Attribute Data Management for Developing the Database of a 3D Earthwork BIM System  

Moon, Sungwoo (부산대학교 사회환경시스템공학과)
Seo, Jongwon (한양대학교 건설환경공학과)
Publication Information
Journal of KIBIM / v.6, no.4, 2016 , pp. 27-34 More about this Journal
Abstract
A Building Information Model (BIM) is an attempt to simulate the process of building structures in a three-dimensional (3D) digital space. While the technology is usually applied to structured buildings, bridges, and underground facilities, it is rarely applied to an unstructured environment of earthwork operations. If a BIM is used for earthworks, the 3D simulation can be used for construction equipment guidance and earthwork management. This paper presents a real-time, 3D earthwork BIM that provides a 3D graphical simulation of excavators in conjunction with geographic modeling. Developing a real-time, 3D earthwork BIM requires handling a variety of factors, such as geographical information and vehicular movement. This paper mainly focuses on the management of these attributes and provides a database design for storing and retrieving data. In an example application, a prototype of the 3D earthwork BIM is presented to understand what it would provide when used during earthwork operations at a construction site.
Keywords
Construction equipment; BIM; 3D earthwork BIM; earthwork construction; ground terrain modeling; equipment modeling;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Jo, J. J., Ju, Y. D., Kim, S. M., and Seo, H. J. (2012). Applications and Future Study of Earthwork BIM, Proceedings of Korea Institute of Building Information Modeling, pp. 71-72.
2 Kim, M. J., Lee, K. H., Kwon, S. H., P, S. I., and Lee, S. C. (2014). BIM Application Case Study of Civil Infrastructure Industry, Proceedings of The Korean Society for Railway.
3 Kim, Y. H. (2011). BIM for the Public Infrastructure Facilities, KIBIM Magazine, pp. 27-30.
4 Laica-Geosystems. iCON iXE3-3D System, http://leicageosystems.com/products/machine-control-systems/excavator/leica-icon-ixe3---3d-system, (Jul. 5, 2016).
5 Prolec. Machine control: ProGrade, http://www.prolec.co.uk/en/what-we-do/products/prograde, (Jul. 5, 2016).
6 Regan, A., Mahmassani, H. and Jaillet, P. (2014). Evaluation of Dynamic Fleet Management Systems: Simulation Framework, Journal of the Transportation Research Board (1645), Transportation Research Board of the National Academies, Washington, D.C., DOI: 10.3141/1645-22.   DOI
7 Sabahi, P. (2012). Speeding Up the Process of Modeling Temporary Structures in a Building Information Model Using Predefined Families, Master's thesis, Texas A&M, College Station, TX.
8 Azhar, S. (2011). Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry, Leadership and Management in Engineering, 11(3), pp. 241-252.   DOI
9 Dakhil, A. and Alshawi, M. (2014). Building Information Modelling Benefits-Maturity Relationship from Client Perspective, Information and Knowledge Management, 4(9), pp. 8-16.
10 Trimble. Grade control for excavators, http://construction.trimble.com/products/machine-control/grade-control-for-excavators, (Jul. 5, 2016).
11 TopCon. Mass excavation, http://www.topconpositioning.com/construction/mass-excavation, (Jul. 5, 2016).