• Title/Summary/Keyword: Construction Standard Cost

Search Result 521, Processing Time 0.028 seconds

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

Research on Health Performance Evaluation of Existing Buildings using WELL Building Standard - for Green Remodeling applied Buildings - (웰 빌딩 스탠다드를 활용한 기존 건축물의 건강성능평가 연구 - 그린리모델링 적용 건축물을 대상으로 -)

  • Lee, Du Hwan;Kim, Young Il;Kim, Jae Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.2
    • /
    • pp.165-173
    • /
    • 2020
  • The purpose of this research is to evaluate the health performance of existing buildings which completed green remodeling using the WELL Building Standard developed by Delos in the USA. The features and the level of improvement in health were examined and the results were as follows. As a result of comprehensive evaluation of the health performance of the target building, the health performance after green remodeling improvement was improved by 17.3% compared to before green remodeling. As a result of applying the alternatives for improving health performance, improvements were 22.9% by Alternative 1, 28.8% by Alternative 2, and 28.7% by Alternative 3. If the improvement ratio with respect to the construction cost were compared, Alternative 1 was the best followed by Alternative 2. Finally, the cost effectiveness of improving health performance against construction cost were best in the order of self-closing door installation, airtight seal, and pest inspections.

A Study on the Operating System of the Architectural Standard Scale of Length(尺度, Korean foot) used in the Hwasong City Wall in the 18th Century (척도운용체계를 통해 본 18세기 화성건축의 건축구성에 관한 연구)

  • Lee, Ho-Rak;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.6 no.2 s.12
    • /
    • pp.65-77
    • /
    • 1997
  • The Hwasong City Wall was built for three years(1794-1796), but the real construction term was taken only 28 months. The wall and the buildings on the wall were built simultaneously, and the esttimated construction cost was highly restricted. These conditions were main factors for considering the high efficiency of construction productivity. This study examines these factors that are reflected in the operating system of the architectural standard scale of length, the architectural composition system in the Hwasong City Wall to reduce the construction cost. Through the study, following factors are found. 1.The rule of multiple proportion is found in the relationship between the partition distance, that is, span and the height of the girder which is related to the productivity of ready-made building members. 2.The ruling grade system of scale in the component members is found in the chang-bang(창방, penetration members)

  • PDF

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

Application of Accrual Basis for Calculation of Prolongation Cost in Construction Projects (공기연장 추가간접비 산정기준의 발생주의방식 적용 연구)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.111-120
    • /
    • 2018
  • Recently, Domestic public construction projects are experiencing a great deal of disputes because of the growing uncertainty about the criteria for calculating the prolongation cost. In addition, researchers have been studying various systems and proper cost estimates in an effort to reduce the uncertainty of these systems and the occurrence of disputes. However, there is no standard yet for social consensus. Meanwhile, The study on the classification system according to the recognition standard of accounting has been systematically studied. As a result, the concepts of accrual and cash basis are defined separately. The purpose of this study is to verify the possibility of applying the concept of 'accrual basis' to the Standard for calculation of prolongation cost. Therefore, As a result of analyzing the occurrence pattern of Job-site overhead cost, it is confirmed that actual costs can not be calculated by the cash-basis method. In particular, the implications of the necessity of the accrual-basis method should be more strictly indicated in the case of items such as indirect labor costs and welfare benefits. In addition, the contractor 's claim report and the appraisal report were examined. As a result, it was confirmed that the calculation situations of prolongation costs are biased to the cash-basis method. In this way, it is suggested that necessary to supplement the calculation standard of the actual costs from the point of view of accrual basis.

A Conceptual Algorithm for Determining the Spacing of Standard Penetration Test Spots. (표준관입시험 간격 결정을 위한 개념적 알고리즘)

  • Habimana, Gilbert;Lee, Donghoon;Han, Kyung-Bo;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.185-186
    • /
    • 2015
  • The Standard penetration test determines the type of soil according to soil bearing capacity, and this classifies the subsoil into many layers. Construction project managers are willing to know the depth of the present types of subsoil on site in order to make plans on earthwork stage during excavation. However the standard penetration test may not provide accurate information on subsoil type due to incorrect spacing. To solve this problem, this study propose a conceptual algorithm for determining the spacing of standard penetration test spots to essentially tests relevant locations on which to be applied the standard penetration test. This provides the acquirement of the accurate layered model volume of earthwork revised into geological columnar section. This algorithm will determine the appropriate standard penetration test spots spacing on a given size of site to optimize the accuracy of the earthwork volume, time and cost.

  • PDF

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

A Study on the Cost Impact of Additional Construction as Rating G-SEED Certification of Medium-Sized Office Buildings in Korea - Based on G-SEED 2016-2(Effective September 1, 2018) - (국내 중규모 업무용 건물의 녹색건축인증 등급별 추가공사 비용 영향에 관한 연구 - G-SEED 2016-2 기준으로(2018년 9월 1일 시행) -)

  • Lee, Du-Hwan;Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.10
    • /
    • pp.225-234
    • /
    • 2019
  • The purpose of this paper is to analyze the additional construction cost of G-SEED certification for domestic office building reflecting the latest standard(G-SEED 2016-2), and to derive cost impact by category and level. Therefore, it is intended to provide quantitave cost data according to G-SEED certification at the planning phase of the project, estimate the additional construction cost per level according to G-SEED Certification of similar project to be carried out in the future, and encourage G-SEED certification by supporting the decision of the owners. Method: The Process and method of this study are summarized in five steps, 1) Review of previous research, 2) Selection of target project, 3) Scenario setting by level, 4) Additional construction cost for each evaluation category, 5) Extraction of additional construction cost ratio by level. Result: This paper analyzed the cost impact by deriving the additional construction cost of detailed category for level improvement according to the revised G-SEED certification(G-SEED 2016-2). In conclusion, an additional construction cost(ratio) of G-SEED projects to the reference building is drawn as good level; 157,426,241 KWN(+0.43%), very good level; 321,907,802 KWN(+0.88%), excellent level; 999,371,478 KWN(+2.74%), and outstanding level; 1,467,047,718 KWN(+4.02%).