organisational learning theory; (iii) resourced based theory and (iv) microeconomic theory. Utilising pricing theory from marketing, a foundation is able to be created for the procedure of construction price formation, namely: (i) identifying the objectives; (ii) assessing the tendering environment; and (iii) formation of the price. However, understanding contractors' decision making process in tender pricing as such can be attributed to theories of experiential learning and consequently organisational learning. It is argued that contractors do learn from past experience and history and are able to adapt to different market conditions. In formation of the price, neoclassical microeconomics is able to provide additional insight in terms of the supply and demand model and consideration of the market conditions. Interrelated with the microeconomic concept of scarcity, we appreciate that contractors do have limited resources that affect their tender pricing decisions and resource based theory is used to substantiate this. Integrating the various theories as a unity allows the broader reality to be visualised and add to our theoretical understanding of construction price formation.

  • PDF

A Study on Procedures and Methods for Evaluating VE Alternatives at Design Phase in Construction Projects (설계VE 제안평가 절차 및 방법에 관한 연구)

  • Choi, In-Su;Hyun, Chang-Taek;Hong, Tae-Hoon;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.129-138
    • /
    • 2009
  • The role and importance of VE have been enlarged since VE application was mandatory by law in public sector in March, 2000. Public organizations have widened the technological horizon through VE competitions and applied VE technique to private investment projects. Many studies have been carried out on function analysis and VE procedure. In practice it is common that clients make a decision one-sidedly on whether or not VE proposals are selected. The VE procedure itself is not smooth. This study gives some suggestions on VE appraisal procedure and criteria at the last phase on VE process in order to smooth the progress of VE. The results of this study can be used as a tool to improve efficiency in the management of VE.

A Case Study of the Construction Project Management Applied to New Catholic Medical Center Construction Project ('가톨릭중앙의료원 새병원 및 성의회관 건립공사'CM수행사례 소개)

  • Kim, Hyo-Seong;Park, Young-Soon;Kim, Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.37-44
    • /
    • 2006
  • The construction management has been applied for the first time in South Korea on the New Catholic Medical Center. The construction of the project has been controlled and managed by the CMr, as Client's agent from the very beginning stage of construction when the block plan is being established by the Contractor's design consultant. As CMr generally gets involved in the project throughout the entire construction phases on behalf of the Client, Parsons Brinckerhoff has been delivering high quality solutions that satisfy the Client's requirements in Pre-construction stage and also brought practical and innovative engineering solutions in a time and cost effective method. The objective of this case study is to describe works executed by CMr in Pre-construction stage ; and, analyze the positive effects by applying CM to the project. Therefore, it is anticipated that CM procedure might be introduced and adapted to the up-coming hospital construction projects.

  • PDF