• Title/Summary/Keyword: Construction Techniques

Search Result 1,760, Processing Time 0.031 seconds

FLEXIBLE OPTIMIZATION MODEL FOR LINEAR SCHEDULING PROBLEMS

  • Shu-Shun Liu;Chang-Jung Wang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.802-807
    • /
    • 2005
  • For linear projects, it has long been known that resource utilization is important in improving work efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This paper presents an optimization model for solving linear scheduling problems involving resource assignment tasks. The proposed model adopts constraint programming (CP) as the searching algorithm for model formulation, and the proposed model is designed to optimize project total cost. Additionally, the concept of outsourcing resources is introduced here to improve project performance.

  • PDF

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

An Application for Tracking the Location of Material using RFID and Wireless Network Technology (RFID와 무선네트워크 기술을 이용한 자재위치파악 방안)

  • Lee, Nam-Su;Song, Jae-Hong;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.523-528
    • /
    • 2006
  • The management of construction materials is one of the important administration factor to perform construction projects. If it is not flexible to supply necessary materials to a workplace at a proper time, some problems such as a construction cost increase, an operation delay, a lowering of work efficiency and etc. could occur during the progress of work. Therefore, tracking the precise location of materials is important and necessary to input materials in the accurate place. Although Location sensing techniques comprise GPS, Active Badge, EasyLing and so forth, there are technical limitations to apply these techniques on construction site. Accordingly, in this paper, we propose the technically feasible method to automatically locate materials on site using recent RFID and wireless network technologies.

  • PDF

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

Framework of Electronic Construction Specification by Using IETM (전자매뉴얼에 의한 건설공사 시방서 구성방안)

  • Moon, Hyoun-Seok;Kang, Leen-Seok;Jeong, Seong-Yun;Kwak, Joong-Min;Jung, Won-Myoung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1114-1117
    • /
    • 2004
  • Application of information technology for the construction area has been processed actively with the development of information technology. In this study, a framework of the Construction Specification IETM(Interactive Electronic Technical Manual) was suggested through the analysis of the Department of Defense(DoD)'s standards and the trend of techniques related to the IETM. As the Framework, the DFD(Data Flow Diagram) of the construction specification IETM's organizing and using procedure was suggested. And a Model of construction specification IETM was organized on the basis of DFD. Finally, a scenario was constructed by the pilot system which is based on the model. The application of the construction specification IETM would make efficient and effect task implementations possible. By that, in addition to the reduction of the cost and time, the quality enhancement from information missing protect effectiveness could be expected.

  • PDF

A Study on the building site worker convenience facilities (건축현장 근로자 편의시설 개선방안 연구)

  • An, Sung-Hoon;Shin, Jung-Hyun;Zhang, Zhen;Gang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.347-348
    • /
    • 2012
  • Korea construction techniques are confident that the world's best work, but construction worker is the level of the worst working conditions. Korea Construction Industry Improvement of facilities for the advancement of the field workers need more than anything else. Improved facilities for field workers in the construction sector is responsible for a large shaft and substantially promote the welfare of workers in the field and contributed greatly to the morale and will help to improve housing quality can be expected. Earlier status of construction workers and facilities is considered an urgent need for improvement.

  • PDF

Program development for composition of construction safety management expenses (건설안전관리비 산정 프로그램 개발)

  • Hong, Sung-Man;Lee, Jung-Gi;Park, Peom
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.2
    • /
    • pp.23-32
    • /
    • 2002
  • The small-and-medium sized construction sites are in weak state of safety management because of the variable working environments, the lack of safety techniques and the weak economic conditions, and industrial accidents of these sites were occupied 60% of the total construction accidents. Recently, the safety engineer's number are not to be enough at the small-and-medium sized construction sites. Therefore, the safety engineer's works are addition to more and more. This paper is a development of the integrated program which using composition of construction safety management expenses. It is an management tool which helps to saving time of construction safety engineer. A method of development composition, to used Brain Storming for a place of meeting to construction safety management counselors.

A CP-BASED OPTIMIZATION MODEL FOR CONSTRUCTION RESCHEDULING PROBLEMS

  • Shu-Shun Liu;Kuo-Chuan Shih
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.941-946
    • /
    • 2005
  • It is essential for project managers to make schedule adjustment based on their professional experience, in terms of rescheduling action discussed in this paper. This paper discusses the topics of resource-constrained construction rescheduling by modifying the concepts of manufacturing rescheduling. Moreover, the influence factors of construction rescheduling problems are investigated and identified in this paper. According to initial schedule plan and present progress, a new rescheduling mechanism based on Constraint Programming (CP) techniques is developed to reschedule projects with the objective of minimizing total project cost or duration, under three rescheduling policies. Through case study, the behavior of three different rescheduling policies is analyzed and discussed in this paper.

  • PDF

AUTOMATED INTEGRATION OF CONSTRUCTION IMAGES IN MODEL BASED SYSTEMS

  • Ioannis K. Brilakis;Lucio Soibelman
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.503-508
    • /
    • 2005
  • In the modern, distributed and dynamic construction environment it is important to exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research has demonstrated that (i) a significant percentage of construction data is stored in semi-structured or unstructured data formats (ii) locating and identifying such data that are needed for the important decision making processes is a very hard and time-consuming task. In this paper, an automated methodology for the classification and retrieval of construction images in AEC/FM model based systems will be presented. Specifically, a combination of techniques from the areas of image processing, computer vision, and content-based image retrieval have been deployed to develop a method that can retrieve related construction site image data from components of a project model.

  • PDF

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF