• Title/Summary/Keyword: Construction defects

Search Result 441, Processing Time 0.023 seconds

The Management Method for Preventing Frequent Defect about Each Inspection Part from The Data Analysis of Pre-qualification of Residential Building Reconstruction (주택 재건축 예비평가 자료분석을 통한 분야별 주요결함의 예방·조치방안)

  • Kim, chun hag;Bae, cheol hak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.181-186
    • /
    • 2008
  • The purpose of this study is analyzing the frequent defect about each inspection part of Pre-qualification of residential building reconstruction and finding the cause of occurrence so that can supply a solution of the problem during the plalnning and constructure. The frequent defects are naturally following the deterioration and more occur in the structure body than a skin. The meaning that supply the cause and the managing method for preventing frequent defects about each inspection part is as follows. To prevent the defects, it is needed that the choice of the appropriate materials, giving a sufficient space for facilities, reliable constructure for the part of expecting the defects. The quality of life will go up due to making a good dwelling environment and extending the life cycle of structures from the inspection and managing the part of expecting defects.

  • PDF

Statistical Analysis on the Correlation Between tile Defects in Apartment Houses and Environmental Factors (공동주택 내 타일 하자와 환경적 요인의 연관성에 대한 통계분석)

  • Pyeon, Su-Jeong;Kim, Gyu-Yong;Choe, Gyeong-Cheol;Lee, Sang-Soo;Lee, Yea-chan;Nam, Jeong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.56-57
    • /
    • 2021
  • Apartments, an intensive residential type, exist and are supplied in large quantities regardless of the size of the city. The value of an apartment is affected not only by the surrounding infrastructure, but also in terms of maintenance. Defects that occur in apartments come in various forms, and mainly poor finishing accounts for 60% of the defects. Among them, tile defects accounted for a large proportion and were found to be caused by several factors. This paper analyzed the influence of each factor considering the coefficient of thermal expansion affecting tile defects according to the domestic seasonal climate.

  • PDF

A Study on Relationship between Construction Manpower Management and Defect Occurrence - Empirical Analysis Using Financial Data - (공사인력관리와 하자발생 사이의 관련성에 관한 연구 - 재무적 자료을 이용한 실증분석 -)

  • Park, Hong-Jo;An, Sung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.263-264
    • /
    • 2021
  • The purpose of this study is to empirically confirm the effect of the characteristics of construction workers on the occurrence of defects in construction. In this study, the degree of direct construction is measured through the ratio of the direct recruitment and outsourcing manpower of the original contractor, and the effect of this on the occurrence of defects is empirically analyzed using financial data. In addition, it is verified whether the degree of defect occurrence varies depending on the job skill level of the direct hired personnel inputted to the construction. Through this, it will be possible to prepare an argument for revitalizing the direct construction of construction companies and an opportunity to promote it.

  • PDF

Performance of Soil-Bentonite Cutoff Wall considering Defects and Formation of Bentonite Cake

  • Nguyen, The Bao;Lee, Chul-Ho;Lim, Jee-Hee;Jeoung, Jae-Hyeung;Choi, Hang-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1264-1273
    • /
    • 2010
  • Soil-bentonite cutoff walls are widely recognized to be the effective barrier for containment of wastes and groundwater. Bentonite cake is usually found remaining on the trench surface due to the use of bentonite slurry during the excavation for the cutoff wall construction. Defects also inevitably take place due to the inappropriate construction procedures or improperly mixed soil-bentonite backfill. The defects include insufficient keys and windows in the soilbentonite cutoff wall. In this study, the performance of the soil-bentonite cutoff wall is evaluated based on the flow rates through the wall. Three-dimensional numerical models were applied to simulate the groundwater flow through the soil-bentonite cutoff walls of typical geometries with consideration of the defects and bentonite cake. Results of the simulations showed that the bentonite cake has no effect in the insufficient key cases. In the keyed wall cases, the bentonite cake with very low hydraulic conductivity significantly impedes the flow of groundwater through the wall. The presence of the bentonite cake not only compromises the window defect but also renders the wall construction more effective in blocking the groundwater flow. These findings show the significance of the bentonite cake in a soil-bentonite cutoff wall construction.

  • PDF

A Study on the Improvement Plan through Analyzing the Perception of Expert Group about Landscape Construction Defects (조경공사 하자에 관한 전문가 집단간 인식분석을 통한 개선방안 연구)

  • Lee, Sang-Suk;Yu, Joo-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.104-113
    • /
    • 2012
  • This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.

Study on the Defects of Finishing Works of Apartment Houses during Warranty Liability Period and its Correlation (공동주택 마감공사의 하자보수기간 현황 및 연관성 연구)

  • Lee, Ung-Kyun;Seo, Deok-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.385-391
    • /
    • 2017
  • The warranty liability period for defects in apartment buildings by work type is not based on scientific analysis, making the appropriateness of the term a culprit behind the lawsuits. Therefore, this research aims to evaluate the appropriateness of the warranty liability term of apartment buildings by identifying the current status of defects, in particular, caused by finishing works. That is because the number of defects, caused during the finishing works, accounted for the largest portion of the total defect cases of apartment buildings reported to the Apartment Defect Dispute Mediation Committee under the Ministry of Land, Infrastructure, and Transport of Korea between 2010 and 2011. The result from analyzing claims for defect repairs of the finishing works showed that most cases by work type continued to be made after two years, and only about 60% were charged within the warranty period. And, defects by work type have correlation, which needs to be considered for a better construction technique. Considering a low correlation between the possibility of defects and the construction performance rankings, which are highly relevant to the apartment preference. It is believed that there needs to be a qualification process for agencies that actually performs finishing works.

