• 제목/요약/키워드: Construction background

검색결과 618건 처리시간 0.026초

도심지 NATM 터널에서의 계측관리시스템 적용 연구 (Application of the Measurements Control System to NATM Tunnel Constructed in Urban Area)

  • 장정범;김용일;김영근;정한중
    • 터널과지하공간
    • /
    • 제5권3호
    • /
    • pp.193-204
    • /
    • 1995
  • Since the significance of measurements during tunnel construction is not recognized, measurements have not been implemented except for a few very important construction site. As the tunnel construction by NATM increases, the importance of measurements is being emphasized. But, due to the lack of practical experiences and theoretical background in measurements techniques, systematic measurements control system has not yet been established. In this study a measurements control system, successfully used in the urban tunnel construction, is introduced.

  • PDF

Background Removing for Digital image self-adaptive acquisition in medical X-ray imaging

  • Li, Xun;Kim, Young-Ju;Song, Young-Jun
    • International Journal of Contents
    • /
    • 제4권1호
    • /
    • pp.12-15
    • /
    • 2008
  • In this paper, we propose a new method of background removing for digital self-adaptive acquisition in medical X-ray imaging. We analysis the construction of video digital acquisition system and main factors of acquired image quality, propose a more efficiency method to against background non-uniformly. With proposed method, non-uniform illumination back ground was well removed without image quality degradation.

Significant Progress in Construction Equipment of Super High-Rise Building

  • Zhang, Kun;Wang, Hui;Wang, Kaiqiang;Cui, Jian;Chen, Bo;Li, Di
    • 국제초고층학회논문집
    • /
    • 제7권3호
    • /
    • pp.243-253
    • /
    • 2018
  • The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.

백제(百濟) 혼축기단(混築基壇)의 연구(硏究) (A Study on Mixed Construction of Platform of Baikje)

  • 조원창
    • 건축역사연구
    • /
    • 제15권2호
    • /
    • pp.77-94
    • /
    • 2006
  • "Mixed construction of platform" means the platform which was constructed by mixing heterogeneous materials such as roof tiles or bricks with divided stone of trimmed stone. This kind of construction technique was not known or found from the building sites of Goguryo or Silla so far and therefore it used to be understood as a unique platform construction technique or the product of technology and creativeness of Baikje's craftsman. The mixed construction of platform of Baikje came to position itself as one of the patterns of platform mainly used over Sabi period and we found the pattern from the sites including Imryugak site in Gongju, temple for royal tomb in Gwanbuk-ri, Wangheungsa Temple site, building site in Keumseong Mountain, Ohapsa Temple site in Byryeong. From the fact that they used a variety of materials which they could easily get around them such as roof tiles or bricks in addition to stones for the construction of platforms, we can see the feasibility and decoration characteristics of their material supply at that time. On the other hand, this mixed construction of platform was not popular in Goguryo and Silla, the major reason for which is judged to be non-existence of platforms to construct using bricks or roof tiles which could be constructed together with platform using divided stones. This is supported by the results of excavation of Hwangryongsa Temple site, Bunhwangsa Temple site, Heungryunsa Temple site of Silla which gave us comparatively abundant excavation data, and Jeongreungsa Temple site, Cheongamsa Temple site, Toseongrisa Temple site and building site in Daeseong Mountain castle and Anhak Palace site of Goguryo. For further progressive study on the mixed construction of platform of Baikje in the future, we will have to review more on the social background and technical background with the linkage with archeology and architecture at that time which led to the creation of such platform.

  • PDF

Delphi 기법을 통한 건설기술진흥법 개정에 따른 CM사 대응방안에 관한 연구 (The Corresponding Plan of Construction Management Enterprise for the Introduce of Construction and Technology Promotion Law with Delphi Method)

  • 김성식;박정로;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.121-122
    • /
    • 2012
  • It has been passed around two decades since the CM is introduced in December 1996. And 20 years have passed. Construction Technology Management Act is the enacted of 1987, since Independence Hall fire in 1986. In the meantime, basic background and operational rather than the development of regulations that skewed had a voice of concern. Accordingly, Ministry of land is promoting a full-scale revision that Construction Technology Promotion law as switching to promote and support the necessity from Regulatory and management-oriented paradigm. In this paper, according to the Construction and Technology Promotion law amended in the course of doing business, was conducting research for drawn counterstrategy through SWOT analysis that was not the side of owner but CM company.

