• Title/Summary/Keyword: Construction Supervision System

Search Result 126, Processing Time 0.033 seconds

A Construction Method for CBTC Communication Networks (무선통신기반 열차제어를 위한 통신시스템 구축방안에 관한 연구)

  • Kim Jong-Ki;Choi Kyu-Hyoung;Lee Kee-Seo
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.257-263
    • /
    • 2006
  • This paper presents an optimization approach to the configuration of train radio communication network for CBTC. The target specifications of CBTC communication systems are derived from technical requirements for CBTC. The proposed communication system has a ring-topology backbone communication network between stations and a radio network based on IEEE 802.11b wireless tan between trains and wayside devices. The proposed method has been applied to the standardization of the signalling system of urban transits.

Vision-based full-field panorama generation by UAV using GPS data and feature points filtering

  • Guo, Yapeng;Xu, Yang;Niu, Haowei;Li, Zhonglong;E., Yuhui;Jiao, Xinghua;Li, Shunlong
    • Smart Structures and Systems
    • /
    • v.25 no.5
    • /
    • pp.631-641
    • /
    • 2020
  • To meet the urgent requirements of safety surveillance from civil engineering management authorities, this study proposes a refined and efficient approach to generate full-field high-resolution panorama of construction sites using camera-amounted UAV (Unmanned Aerial Vehicle). GPS (Global Position System) information extraction for pre-registration, feature points filtering for efficient registration and optimal seaming line seeking for fusion are performed in sequence to form the full-field panorama generation framework. Advantages of the proposed method are as follows. First, GPS information can sort images for pre-registration, avoiding inefficient repeated pairwise calculations and matching. Second, the feature points are filtered according to the characteristics of the construction site images to reduce the amount of calculation. The proposed framework is validated on a road construction site and results demonstrate that it can generate an accurate and high-quality full-site panorama for the safety supervision in a much efficient manner.

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.

Design and Implementation of Workspace Safety Management System based on RFID using Variable Radio Wave Oscillation (가변적 전파발진을 이용한 RFID기반 작업장 안전관리 시스템 설계 및 구현)

  • Min, So-Yeon;Lee, Kwang-Hyoung;Jang, Seung-Jae;Lee, Keun-Wang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.8
    • /
    • pp.3660-3669
    • /
    • 2011
  • Demands for systemized management of workers' safety systemically in construction sites have been increased. Industrial accidents at work places are often happened by risk factors of construction sites, and also it brings a lot of loss as the correct direction for workers about locations to work is not delivered properly. In this paper, a safety supervision system for construction sites is designed and implemented to figure out the location of workers accurately and to provide the information about the status of works and workers in real-time by personal device which is based on RFID. The system designed in this paper achieved high performance in its function and efficiency through a performance test, compared with existing analogous systems.

Improvement of Construction Management Process for the Site Manager in Small Scale Building Construction Project (소규모 건설프로젝트에서 현장관리업무 개선방안)

  • Lee, Da-Un;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.81-87
    • /
    • 2018
  • Since February 2017, site managers in small architectural projects are required by the revised building act. In order to address issues for site managers and to improve project efficiency, system improving methods are surveyed and proposed in this study. The key inspection items in the existing surveillance guidance manual were investigated, and the checklist for site managers for a small to medium sized construction site was analyzed. This study also tries to propose using web-based site management systems for improvement of the utilization of checklists. It is expected that these on-site management systems, along with BIM technology, will be able to monitor the small size building construction project in real time and effectively monitor the various problems occurring on-site.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

Study on the Automatic Supervision System of Overloading vehicle (도로 과적차량 자동 단속시스템 도입방안)

