건축공사 계약해지에 따른 비용산정에 관한 연구 (A Study on the Cost Estimation in Case of Termination in the Building Construction Contract)

  • 이호일;최인성
    • 한국건축시공학회지
    • /
    • 제3권2호
    • /
    • pp.95-102
    • /
    • 2003
  • Financial difficulties and claims frequently stop construction works and cause subsequent contract cancellations. However, as the criteria to assess costs have not been established, many cases of legal disputes over the assessment of cancellation costs are taking place and the concerned parties are suffering the loss of time and money. Therefore, the present research aimed at developing a rational and systematic model of cancellation cost assessment following the cancellation of contracts. The research was carried out in the following methods and scopes. 1 ) The research was focused on the assessment of fair cancellation costs from constructors' side for contracts cancelled by any causes for which the owners have liability. 2) To obtain basic materials about cancellation cost assessment methods, contracts, claims, contract cancellations and construction-related laws at home and abroad were examined. 3) A cost assessment model was developed for systematization and efficient operation of cancellation cost assessment, and the reliability and efficiency of the proposed model was verified through a case study. The conclusions drawn from the research are as follows. The importance of the cancellation cost assessment model was confirmed as, using the cancellation cost assessment model, direct cancellation cost and indirect cancellation cost could be assessed systematically, the number of disputable items could be reduced because reasonable evidences of actual spending were presented, and the loss of constructors could be minimized because systematic and rational cost assessment became possible for many disputable cases of indirect cancellation cost, which the constructors had been unable to prove so far though having spent.

공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구 (Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension)

  • 정기창;이재섭;박양호
    • 한국건설관리학회논문집
    • /
    • 제13권6호
    • /
    • pp.33-44
    • /
    • 2012
  • 본 연구는 공공공사 공기연장 시 발생하는 추가간접비의 지급개선방안에 관한 연구이다. 현장사례를 통해 공기연장 추가 간접비 미지급 원인을 분석한 결과 실비의 인정범위에 대한 다툼 및 증빙의 어려움이 있는 것으로 조사되었으며, 전문가 의견조사 실시결과 통계적 기준이 명확하다면 공기연장 추가간접비의 인정범위를 합의하는 '공기연장 사전합의 제도'를 실시할 수 있을 것으로 조사되었다. 따라서 본 연구는 다수의 현장 실비자료를 집계하여 공사프로젝트의 공종별, 공사금액별, 공사기간별 측면에서 산정하였다. 산정한 결과 공종 및 공사기간별 요인은 공사기간연장 추가간접비 발생금액에 직접적 영향을 미치는 것으로 볼 수 없으나 도급계약금액요인에 따라서는 직접적 연관성이 있는 것으로 나타났다. 이에 계약금액별 공사기간연장에 따른 추가비용인 '공기연장 표준추가간접비'를 제시하였으며, 공기연장비용 사전합의 제도를 시행하기 위한 제도적 개선방안을 제시하였다.

건설 현장에서 안전성 향상을 위한 지반진동.소음.비산먼지 측정자료의 분석에 관한 연구 -영남지역의 퇴적암.화성암층에서의 발파 및 항타작업을 중심으로- (A Study on Data Analysis of Ground Vibration.Noise Dust Dispersion Measurement for Enhancing Safety at the Construction Sites - Focussed on Blasting and Piling in Sedimentary and Igneous Rocks in the Youngnam Area -)

  • 안명석;류창하;박종남
    • 화약ㆍ발파
    • /
    • 제19권3호
    • /
    • pp.91-104
    • /
    • 2001
  • As in Korean environments with mountainous and hilly areas, the rock generally has to be removed in construction or civil engineering work in tunnelling or excavation for development in urban area. Explosives should be used for blasting, which may cause serious problems on local people for their claim for compensation due to ground vibration, noise. For safe and economic blasting, geology and engineering characteristics of rocks such as discontinuities of rock or weathering are very important factors, together with site characteristics for prediction of ground vibration. In this study, conducted were the detailed study for major rocks most widely distributed in the South-east area, in-situ geological survey, geological and geochemical analysis, and further laboratory uniaxial rock stress, seismic velocity of core samples together with in-situ seismic velocity measurements. Regulations on ground vibration and noise were reviewed for assessing their adaptabilities, and a total of 4,856 measured blasting vibration data were examined for enhancing the confidence level in estimating the predictive formulation using scaled distance statistically.

