A Analysis and Improvement of Manpower Management For Finish Work in High-Rise Housing Projects (초고층 주상복합 건물 마감공사 출역인력관리 현황분석 및 개선방안)

  • Won, Kyeong-Suk;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.600-603
    • /
    • 2004
  • Recently, Housing projects in the center of the Metropolis are getting higher, larger, more complex gradually, the resources are increasing greatly. Especially, the right manpower in the right place could quite important factor because the construction cites are wide and many subcontractors and labors throw into finish works in High-rise Housing projects. Differing from apartment building projects. it is only four or five years that high rise building projects are started so, there is little data for manpower information. Furthermore it is difficult that the data gathering and managing because manpower management is usually used to execute by subcontractors from supply to demand. Consequently, this study, proposed develop management for accurate manpower plan and efficient collection and practical use of manpower information through analysis of present condition in construction sites

  • PDF

A Study on the Effect of Safety Education to Prevent the Disasters and Accidents in Construction Field (건설현장에서 산업안전교육이 재해 및 사고방지에 미치는 효과 연구)

  • Woo, Heung-Sik;Ryu, Boo-Hyung;Jo, Jae-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.3
    • /
    • pp.32-38
    • /
    • 2009
  • Construction companies economic to lighten the restrictions on safety education and training due to the domestic recession as long as the global downturn. With this, the Korean government lightened that restrictions, but the incidents are being sharply increased nowadays. The construction industry is more hazardous than any others, so, they insist to reinforce the training for incidents prevention, but it is prone to be disregarded at the subcontractors of the bigger construction companies due to their financial problems. According to these matters, this study hereby surveyed regarding their suggestions for the improvements of the training concepts through questionnaires below.

산업안전교육이 건설현장에 미치는 영향에 관한 실증적 연구

  • Jo, Jae-Hwan
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.51
    • /
    • pp.75-83
    • /
    • 2010
  • In terms of deregulation requests from business, incidents at construction sites are rapidly increasing after reducing the regular safety training hours. Especially, to prevent incidents through safety trainings for construction site workers, who have lots of hazardous tasks than general manufacturing, is not only to protect property of both the companies and the country but also to increase their profits. That is why there are loud voices regarding that the safety training is a core mandatory to prevent industrial incidents. But, most companies, as soon as the deregulation for safety training is implemented, mitigated conducting safety trainings to prevent incidents. With this, theincidents are currently to be increased and caught in a vicious circle of many incidents at the smaller companies because of their absentmindedness regarding safety training due to their poorness as subcontractors of major companies, comparing to major companies. This study explains that incident factors are roughly divided into technical factor, managerial factor, and educational factor. And, we confirmed that the educational factor led by deficiency safety awareness and knowledge was the major factor.

  • PDF

ANALYSIS OF THE TRENDS IN ADJUDICATION IN NEW SOUTH WALES

  • Michael C. Brand;Thomas E. Uher
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.687-692
    • /
    • 2005
  • The Building and Construction Industry Security of Payment Act 1999 (NSW) (the Act) is a unique form of statutory regulation for the building and construction industry, which gives virtually all industry participants a statutory right to, and a means of recovering, payments for work done under a construction contract. The research aim is to examine current trends in adjudication applications and determinations under the Act. The research reveals: (a) that the adjudication process is encouraging parties to resolve disputes as to payment (b) that there is low level of awareness and understanding of the provisions of the Act, particularly amongst subcontractors; (c) that claimants making small claims experience a high rate of success at adjudication; and (d) that the indirect cost of adjudication is becoming problematic.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

Analysis on the submittal process for a small local environmental construction company: a case study (지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구)

  • Lee, Do Gyun
    • Journal of Urban Science
    • /
    • v.6 no.2
    • /
    • pp.73-80
    • /
    • 2017
  • A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

  • PDF

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

Opportunities for Synergistic Collaboration between U.S. and Asia in Construction Business, Research, and Education

  • Liu, LiangY.
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.3-8
    • /
    • 2007
  • "The world is flat" as the popular author Thomas L. Friedman declares in his best belling book about the progress of business globalization in the $21^{st}$ century [3]. Construction projects and related businesses have been global since the 1800's, but it has never seen such rapid transformation in both scope and depth as in the past decade. Construction projects today often bring together international design talents, construction management firms, local and international labor forces, and global suppliers. On a visit to Dubai in the United Arab Emirates on the Persian Gulf, a person will experience the complexity of globalization of modern construction projects- with Arab owners, European engineering and design companies, American construction management teams, Korean general contractors, Jordanian subcontractors, and labor forces from Thailand, Indonesia, Turkey, and Sri Lanka. A count of material suppliers reveals over 60 countries involved, covering all continents. Indeed construction projects are getting more and more complex and competitive, as is the project execution. The trend toward globalization poses both challenges and opportunities to construction and engineering companies competing on a global scale. While global competition may be a threat to many companies, there are, however, many opportunities for synergistic collaborations that can create win-win scenarios for construction business, research, and education. This paper presents some of the opportunities between the U.S. and Asia in business integration, research collaboration on technologies, and educational development, which may mutually benefit countries on either side of the Pacific.

  • PDF

Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction - (건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로-)

  • Bok, Hoon;Kim, Hyeong-Tae;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

WHEN CM AT RISK MEETS VIRTUAL DESIGN AND CONSTRUCTION (VDC) IN CONSTRUCTION PHASE: CASE STUDY OF PRACTICIES IN U.S.

  • Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.566-572
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.

  • PDF