A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

Constructability and Cost Analysis of the Clip-Type Binding Implement Substituting 135° End-Hooked Transverse Reinforcement in Reinforced Concrete Columns (철근콘크리트 기둥의 띠철근에서 135° 갈고리 대체 클립형 연결장치의 시공성 및 비용 분석)

  • Park, Koung-Yeun;Yun, Hyun-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.5
    • /
    • pp.459-469
    • /
    • 2020
  • The purpose of this study is to secure the same or more structural performance and constructability for the detail off hooks cross-constructed at 135° used as external-ties standard detail in reinforced concrete columns, therefore, to the purpose of improving constructability, The clip-type binding implement was suggested. the experiment on the constructability evaluation and cost analysis of the clip-type binding implement by 90° end-hooked transverse reinforcement in reinforced conrete columns was carried out. The results of the analysis confirmed that standard detail column took about an one hour regardless of the diameter of tie. When using the clip-type binding implement, It was reduced to about 50% of the standard detail column. and regardless of the building size, it was most effective for the cost down when using the clip-type binding implement 1ea, it was about 32% fo labor cost reduction effect in comparison with using standard detail. as a result, Using the clip-type binding implement is shown be very effective in the working time and construction cost reduction.

A Development for Construction Cost Prediction Model of Site Development Project (단지공사의 공사비 예측모형 개발 - 토공사를 중심으로 -)

  • Lee Won-Yong;Lee Tai-Sik;Park Jong-Hyun;Bae Keon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.419-422
    • /
    • 2002
  • The features of modem construction industry can be summarized as specialization, complexity, and large-scale. Therefore, increasing uncertainty of construction project can not be effectively dealt with traditional method used for construction cost management. Cost overrun affects on successful execution of managing construction project in a negative way. Therefore, accurate estimation is a priori for effective cost management. First, this work analyzes the previous cost estimation model for the effective cost management. Then, a standard structure required for developing the cost estimation model for site development was presented. In addition, the cost estimation model which can be used in planning and design phases was introduced by analyzing real site development projects.

  • PDF

Comparative Analysis of BIM-Enabled Construction Cost Estimation Practices: A Case Study of Japan and China

  • Shi TANG;Kazuya SHIDE
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.745-752
    • /
    • 2024
  • This paper presents a study that compares and analyzes the practices of utilizing BIM (Building Information Modeling) for construction cost estimation in Japan and China. The study delves into the nuanced differences and similarities in cost estimation methodologies between the two countries. The overview section explored their respective standard specifications, and the methodologies for construction quantities take-off, covering both the bottom-up estimating approach and the all-in unit rate approach. Additionally, the paper delves into the item code system used in BQ (Bills of Quantities), elaborating on its introduction and practical application. The paper meticulously breaks down the process of quantities take-off facilitated by BIM models and cost-estimating software. The study also delves into the developmental trends in comprehensive BIM standards about construction cost, coupled with the proposition of a BIM code for seamless integration into construction cost practices as part of a forward-looking research plan. In conclusion, the paper encapsulates the comparative findings, highlighting the strengths, weaknesses, and potential areas for improvement in the BIM-enabled construction cost estimation practices of Japan and China. This study contributes to a deeper understanding of the utilization of BIM technology in the construction industry, offering valuable insights for practitioners, researchers, and policymakers alike.

A Study on the Measures for Work Interference Reduction in Apartment Construction (공동주택 공사의 작업간 간섭 감소 방안에 관한 연구)

  • An Sung-Hoon;Kim Joon-Ho;Kang Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.117-122
    • /
    • 2006
  • Apartments construction is a one of largest parts in buildings construction. In apartments construction, work interferences are frequently occurred in work processing because workspaces are very various and numerous. However, though work process is important for mainly influencing to the schedule, quality and cost of apartments construction, these work interferences are considered a kind of uncertainty, which is difficult to anticipate at construction planning stage, in work processing. Therefore, this study proposed the measures for work interference reduction in apartment buildings construction and the actual planning for practices. The results can be summarized as follows: (1) the standard of work process is checked regularly. (2) The scope of work and work process is adjusted. (3) The standard of drawings process and cost about work interferences work profess is established.

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

A Study on Association Rule and Cost Efficiency Analysis Model Using Construction Supervision Reports (건축공사감리 문서 기반 연관규칙 및 비용효율성 분석 모델)

  • Song, Tae-Geun;Yoo, Wi Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.389-390
    • /
    • 2023
  • To improve the cost performance of construction sites, various systems and standards are constantly being developed and implemented. Although legal requirements for these system and standard improvements have been increasing, the cost efficiency performance of construction sites remains stagnant. We have digitized documents generated through construction supervision work at 39 building construction sites and proposed a model that can support decision-making in cost efficiency evaluation. This model selects key keywords that are considered to be highly related to cost efficiency by identifying the patterns and relationships of keywords through associated rule analysis and social network analysis using keywords derived from documents. In addition, it is expected to be used as a decision-making aid to determine the cost efficiency of a specific building construction site by establishing a logistic regression model using core keywords. As a systematic database of construction supervision documents and an integrated system of massive data generated by digital technology are established in the future, the accuracy and reliability of the cost efficiency evaluation model are expected to be reinforced.

  • PDF

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.

Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok) (신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계)

  • Jung, Young-Soo;Kim, Woo-Joong;Ha, Ji-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.4
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.