  • PDF

INVASION OF THE UK ORIGINATED QUANTITY SURVEYING PROFESSION INTO KOREA CONSTRUCTION INDUSTRY. A REVIEW OF THE QUANTITY SURVEYING CONSULTANCY SERVICES IN KOREAN CONSTRUCTION MARKET

  • Chan-Ho Yoon;Min-Jae Lee;Dong-Youl Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1419-1425
    • /
    • 2009
  • Quantity Surveying Profession is a new breed with a history of only less than seven years in S. Korea' s Construction Industry. In this paper, the research aims to investigate the background of the market entrance of this profession in Korean Construction Industry, and the current market direction and future market demands. The research concludes that climate changes in Real Estate markets in relation to Project Financing practices caused by economic crisis of late 1997's, enabled the UK originated QSP sustainable in S. Korea. Moreover it was pointed out that the services of QSP current available in S. Korea's market attributed the different aspect compared to traditional quantity surveying services prevailed in UK. Finally it was apparent that the evolutional direction of the future quantity surveying market in S. Korea is most likely toward multidisciplinary skilled services profession processing not only broader architectural knowledges but cost consciousness, specialty in construction costs and construction contract aspects and transparency in ethical manner.

  • PDF

Estimation of modal correlation coefficients from background and resonant responses

  • Denoel, V.
    • Structural Engineering and Mechanics
    • /
    • 제32권6호
    • /
    • pp.725-740
    • /
    • 2009
  • A new simple relation for the estimation of modal correlation coefficients is presented. It is obtained from the decomposition of covariances of modal responses into background and resonant contributions, as it is commonly done for the variances. Thanks to appropriate assumptions, the modal correlation coefficients are estimated as weighted sums of two limit values, corresponding to the background and resonant responses respectively. The weighting coefficients are expressed as functions of the background-to-resonant ratios, which makes the proposed formulation convenient and easily accessible. The simplicity of the mathematical formulation facilitates the physical interpretation. It is for example proved that modal correlation coefficients can be non negligable even in case of well separated natural frequencies, which is sometimes unclear in the litterature. The new relation is mainly efficient in case of large finite element models. It is applied and validated on a finite element buffeting analysis of the Viaduct of Millau, the highest bridge deck ever built so far.

3D/BIM Applications to Large-scale Complex Building Projects in Japan

  • Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
    • 국제초고층학회논문집
    • /
    • 제3권4호
    • /
    • pp.311-323
    • /
    • 2014
  • This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.

그린빌딩의 품질향상을 위한 공정관리매뉴얼 개발 (Development of Process Management Manual for Quality Improvement of Green Building)

  • 김대건;황현준;류경구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.245-246
    • /
    • 2013
  • The construction of green building has distinct charicteristics by work classification by applying green technologies. Thus if the new technologies are applied to construction, unskiiled worker can experience construction time delay, reconstruction occurrence and quality decrease because of mistakes during the construction and work progress. For this background, we establish the work progress manual to secure quality and performance during the construction phase of green building and provide method to be used in the construction sight operation.

  • PDF

Tools to Prioritize Construction Phase Sustainability Actions (CPSAs) and to Measure CPSAs Implementation

  • O'Connor, James T.;Torres, Neftali;Kralik, Nancy;Woo, Jeyoung
    • Journal of Construction Engineering and Project Management
    • /
    • 제8권1호
    • /
    • pp.22-30
    • /
    • 2018
  • Achieving sustainability targets on construction projects has increasingly become one of the prime strategies for construction organizations. To provide more detailed guidance on sustainability implementation on projects, Construction Industry Institute (CII) Research Team (RT) 304 developed a catalog of the Construction Phase Sustainability Actions (CPSAs). The primary objective of this paper was the development of two support tools, the CPSA Screening Tool and the CPSA Implementation Index, that could be used to enable efficient application of CPSAs, support sustainability-related decisions, and measure CPSA implementation and performance. The authors developed the tools in four stages: conceptual, detailed planning, tool programming, and testing. The tools were then demonstrated on a capital project to confirm their efficacy and applicability. This paper presents the background, inputs and outputs, and the algorithms of each tool. The CPSA Screening Tool can prioritize the CPSAs most relevant to a project; the CPSA Implementation Index enables continuous monitoring of implementation levels.