• Title/Summary/Keyword: Construction graphical simulation

Search Result 16, Processing Time 0.023 seconds

Visualizing Construction Process Linking Process Simulation (프로세스 시뮬레이션을 연계한 건설공정 시각화)

  • Kim, Yeong-Hwan;Jung, Pyung-Ki;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.73-79
    • /
    • 2006
  • Even though graphical simulation is very useful for construction planning, the application of graphical simulation has a limitation in dealing with objects without fixed form like earthmoving process. In this case, the mathematical/statistical simulation about the productivity of the whole processes based on the numerical data of working time, waiting time and working capacity of using equipment becomes effective. The mathematical/statistical simulation is not fully utilized in the field of construction due to the difficulties of creating process models and securing trust the numerically expressed results of simulation. In this research, the output of discrete-event simulation programs which are the most common mathematical/statistical simulation tool for construction processes were analyzed for the purpose of earthmoving process visualization. The purpose of this research is to develop a graphical simulation system that can help the construction planner select most suitable equipment and construction methods through the visualize the numerical simulation results of the working time, the queuing time as well as the amount resources etc.

Physical Modeling for Enhancement of the Functionality of Construction Graphical Simulation System (건설 그래픽 시뮬레이션 시스템의 기능 개선을 위한 물리적 모델링)

  • Kim, Yeong-Hwan;Jung, Pyung-Ki;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.80-88
    • /
    • 2006
  • Construction graphical simulations usually do not reflect physical properties of construction equipment and material because there are restricted to the geometric model. The complete description of construction operations is difficult for graphical simulation without a physical modeling. The object of this research is to enhance the functionality of restricted simulation system to geometric model. And research is conducted to overcome the limitation of current construction graphical simulation system through the connection geometric model and physical model with the physical properties of construction equipment and material such as crane's cable oscillation. The motion equations for the oscillation of crane cable as a result of the trolley's movement and the boom's rotation were derived. The equations were solved through numerical analysis and the results were simulated visually. The realistic description with physical modeling of construction operations will contribute for ensuring preliminary against risks and improving constructability as well as the application of various fields.

3-D Graphical Model-Based Design and Control of Automated Equipment (3차원 그래픽 모델에 근거한 자동화 장비의 설계 및 조종)

  • Seo Jongwon;Haas Carl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.188-191
    • /
    • 2002
  • This paper concerns 3-D graphical modeling and simulation techniques for design and control of automated equipment for construction and facility maintenance. A case study on the use of 3-D graphics techniques for developing a power plant maintenance robot is presented. By simulating equipment operation within the 3-D geometry models of the work environment the environment design was improved. The 3-D graphical models of the equipment and the work environment were further utilized for the control of the robot from a remote distance. By presenting the real-time updated equipment configuration and the work environment to the operator, the graphical model-based equipment control system helped the operator overcome the problems associated with spatial perception. The collision between the robot and the plant structures was also avoided based the real-time analysis of the dynamically updated graphical models.

  • PDF

Study on the Enhancement of the Functionality of Construction Graphical Simulation System (건설 그래픽 시뮬레이션 시스템의 기능개선에 관한 연구)

  • Kim Yeong-Hwan;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.543-547
    • /
    • 2004
  • Visualization of construction process simulation and physical modeling were considered to overcome the limitations of current graphical simulation. The output of discrete-event simulation programs which are the most common mathematical statistical simulation tool for construction processes were analyzed for the visualization of earthmoving process that dealing with objects without fixed. Object-oriented models for equipment, material and work environments were devised to effectively visualize the numerical simulation results of the working time, the queuing time as well as the amount resources etc. The oscillation of the crane's cable and the lifted material that should be considered to rationally modeled and simulated by construction graphical simulation. The derived equation of motion was solved by numerical analysis procedure. Then obtained results was used for physical modeling.

  • PDF

RAPID GEOMETRIC 3D MODELING FOR AUTOMATED CONSTRUCTION EQUIPMENT

  • Jo, Yong-Gwon;Hass, Carl T.
    • Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.55-60
    • /
    • 2003
  • Unstructured workspaces which are typical in construction contain unpredicable activities as well as changing environments. Most automated and semi-automated construction tasks require real-time information about the local workspace in the form of 3D geometric models. This paper describes and demonstrates a new rapid, local area geometric data extraction and 3D visualization method for unstructured construction workspaces that combines human perception, simple sensors, and descriptive CAD models. The rapid approach will be useful in construction in construction in order to optimize automated equipment tasks and to significantly improve safety and a remote operator's spatial perception of the workspace.

