• Title/Summary/Keyword: Construction Unit

Search Result 1,835, Processing Time 0.031 seconds

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.

A Study on the Revision of Construction Standard Unit Price for Interior Finishing Work and Carpentry Work (건설공사 표준시장단가의 수장공사 및 목공사 개정에 관한 연구)

  • Lee, Ju-hyun;Baek, Seung-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.245-246
    • /
    • 2023
  • A construction site survey is carried out for the Construction Standard Unit Price(CSUP) in order to establish a standard for the appropriate estimated price. This paper proposed the revised plan by surveying the 56 sites under construction from March to October 2022 for interior finishing work and Carpentry work. It is expected that the revision of the CSUP for interior finishing work and Carpentry work will more accurately reflect the actual construction situation and contribute to improving the adequacy of the CSUP.

  • PDF

Assessment of risk of unit work in nuclear power plant construction using AHP (AHP를 이용한 원자력발전소 건설공사의 단위작업 위험도 평가)

  • Lee, Jong-Bin;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.62-67
    • /
    • 2014
  • The purpose of this study is to analyze the degree of risk of the working unit of nuclear power plants construction. In order to do this, and the risk index by type and source of risk judgment derived in the previous study were utilized. Further, to derive a risk index of unit work in nuclear power plant construction, a survey targeting safety professionals was conducted. The analytic hierarchy process (AHP) was used for analysis of the survey. The following results were obtained. Firstly, the results of AHP showed that main building work is the most dangerous work, and base excavation work is the second dangerous work among 21 unit works. Secondly, so, it is required to invest more and to take a increasing interest in unit works of civil and architecture as compared to other unit works. Further, the results could be used to reduce the degree of risk in construction of the nuclear power plant.

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

A Study on the Project Delivery System Improvement for Construction Efficiency of the Unit Modular Housing (유닛모듈러주택의 시공효율화를 위한 수행체계 개선방향 연구)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Park, Su-Yeul;Chae, Myung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.265-267
    • /
    • 2013
  • Recently, It is being reduction to market of the domestic construction industry for the instability of the domestic market structure. So it is necessary to plan response measures for to ensure the competitiveness of the construction market of overseas. The purpose of the study is suggest of improvement of the project delivery system for the efficiency of the construction of the unit modular housing of considering the reducing cost and technological competitiveness of the domestic construction industry.

  • PDF

Estimation of the Probability Distribution Model on the Load of Transport of the Unit Module (유닛모듈 운반하중에 관한 확률분포 모델 추정)

  • Park, Nam cheon;Kim, kyoon Tai;Kim, Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.220-221
    • /
    • 2014
  • Recently It has been required the research for the load of transport of the unit module to secure the safety of the transport locking device. So the purpose of this study is to analyze the probability distribution of the load of transport of unit modular when transporting unit modular by vehicle.

  • PDF

Effect of hybrid polypropylene-steel fibres on strength characteristics of UHPFRC

  • Nuaklong, Peem;Chittanurak, Jithaporn;Jongvivatsakul, Pitcha;Pansuk, Withit;Lenwari, Akhrawat;Likitlersuang, Suched
    • Advances in concrete construction
    • /
    • v.10 no.1
    • /
    • pp.1-11
    • /
    • 2020
  • This study intends to produce an ultra-high performance fibre reinforced concrete (UHPFRC) made with hybrid fibres (i.e., steel and polypropylene). Compressive and tensile strength characteristics of the hybrid fibres UHPFRC are considered. A total of 14 fibre-reinforced composites (FRCs) with different fibre contents or types of fibres were prepared and tested in order to determine a suitable hybrid fibre combination. The compressive and tensile strengths of each concrete at 7 days were determined. The results showed that a hybrid mix of micro-polypropylene and steel fibres exhibited good compromising performances and is the ideal reinforcement mixture in a strong, cost-effective UHPFRC. In addition, maximum compressive strength of 167 MPa was achieved for UHPFRC using 1.5% steel fibres blended with 0.5% macro-polypropylene fibres.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

Tendency of Each Space of Unit Plans for Brand Apartments (브랜드 아파트의 단위평면 각 실의 경향분석)

  • Oh, Hye-Kyung;Hong, Yi-Kyung
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.1
    • /
    • pp.128-137
    • /
    • 2011
  • This study aims to examine each space characteristics of unit plans for brand apartments. Through construction companies' web-sites and real estate web-sites, all the apartment unit plans with $66m^2{\sim}164m^2$ unit among the brand apartments were analyzed. On the analysis of the apartment unit plans($66m^2{\sim}164m^2$) provided by top 8 construction companies from March 2004 to December 2008. The remarkable changes compared to existing apartments include an increase in the number of bays; front side allocation of bedrooms beside the main bedroom; installation of a vestibule, a dressing room, and a powder room; installation of built-in closets in bedrooms beside the main bedroom; and installation of a receipt spot on the sidewall in the balcony. Besides, as for minor opinions there were opinions of front side allocation of kitchen/dining room, back side allocation of the main bedroom, and installation of dressing room in bedrooms beside the main bedroom. Therefore, construction companies should pay attention to research result about the unit area ranges of apartment unit plans, and reflect it positively to develop apartment unit plans to satisfy consumers.

Considerations in the early stage of Designing the Unit Modular Building (유닛모듈러 건축물의 설계 초기 단계에서의 고려 사항)

  • Lee, Young-Ho;Lee, Du-Heon;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.133-142
    • /
    • 2012
  • With the recent changes in building environments such as low-carbon green growth, there have been increasing demands for the new building system that is eco-friendly and can maximize efficiency such as the unit modular system. For the unit modular system, more than 80% of the whole process is carried out in the factory while in the field, mostly unit module assembling and finish work are done. Thus, the quality at the pre-construction stage when design and manufacturing are done determines the quality of the building as a whole. In the country, the unit modular method was first applied in 2003 to school buildings and has gradually expanded afterwards, but due to the lack of examples and related information as well as the small scale of modular manufacturers, its characteristics have not been sufficiently reflected in design, manufacturing and field constructions. This study, as an attempt to improve the design quality of unit modular buildings, points to the problem in manufacturing and field construction, compares and analyzes its causes, and suggests major points to be considered in the early stage of designing the unit modular buildings.