  • PDF

공동주택공사에서의 공기지연 리스크분석에 관한 연구 (A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects)

  • 김재욱;우광민;이학기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.217-221
    • /
    • 2003
  • 본 연구에서는 공동주택공사에서 발생하는 공기지연 리스크에 대한 분류체계와 분석방법을 제안하였다. 서울${\cdot}$경기 지역과 부산${\cdot}$경남 지역의 공동주택공사 현장을 중심으로 실무자 면담 및 설문조사를 실시하였고, 그 결과를 바탕으로 주요 광종 분류와 각 공종의 공기지연 리스크 수준과 지수를 산정하였다. 본 연구는 공동주택공사의 주요 공종인 토공사, 골조공사, 조적${\cdot}$미장공사, 창호${\cdot}$유리공사, 수장공사의 공기지연 리스크 요인의 리스크 수준, 지수 그리고 순위를 분석하여 공기지연 리스크 관리 시스템 구축을 위한 기초적인 자료를 제시하는 것을 목적으로 하였다.

  • PDF

사업장 규모별 업무상 근골격계질환 요양 실태와 영향 요인 (Analysis of the Factors Regarding Work-related Musculoskeletal Disease by Company Size)

  • 정성원;김경하;석민현;황라일
    • 한국보건간호학회지
    • /
    • 제28권3호
    • /
    • pp.522-535
    • /
    • 2014
  • Purpose: This study was constructed in order to examine factors that influence work-related musculoskeletal disease (WMSD) approvals and current status according to the company size. Method: This is a descriptive study that utilized Industrial Accident Compensation Claim Data. Workplaces with over 35,811 workers derived from the 2012 claim data, which comprised approximately 91.5%, were selected for this study. Then workplaces were divided into three groups according to the number of workers: less than 5, 5~299, and 300 and over. Results: Since 2008, the number of small sized workplaces has increased. The 2012 data showed that 32.5% of workers at small sized workplace had WMSD. However, workplaces with 5~299 workers showed WMSD approval rate of 60%. Of note most WMSD approved workers were employed by manufacturing and construction companies, regardless of the workplace size. Most of them were engaged in elementary tasks. The days of medical treatment at OPD and IPD were most prevalent among workers at the largest workplaces. Conclusions: It is certain from this study that WMSD has been polarized by the company size. More policy attention should be paid to the WMSD status of workers at small sized workplaces which usually do not have their own health office.

건설공사보험 피해 보상금 지급액을 활용한 리스크 분석 (Risk Analysis using Construction Insurance Claim Payouts)

  • 유영진;손기영;김지명
    • 한국건축시공학회지
    • /
    • 제16권4호
    • /
    • pp.349-357
    • /
    • 2016
  • 최근 건설프로젝트는 산업성장의 영향으로 대형화 복잡화 첨단화 되어 가며, 이로 인해 건설공사 리스크의 불확실 요소가 증가하고 있다. 이에 따라, 복잡해진 현대 건설 프로젝트에서 예측 및 대응할 수 없는 리스크 관리 방법에 관한 연구가 필요하다. 이에 본 연구는 A보험사의 클레임레코드를 토대로 실제 건설 공사 현장 내에 보상금 지급액 데이터를 수집하였으며, 사고원인 분석 및 회귀분석을 실시하였다. 사고원인 분석을 위해 본 연구에서는 공정률별, 계절별, 총공사금액별로 분류하고, 사고 빈도와 보상금 지급액으로 분석하여 리스크 중점관리요인을 도출하였다. 두 번째, 종속변수로 피해율을, 독립변수로 자연재해 위험도와 지리정보, 시공방법 및 능력, 프로젝트 규모로 분류하여 다중회귀분석을 실시하여, 총공사금액 대비 보상금 지급액에 대한 피해율 예측 모델을 개발하였다. 회귀분석 결과 45.5%의 설명력을 가진 피해율예측모델을 개발 및 검증하였다. 본 연구의 결과는 향후 건설 공사의 정량적인 리스크 분석 모델 개발 및 리스크 인자에 대한 검토를 위한 자료로 활용될 것이다.