  • Ryu, Seung-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1052-1053
    • /
    • 2008
  • 도로 과적 차량은 일반 승용차보다 도로를 많이 훼손하여 도로, 교량의 사용 수명을 단축시키고, 유지보수 비용을 상승시키는 원인으로 분석되고 있다. 또한 과적 화물차량은 정상차량에 비해 도로 주행 흐름을 상대적으로 떨어뜨려, 도로 용량을 저하시키며, 소음과 진동의 발생, 배기가스 배출 등 여러 가지 문제를 발생시키는 원인이다. 특히, 도심지에서의 화물차 운행은 선진적인 단속체계가 더욱 필요하다. 현재의 단속시스템은 단속인력과 계측장비를 설치한 고정식의 과적 검문소를 운영하거나 이동식의 단속 검문을 병행하는 방식이다. 그러나 도심지의 경우, 교통정체, 고정식 검문소의 부지 확보 등 현실적으로 단속업무를 실시하기 어려운 환경이다. 본 논문에서는 현재 운영하는 고정식의 단속시스템을 자동 단속시스템으로 전환시키기 위한 기술적 구성 방안에 대해서 검토하였다.

  • PDF

Design of Power Controller for Control Rod Drive Mechanism Control System (제어봉 구동장치 제어시스템용 전력함 설계)

  • Nam, J.H.;Lee, J.M.;Jung, S.H.;Shin, J.R.;Cheon, J.M.;Kim, C.K.;Kim, S.J.;Kweon, S.M.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2271-2273
    • /
    • 2003
  • Control Rod Control System(CRCS) is to control nuclear reaction of reactor by moving Control Rod Drive Mechanism(CRDM) with speed and direction signal from Reactor Regulating System(RRS). CRCS is made up of two parts : control cabinet and power cabinet. And this paper presents mainly power cabinet design for system reliability. To increase reliability of power cabinet, controller, power supply and communication line arc doubly designed and supervision and diagnosis function are applied.

  • PDF

Alternative Energy - Environment Safety

  • Kurnaz, Sefer;Rustamov, Rustam B.;Zeynalov, Ismayil
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.10 no.1
    • /
    • pp.91-97
    • /
    • 2009
  • It is undertaken systematization of results of satellite and ground observation parameters characterizing a current condition and climatic variability of two selected geographical areas. One of them covers territory of Azerbaijan and another covers a wide area of Caspian See region. Average values and mean square deviations of following values are investigated: outgoing long wave radiation during a day and night (in nebulosity and cloudless). absorbed within a day of the stream of a sunlight of the system in "a terrestrial surface-atmosphere". degree of a covering by clouds of the selected areas during a day and at night, ground temperature values of air. pressure and speed of a wind. Monthly average values of corresponding parameters create a basis of suggested investigations. It has been presented features of a time course of investigated parameters for each month and year in the whole due to the continuously observations since 1982-2000. The scientific problem consists that there are no existed models which authentically would be cover the main aspects of a realities specified changes: they are identified by economic activities. growth of the population and other features of development of a human society or internal fluctuations of biogeophysical/climatic system. Possibilities of predictability of biosphere and climate changes depend on available timely supervision. adequacy of construction of appropriate models. understanding of mechanisms of direct and feedback influences in such complicated systems.

Study on the Key Technologies for Performance and Operation of the High-Speed EMU (동력분산형 고속철도 차량성능 및 운용 기반기술 연구)

  • Song, Dahl-H.;Min, Kyung-H.
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1227-1232
    • /
    • 2008
  • High-speed train of push-pull type called as G7 train has been developed and chosen as the model of KTX-II which will be operated on Honam Line nexr year. However, the EMU-type high-speed train appeared to be the recent trend that foreign markets have shown. Also, in the near future, a great number of new train sets are needed to accommodate the increased passengers in our country. Thus, development of the high-speed EMU was decided, planned, and started. In the development, included were almost all fundamental key technologies such as noise and vibration reduction in a passenger cabin, running characteristics, aerodynamic analysis, crashworthiness evaluation, EMI/EMC analysis, design of the cooling system for the propulsion control system, enhanced performance of transformer and switching converters, synchronous traction motor with permanent magnets, new design of front nose and ergonomic interiors, application of advanced information technology(IT) and smart sensors and the cost reduction of construction of railway bridges, etc. Each key technologies are carried out as sub-project independently but under the supervision of a project. The project will develop the high advanced level of technologies and provide necessary know-why's and support the team in charge of the development of the high-speed EMU, Hyundai Rotem Co. Ltd. The high-speed EMU will be successfully developed with the support of the project.

  • PDF