AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Stability of Construction Cost-variability Factor Rankings from Professionals' Perspective: Evidence from Dar es Salaam -Tanzania

  • Shabani, Neema;Mselle, Justine;Sanga, Samwel Alananga;Kanuti, Arbogasti Isidori
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.2
    • /
    • pp.17-33
    • /
    • 2018
  • This study investigates the stability of professionals' cost variability factor-rankings across different levels of cost-variability and response scenarios. Descriptive statistics are used to examine the stability of factor-ranking for 20 cost variability factors and a Multinomial Logistic (MNL) regression model was implemented to examine the stability of cost variability factors across three cost variability levels. The finding on the descriptive statistics indicated that professionals' factors-rankings are stable only for external factors. The MNL regression results on factor-stability suggested that 8 out of the 20 evaluated factors were unstable determinant of lower cost variability levels. These factors are "risk associated with the project", "personal bias and poor professionalism of the estimators", "limited time available to complete the project", "lack of skills and experience by estimator" "geographical location of projects", "incomplete & rush designs for estimate", "unforeseen or unexpected site constraints", "high class bidders for the contractors". Similarly lack of experience and large size projects were observed to be unstable as well. These observations suggest that professionals' view on pre-tender cost variability factor-ranking yields unstable factor rankings hence should not be relied upon as the only mechanisms to mitigate cost related risks in construction projects.

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.

  • PDF

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.

A Study Of the Construction Management Applied to BAT Korea Factory Construction Project in Korea (BAT Korea Factory 건설 프로젝트의 CM 적용사례 연구 - Cost Management 사례를 중심으로 -)

  • Kim Duk-Kon;Kwon O-Kyung;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.48-57
    • /
    • 2003
  • BAT Korea's Factory is the one of the major projects that clearly confirms and demonstrates that Construction Management (CM), provided by a Korean CM Company to the foreign clients, enables them to successfully complete projects; with savings in time and reduction in cost, which it is $15\%$ lower than the cost of the overseas construction. Also, throughout the thorough schedule management, it was possible to commence with manufacturing one month after the completion date. The Key Success Factors was generated by the excellent construction management skills, and more importantly by the confidence gained by the client in giving a CM company full authority for the construction management of the project. This study has focus on elements of construction management applied to this project throughout the concept of 'One Stop Shop', including cost managements, contract management and value engineering etc. We hope that this study will provide useful data to enable public clients to take advantages of construction management, in a similar way to. the private clients, who have already implemented CM actively.