• Title/Summary/Keyword: Construction Standard

Search Result 3,407, Processing Time 0.042 seconds

The Establishment of Improvement Direction through Case Analysis of Cost Standards in Overseas Construction Engineering (해외 건설엔지니어링분야 대가기준 사례분석을 통한 개선방향 마련)

  • Ko, Hyun A;Han, Jae Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.165-166
    • /
    • 2020
  • The standard for the cost calculation in the field of domestic construction engineering can be largely divided into the construction cost ratio method and the actual cost addition method. However, the standard for calculating the cost of the construction cost ratio method is a trend to switch to the actual cost addition method due to limitations such as not reflecting the characteristics of the construction. Therefore, this study aims to derive implications by investigating and analyzing examples of cost standards in the field of overseas construction engineering, such as the United States, and deriving directions for improvement in domestic cost standards in the future.

  • PDF

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

Comparative Studies of Standard of Estimated Unit Manpower and Material of Landscape Architecture Construction in Korea and Japan (조경공사 표준품셈의 한·일간 비교 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.154-158
    • /
    • 2011
  • This research was carried out to compare the standard of estimated unit power and material in landscape architecture construction between Korea and Japan. It has also been done to offer a practical and reasonable information to Korea landscape architecture industry. The research results are as follows. First, both Korea and Japan's standard of estimated unit power and material in landscape architecture construction are part of civil construction. Second, Korea's detailed type of construction is centered on plant's type and size while Japan's centered on architectural construction. Third, Korea's standard of estimated unit power and material are composed of workforce construction, mechanical construction and addition of soil. On the other hand, Japan's estimated unit power and material are composed of workforce construction, time of transportation, date of transportation. Fourth, the planting specification of Korea seems to be more in detail than that of Japan, Japan's showing a wider implication. Fifth, when comparing the information regarding standard of estimated unit power and material between Japan and Korea, transportation, independent stalking for plant, soil for landscape architecture is difference between the two countries. On the base of this research results, Korea's standard of estimated unit power and material in planning construction should be more elastic in its implication and independent standard of estimated unit power and material in landscape architecture construction. Also, examination of transportation, independent skating for plant and soil for landscape architecture should be done in order for better improvements.

A Study on the Characteristics of Piling Vibration by SIP Method about Variation of Various Earth Conditions (지반조건의 변화에 따른 SIP 항타진동의 특성에 관한 실험적 연구)

  • Kwak, Kwang-Soo;Park, Jae-Young;Lee, Byeong-Yun;Kim, Jae-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.927-932
    • /
    • 2000
  • Recently, construction vibration has caused annoyance for a number of dwellers in nearby construction field and that induced from operating of large construction equipment, has become a very serious issue in our living environment. But, construction vibration standard of our living environment. But construction vibration standard of our country is efficient. Especially, directly blow method(diesel piling method, oil pressure method, etc) has caused much problems of highly impactive vibration. Construction works, in order to solve these problem, will be used SIP(Soilcement Injected Precast Pile) method of low vibration equipment. In this point, this study attempts to survey on the characteristics of piling vibration by SIP method for various earth conditions in construction field. And this study intends to get the basic data to establish a standard about construction vibration.

  • PDF

A Study on the Development Status and Problems of National Competency Standard in Construction Work Field (건축시공분야 국가직무능력표준(NCS) 개발 현황 및 문제점에 관한 연구)

  • Lee, Byung-Yun;Kim, Jin-Dong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.205-206
    • /
    • 2019
  • National Competency Standard(NCS) is a national organization that organizes the knowledge, skills, and quality required to perform duties at industrial sites by industry sector and level. As NCS was developed and adopted as part of the government's implementation of capability-oriented society, the construction industry is also fully applying NCS to the curriculum and training. This study investigated and analyzed the problems of NCS development in construction work field through prior research analysis and experts interview and derived problems such as discrepancies in classification system, lack of connectivity with curriculum, and lack of effectiveness in revising NCS in construction work field. Further research is thought to be necessary for the establishment of the development system reflecting the construction characteristics in the future and for the presentation of practical improvement directions.

  • PDF

Amendment for Plasterboard Partition Wall of LH Construction Specifications (LH 전문시방서의 석고보드 복합패널 관련 개정(안))

  • Choi, Soo-Kyung;Yoon, Sang-Chun;JI, Suk-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.213-214
    • /
    • 2019
  • In order to apply the drywall system to the interior wall of the post & beam structure, the existing detail drawings and construction specifications must be revised. LH selected drywall systems suitable for post & beam apartment housings and revised their standard detail drawings and construction specifications. This paper describes the major revision of the plasterboard partition wall in the LH construction specifications and standard detail drawings. The main policy of the revision work was to prevent defects by ensuring the construction quality and to eliminate adverse effects on the subsequent processes.

  • PDF

An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1 (시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Kim, Dae;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.397-404
    • /
    • 2015
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Public construction projects are typically estimated using the Poom-Saem which includes hourly rates for workers and equipments. Despite its importance, the construction equipment cost may not properly reflect the current market value because it is being updated every six years at most. To keep the data for construction equipment cost estimation up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a wide gap to directly adopt the standard market price for updating the construction equipment prices. Therefore, this paper suggests an effective way to develop an ordinary management systems for updating construction equipment prices in the Poom-saem based on the standard market price.

A study on the introduction of standard specifications for the various fields of electrical installation & construction (전기설비 분야별 표준시방서 도입방안에 대한 고찰)

  • Kim, H.J.;Kim, D.S.;Lee, H.K.;Han, S.O.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11c
    • /
    • pp.39-43
    • /
    • 2005
  • There are big differences between developed countries and Korea regarding to the circumstances of electrical installation construction. In other words, Korea, in spite of its small market size, has large pools of electrical construction companies or associated workers, and there are a lot of poorly electrical construction companies in domestically. Thus, in reality, it is difficult to invest in technical development to enhance Korea's technical level on electrical installation and companies are likely to construct as occasion demands instead of constructing in a technical manner. Therefore, the government needs to develop a standard specification as a guideline for stable, economical and technical electrical installation construction. With this standard specification, almost all electrical construction companies could practically use it and also could guarantee their construction quality as well. It is important to induce small companies to utilize the standard specification to secure their construction excellent quality so that the life of the nation, individual's properties and national properties could be well protected.

  • PDF

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

A Conceptual Algorithm for Determining the Spacing of Standard Penetration Test Spots. (표준관입시험 간격 결정을 위한 개념적 알고리즘)

  • Habimana, Gilbert;Lee, Donghoon;Han, Kyung-Bo;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.185-186
    • /
    • 2015
  • The Standard penetration test determines the type of soil according to soil bearing capacity, and this classifies the subsoil into many layers. Construction project managers are willing to know the depth of the present types of subsoil on site in order to make plans on earthwork stage during excavation. However the standard penetration test may not provide accurate information on subsoil type due to incorrect spacing. To solve this problem, this study propose a conceptual algorithm for determining the spacing of standard penetration test spots to essentially tests relevant locations on which to be applied the standard penetration test. This provides the acquirement of the accurate layered model volume of earthwork revised into geological columnar section. This algorithm will determine the appropriate standard penetration test spots spacing on a given size of site to optimize the accuracy of the earthwork volume, time and cost.

  • PDF