Correlation between Building Facade Elements and Defects through "Pixelization Method" (픽셀화기법을 통한 건축물 외벽의 하자와 입면 구성 요소 간의 관계 분석)

  • Kim, Wooram;Jeon, Yongdeok;Shin, Jeongran;Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.40-48
    • /
    • 2016
  • The construction industry has been made diversified on the design process depending on qualitative growth of customers' demands. But this approach has lead to problems such as falling of building values due to lack of awareness of defects caused by long term utilization. So, the relationship on the characteristics of buildings and defects should be clearly analyzed to prevent falling of building values. This study, therefore, proposed a technique to quantify the relationship between building facade elements and defects. The technique was developed by applying pixel concept to the outside of the buildings. It has a feature to determine the clear relationship by presenting quantitative data that have been recognized qualitatively. The proposed technique is referred to "Pixelization Method". It separates building facade into unit compartment and makes database by assigning a code depending on the characteristics. Through the method, this study is expected to create a foundation for the quantitative analysis of relationship between building facade elements and defects as a basis on active responding to the defects.

Analysis on Defect Disputes in Housing & Interior Design from Consumers' Perspective and Interior Design Service Evaluation (소비자 관점에서 본 주택 및 인테리어 하자 실태 분석 및 인테리어 서비스 평가)

  • Lee, So Young;Jun, Gyung Min
    • Journal of the Korean housing association
    • /
    • v.27 no.5
    • /
    • pp.65-72
    • /
    • 2016
  • The purpose of the study was to investigate defect cases in residential interior design, to identify the state of defects, and to categorize types of defect and disputes. In addition, consumer appraisal to residential interior design service were analyzed. The results of this study could provide fundamental information regarding the defects and claims in residential interior design. First, we did literature review for defect disputes in architectural design and interior design. We identify the definition of defects by building life cycle, by state of construction, by activity, and by design performance. Second, we analysed interior design defects cases reported in Korea Consumer Agency & Ministry of Land, Infrastructure and Transport. A total of 49 cases of defect disputes in residential interior design from 2000 to 2015 were investigated. As a result, many defects appeared during the construction stage. A majority of defects cases fall into insulation, water-proofing/leakage work. In terms of design aspects claim, functional and aesthetic defects were claimed. Third, from Consumer Market Evaluation Indicators, raw data from 500 respondents were investigated for the housing repair and interior design. It is found that information comparability, responsiveness to consumer claim, price, and safety are important factors for consumer satisfaction in interior design.

An Inspection System for Multilayer Co-Extrusion Blown Plastic Film Line (공압출 다층 플라스틱 필름 라인을 위한 결함 검사 시스템)

  • Hahn, Jong Woo;Mahmood, Muhammad Tariq;Choi, Young Kyu
    • Journal of the Semiconductor & Display Technology
    • /
    • v.11 no.2
    • /
    • pp.45-51
    • /
    • 2012
  • Multilayer co-extrusion blown film construction is a popular technique for producing plastic films for various packaging industries. Automated detection of defective films can improve the quality of film production process. In this paper, we propose a film inspection system that can detect and classify film defects robustly. In our system, first, film images are acquired through a high speed line-scan camera under an appropriate lighting system. In order to detect and classify film defects, an inspection algorithm is developed. The algorithm divides the typical film defects into two groups: intensity-based and texture-based. Intensity-based defects are classified based on geometric features. Whereas, to classify texture-based defects, a texture analysis technique based on local binary pattern (LBP) is adopted. Experimental results revealed that our film inspection system is effective in detecting and classifying defects for the multilayer co-extrusion blown film construction line.

Basic Research on Evaluation of Defect Repair Period of Finishing Works in Apartment Houses according to Performance Data (실적자료에 의한 공동주택 마감공사의 하자보수기간의 적절성 평가 기초연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.245-246
    • /
    • 2015
  • Cases of lawsuit and conflict are increasing because of defects in apartments in use after the completion of construction. Further, with changes in the consciousness of residents and in the social environment, many residents are showing interest in defect-related lawsuits. However, the term of warranty liability defined in the current law is not practically appropriate, and the verification of the determination of the term of warranty liability is insufficient. Against this background, this research aims to evaluate the appropriateness of defect repair periods by examining the actual defect condition of the finishing work among the various defects related to apartments. Collected performance data are analyzed by statistical techniques by considering the defect occurrence rate per construction type and the construction year of the finishing work in apartment construction. The analysis results will be used as basic data for evaluating the appropriateness of the standards for the term finishing works warranty liability.

  • PDF