Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan (스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 -)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Realization of Smart Greenhouse Cost Using Greenhouse Structural Code and Greenhouse Construction Estimate (온실구조기준 및 온실공사 품셈을 활용한 스마트 온실 단가 현실화 연구)

  • Lee, Chul-sung;Kim, Hyuk;Shin, Seung-wook;Park, Mi-lan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.2
    • /
    • pp.29-36
    • /
    • 2022
  • This study analyzed the effects of building and greenhouse structural code on the structural design and the greenhouse construction cost. The over-design possibility of greenhouse was analyzed when building structural code was applied using standard smart greenhouse drawings. The possibility of decrease in greenhouse construction cost was investigated if the currently applied building structural code was replaced with greenhouse structural code. As a result of comparing the member sizes with the standard drawings, building structural code was designed with 13%~74% more steel than greenhouse structural code. When building construction estimate was replaced with greenhouse construction estimate, it was possible to reduce the total construction cost of the glass greenhouse by 17% and that of the vinyl greenhouse by 14%. Since there is no standard construction estimate suitable for greenhouses, the wage unit price is set excessively, and the construction cost of the smart greenhouse is increasing. In conclusion, it is necessary to establish greenhouse structural code and greenhouse construction estimate to lower the greenhouse construction cost.

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

A Study on the Changing Factors in Cost Estimate Standard for Reinforced Concrete Structure Maintenance (철근콘크리트 구조물 유지보수 공사비산정기준 개정요인에 관한 연구)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.315-316
    • /
    • 2021
  • The proportion of maintenance work has been increasing due to the recent aging of the infrastructure, but the standardized construction cost estimation standards are insufficient for this. In particular, reinforced concrete structures are being applied to many structures such as buildings and bridges, and various construction methods for maintenance of reinforced concrete structures are being developed and applied. In this study, we surveyed about the current status of the construction method for the maintenance work of reinforced concrete structures and analyze the factors of the revision of the construction cost estimate standard for the reinforced concrete structure maintenance.

  • PDF

Forecasting of building construction cost variation using BCCI and it's application (건축공사비지수를 이용한 건설물가 변동분석 및 공사비 실적자료 활용방안 연구)

  • Cho Hun Hee;Kang Kyung In;Kim Chang Duk;Cho moon Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.64-71
    • /
    • 2002
  • This research developed construction cost forecasting model using Building Construction Cost Index, time series analysis and Artificial Neural Networks. By this model, we could calculate the forecasted values of construction cost precisely and efficiently. And we also could find out that the standard deviation of forecasted values is 0.375 and it is a very exact result, so the standard deviation is just 0.33 percent of 112.28, the average of Building Construction Cost Index. And it show more exact forecasting result in comparison with Time Series Analysis.

  • PDF

Proposal and Evaluation of the Safety Inspection Cost Estimation Model for Multi-building Construction Project (군집시설물 건설공사의 안전점검 대가 산정모델 제안 및 평가)

  • Kim, Jin-Won;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.33 no.12
    • /
    • pp.11-18
    • /
    • 2017
  • The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.

Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation (표준시장단가 공고시기 조정에 따른 영향분석 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

A Development of a Framework Cost Estimation Model for the Digital Document Database Construction Projects (지식정보 구축 대가의 개발 : 국가직무표준(National Competency Standards)과의 통합 방안을 중심으로)

  • Kim, Sojung Lucia;Seo, Yong Won;Son, Young-ho
    • Journal of Information Technology Services
    • /
    • v.16 no.3
    • /
    • pp.47-65
    • /
    • 2017
  • The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.