확률론적 기법을 활용한 건설현장 외부 인명피해 정량화 모델 개발 (Quantification Model Development of Human Accidents on External Construction Site by Applying Probabilistic Method)

  • 하선근;김태희;손기영;김지명;손승현
    • 한국건축시공학회지
    • /
    • 제18권6호
    • /
    • pp.611-619
    • /
    • 2018
  • 현재까지의 건설 안전관리와 리스크에 관한 연구들은 건설현장 내부(근로자)에 한정되어 있어 건설현장 외부(제 3자)에 대한 연구는 미비한 실정이다. 그 결과, 건설현장 주변의 일반인들이 피해를 받고 있으며 산재 다발이라는 부정적인 이미지로 언론이나 일반 대중들에게 투영되고 있다. 일반 대중들에게 부정적인 이미지를 탈피하기 위해서는 건설현장 내부(공종, 건축물)에만 집중되어있는 기존의 안전관리가 아닌 건설 현장 외부(제 3자)에 대해서도 고려된 종합적 안전관리체계를 구축해야 한다. 이에 본 연구에서는 건설 현장 외부(제 3자)의 인명사고 리스크를 정량화하고 몬테카를로 시뮬레이션을 활용하여 리스크가 어떻게 변화할 것인지 예측하고자 한다. 이를 위하여 첫째, 선행연구를 고찰하여 불안전한 상태와 인명사고 발생형태를 정의한다. 둘째, 14년 간 건설현장 외부에서 발생한 제 3자 인명 손해배상액 데이터를 수집한다. 셋째, 수집된 데이터의 사고내용을 분석하여 사고 발생분석 모델을 설정한다. 넷째, 리스크 정량화 모델을 구축하고 불안전한 상태, 인명사고 발생형태별 사고발생확률과 손해배상액 확률분포를 제시한다. 마지막으로 몬테카를로 시뮬레이션을 통해 도출된 사고 형태별 분포결과를 분석한다. 본 연구의 결과는 향후 건설현장 내 외부 안전관리 체크리스트 개발 및 인명사고 예측 관리 시스템 개발의 참고 자료로 활용될 것으로 기대된다.

The Effect of Process/Result Distinction on the Grammaticalization of Verbs

  • Kim, Rhanghyeyun
    • 한국영어학회지:영어학
    • /
    • 제2권3호
    • /
    • pp.329-372
    • /
    • 2002
  • Tobin (1993) argues that verbs can be classified according to the process/result distinction. He further claims that the grammatical development of the lexical verbs into auxiliary/aspectual verbs is motivated by the distinction. In this paper, first, I reconsider Tobin's (1993) claim in the viewpoint of the principle of persistence (Hopper 1991) or the source determination hypothesis (Bybee, Perkins, and Pagliuca 1994), which states that the meaning of the source construction determines the path of grammaticalization. I then classified tense/aspect/ modality markers according to Tobin's (1993) process/result distinction. Finally, I argue that Tobin's (1993) process/result distinction constrains the distribution of grammaticalized verbs among tense/aspect/modality markers not only in English and but also in Korean.

  • PDF

Toward a Unified Constraint-Based Analysis of English Object Extraposition

  • Cho, Sae-Youn
    • 한국언어정보학회지:언어와정보
    • /
    • 제14권1호
    • /
    • pp.49-65
    • /
    • 2010
  • It has been widely accepted that English object extraposition can be easily accounted for. However, recent research exhibits the fact that various cases of English object extraposition lead to many empirical and theoretical problems in generative grammar. To account for such cases, the previous lexical constraint-based analyses including Kim & Sag (2006, 2007) and Kim (2008) attempt to give an explanation on the phenomenon. They, however, seem to be unsuccessful in providing an appropriate analysis of object extraposition, mainly due to the mistaken data generalizations. Unlike the previous analyses, we claim that all verbs selecting CP objects allow object extraposition and propose a unified constraint-based analysis for the various cases of the construction. Further, it is shown that as a consequence, this analysis of object extraposition can be naturally extended to subject extraposition. Hence, this unified analysis enables us to further suggest that all verbs selecting CP allow subject and object extraposition in English.

  • PDF

최대컷값을 최소화하는 k-way 분할 연구 (A Study on the K-way Partition Minimizing Maxcut)

  • 김경식;이철동;유영욱;전주식;황희융
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1988년도 전기.전자공학 학술대회 논문집
    • /
    • pp.557-560
    • /
    • 1988
  • In this paper, we present a new k-way partitioning algorithm for a graph of an electrical circuit wherein nodes and edges are regarded as cells (modules) and nets, respectively. In contrast to the previous work, our method is based upon a linearly ordered partition paradigm. We also claim that the maximum number of netcuts mostly governs the performance of k-way partitioning, thus having influence on the construction of a new cost function. In addition, our approach elaborates upon balancing the partition size. Our experiments show excellent results in comparison with previous k-way partitioning algorithms.