Attribute Data Management for Developing the Database of a 3D Earthwork BIM System (3D 토공 BIM 시스템 데이터베이스 구축을 위한 속성 데이터 관리)

  • Moon, Sungwoo;Seo, Jongwon
    • Journal of KIBIM
    • /
    • v.6 no.4
    • /
    • pp.27-34
    • /
    • 2016
  • A Building Information Model (BIM) is an attempt to simulate the process of building structures in a three-dimensional (3D) digital space. While the technology is usually applied to structured buildings, bridges, and underground facilities, it is rarely applied to an unstructured environment of earthwork operations. If a BIM is used for earthworks, the 3D simulation can be used for construction equipment guidance and earthwork management. This paper presents a real-time, 3D earthwork BIM that provides a 3D graphical simulation of excavators in conjunction with geographic modeling. Developing a real-time, 3D earthwork BIM requires handling a variety of factors, such as geographical information and vehicular movement. This paper mainly focuses on the management of these attributes and provides a database design for storing and retrieving data. In an example application, a prototype of the 3D earthwork BIM is presented to understand what it would provide when used during earthwork operations at a construction site.

QL2-XP Model for the Automatic Calibration in Water Quality Modeling (하천 수질 매개변수의 자동보정을 위한 QL2-XP 모형 개발)

  • Han, Kun-Yeun;Park, Kyung-Ok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.474-477
    • /
    • 2005
  • The Industrial development and the Increase in population have brought out a rapid increase of wastewater discharge. To deal with this matter, much estimate has been spend on construction and management of a large scale sewage treatment plant. Although every effort has been carried out, river water quality has no significantly improved. Especially. the aggravation of the water quality in dry season is brought out a serious social problem. The purpose of this study Is the development of an optimal water quality management technique considering the efficient control of the multiple pollutant load associated with the total pollutant load control. A GUI(Graphical User Interface) system named 'QL2-XP' model is developed by object-oriencted language for the user convenience and practical usage. Suggested GUI system consist of hydraulic analysis. water quality analysis, optimized model calibration processes, and postprocessing the simulation results.

  • PDF

Remote Monitoring System for a Building Cleaning Mobile Robot (빌딩청소용 이동로봇을 위한 원격 모니터링 시스템)

  • Yi, Soo-Yeong;Cho, Won-Ho;Choi, Byoung-Wook
    • The Journal of Korea Robotics Society
    • /
    • v.4 no.1
    • /
    • pp.74-80
    • /
    • 2009
  • This paper presents a remote monitoring and simulation system for a building cleaning mobile robot. It provides a tool of convenient 3D graphical map construction including network camera image viewer and status information of the robot. The 3D map is reconstructed from existing 2D building CAD data with DXF format using OpenGL graphic API. Through this system, it is possible to monitor and control the cleaning mobile robot from remote place. A practical experiment is performed to show the reliability and convenience of the monitoring system. The proposed system is expected to give efficient way of control and monitoring to building cleaning mobile robot.

  • PDF

LQ Control of Inverted Pendulum Using Hydraulic (유압을 이용한 도립진자의 LQ제어)

  • Jung, S.W.;Huh, J.Y.;Rhee, I.S.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.8 no.2
    • /
    • pp.1-7
    • /
    • 2011
  • An inverted pendulum mounted on a cart and actuated by a hydraulic servo cylinder was designed and built. Position information of the cart was acquired via a potentiometer and a angle of the pendulum was sensed by an incremental encoder. These were collected by a DAQ board and processed through the Real-Time Windows Target software(included in simulink). A simulink graphical program was implemented as a controller of the hydraulic system that governed the motion of the cart in order to maintain vertical balance of the inverted pendulum. The purpose of this study is to develop an electro-hydraulic inverted pendulum system for a modeling and controling the intrinsic unstable system. The simulation results were compared with the experimental and verified.

Graphic User Interface System for a Building Cleaning Robot (빌딩청소로봇을 위한 그래픽 사용자 인터페이스 시스템)

  • Jo, Won-Ho;Yi, Soo-Yeong;Choi, Byoung-Wook
    • The Journal of Korea Robotics Society
    • /
    • v.5 no.3
    • /
    • pp.209-215
    • /
    • 2010
  • This paper presents a graphic user interface system consisting of graphic simulator and remote control system for a building cleaning robot. It provides a tool of convenient 3D graphical map construction for real world. The 3D map is reconstructed from existing 2D building CAD data with DXF format by using OpenGL graphic API. Through this system, graphic display of robot's status information, remote control and cleaning scheduling can be done for a building cleaning robot. This proposed system is expected to give efficient way of graphic simulation and remote monitoring and control system for a building cleaning robot.