Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.146-156
/
2013
Recently, to reflect the various needs of customers in the apartment field, the customized apartment has emerged. From the point of the customer, customized apartments have the definite advantage of being able to guarantee more customer options. On the other hand, from the point of the project manager, there are significant risk factors, with increase of management factors, construction delays, etc. The reasons for this are, to date, the insufficient systematic analysis of the project, and the lack of experience of similar projects. This study provides the waste factors of each phase in a customized apartment project. A survey and interview are conducted to achieve the waste factors using MUDA methodology; a process of the project was analyzed; and a factor of each process was identified. Also, AHP(Analytic Hierarchy Process) are used, to evaluate the waste factors in project stages. The AHP results show that "Design change" and "Inappropriate intervention in construction process" ranked highly in the waste factors. The results of our research will provide a countermeasure that addresses waste factors in similar projects, and contributes to reducing the extra cost and time in new projects.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.12
/
pp.669-676
/
2018
Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.
One of the construction methods applied as a pier foundation type is a single type cast-in-place pile. In applying a pile bent system as a foundation type, the main concern in designing can be said to secure the lateral bearing capacity of pile structure in system. In addition, to increase the rigidity of the pile structure, a method of increasing the lateral bearing capacity by reinforcing the pile structure with a casing has been used. However, although the reinforcing effect and appropriate reinforcing length of casing may vary depending on the soil conditions, there is insufficient studies on this, and for this reason, the entire pile structure in a pile bent system is reinforced with a casing, in the field. In addition, if the length of the entire pile is reinforced with a casing, it may lead to delays in construction and increase in construction costs. That is, in order to more effectively reinforce the pile structure with a casing, it is necessary to study the lateral bearing characteristics of the reinforced pile structure in system. And it should be determined the appropriate reinforcing length of the casing from the evaluated bearing characteristics. Therefore, in this study, the lateral bearing characteristics of piles applied with the reinforcing length of casing for each condition were evaluated through a numerical analysis. And, based on the analysis results, the appropriate reinforcing length of casing was proposed. As a result of the study, it was found that in order to effectively increase the lateral bearing capacity of pile structure, the reinforcing length of casing should be applied twice the influence range of the bending behavior of the pile, 1/β.
Jinmyeong Lee;Hong-Sun Park;Chan-Woo Kim;Bong Gu Kang
Journal of the Korea Society for Simulation
/
v.33
no.2
/
pp.1-11
/
2024
A cyber-physical system is a technology that connects the physical systems of a manufacturing environment with a cyber space to enable simulation. One of the major challenges in this technology is the seamless communication between these two environments. In complex manufacturing processes, it is crucial to adapt to various protocols of manufacturing equipment and ensure the transmission and reception of a large volume of data without delays or errors. In this study, we propose a method for constructing agent models for real-time simulation-capable cyberphysical systems. To achieve this, we design data collection units as independent agent models and effectively integrate them with existing simulation tools to develop the overall system architecture. To validate the proposed structure and ensure reliability, we conducted empirical testing by integrating various equipment from a real-world smart microfactory system to assess the data collection capabilities. The experiments involved testing data delay and data gaps related to data collection cycles. As a result, the proposed approach demonstrates flexibility by enabling the application of various internal data collection methods and accommodating different data formats and communication protocols for various equipment with relatively low communication delays. Consequently, it is expected that this approach will promote innovation in the manufacturing industry, enhance production line efficiency, and contribute to cost savings in maintenance.
Korean Journal of Construction Engineering and Management
/
v.18
no.6
/
pp.65-77
/
2017
Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.
Journal of the Korea institute for structural maintenance and inspection
/
v.22
no.1
/
pp.64-71
/
2018
Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.
Compensation services that are indispensable during large-scale public utilities projects have been gradually increasing with the recent increase in construction, but there are no systematic compensation services due to the complicated procedures and manual work. For this reason, various problems such as construction period delays due to various complaints, corruption in compensation work, and impossible to trace the history of compensation data in the past are emerging. In this paper, in order to solve this problem, in-depth interviews and questionnaires were conducted to find out the problems of each compensation status. Based on this, 3 core technologies and 10 technical needs based on ICT were selected to improve the compensation work by deriving STEEP analysis and Issue Tree. The three core technologies are big data-based decision-making and prediction technology, advanced measurement technology, and open cloud-based compensation platform technology. In order to introduce the derived technologies to the institutions in charge of compensation, the possibility of technology diffusion by project operators was suggested based on the results of the current status of informatization by institution. Based on the core technology derived from this paper, it is necessary to make a prototype that can be advanced in compensation work and apply it to each institution and analyze the effect.
Korean Journal of Construction Engineering and Management
/
v.19
no.5
/
pp.22-31
/
2018
Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.
Installation of pedestrian scramble is recently increasing due to pedestrian-oriented transportation policies issued in local governments. Pedestrian scramble is able to emphasize safety issues by reducing conflicts between pedestrians and vehicles when an exclusive pedestrian phase is employed. In spite of its positive property, pedestrian scramble has several negative points: an increase of a cycle length, a decrease of green time ratio, and an increase of total delay. This study delivers the impacts of pedestrian scrambles in terms of pedestrian convenience and traffic mobility. Authors analyzed the changes of traffic delays by comparing the installation and no installation of pedestrian scramble at an intersection by varying several variables: signal timings, traffic volumes, the number of lanes, and the number of pedestrian conflicts. The paper presents an analysis procedure as a guideline that assists practitioners in selection of appropriate intersections at where pedestrian scrambles are implemented.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.33
no.1
/
pp.53-62
/
2015
The water vapor including latent heat is the important component in an atmospheric circulation and in a monitoring of the Earth's climate changes, as well as in the weather forecast improvement. In this study, to establish the Algerian weighted mean temperature model, a linear regression method had been developed under 5 radiosonde observations for a total 24,694 profiles from 2004 to 2013. An weighted mean temperature is a key parameter in the processing of PWV from GNSS tropospheric delays. The result from the study has expected to provide an useful model to demonstrate the realization and utility of using the ground-based GNSS meteorology technique that will bring improvements in weather forecasting, climate monitoring in Algeria.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.