• Title/Summary/Keyword: Construction Standard

Search Result 3,444, Processing Time 0.032 seconds

A Study on the Institutional System for Efficient-Sustainable Recycling of Construction Wastes (지속가능한 건설폐기물 재활용 활성화제도 개선에 관한 연구)

  • Park, Chan-Hyuk;Chung, Jae-Chun
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.12 no.1
    • /
    • pp.94-103
    • /
    • 2004
  • The generation of construction waste has increased continuously in the recent years, becoming an important social issue. In this paper, the generation and treatment of construction waste in Korea was reviewed and a comparative analysis was performed between Korea and developed countries to suggest some efficient recycling strategies. The generation of construction waste has increased 4 times from 10 million ton/yr in 1996 to 40.3 million ton/yr in 2002. Of the construction waste generated in 2002, concrete debris waste occupied 60.4%. Approximately 14.5% of the construction waste is landfilled, 2,0% incinerated and 83.4% recycled, then the recycling rate might be relatively high. However, there is room for increasing landfill diversion. It is somewhat important to strenghten incentives for the outstanding recycling business. It is also needed to improve the recycled aggregate quality standard and impurity content standard. It is desirable to toughen the facility standard for the recycling aggregate business and the quality standard for the intermediate treatment business. Also, market for the intermediate product of the recycled aggregate should be activated. Finally, more recycling-oriented regulations governing the construction waste has to be developed with the efficient public education program.

  • PDF

A Study on the Improvement of Amending Process and Depreciation Measurement Method of the Standard Estimating System (건설공사 표준품셈 제.개정 프로세스 개선 및 손율산정방안에 관한 연구)

  • Ahn, Ji-Sung;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.481-486
    • /
    • 2008
  • Standard Estimating System, which can be used for estimating a construction cost, has been pointed out having some problems such as non-reflecting a variety of construction environments and site conditions, non-adapting new technologies and methods since it was established in 1970. For solving these problems, the Korean Institute of Construction Technology(KICT) has chosen organizations for amending Standard Estimating System. However they have had many mistakes in the process of amending works because of non-establishing amending process and absence of the depreciation measurement method. This research derived the necessity to improve the amending process of the Standard Estimating System, and presented the detailed amending process and the performing method in the each process. Furthermore, this research proposed the depreciation measurement method available for the construction industry by means of analyzing researches that performed in the manufacturing industry and the measurement method for depreciation of general accounts.

  • PDF

A Study on the Regulation for Mental Healthcare Facility and Delivery System in China (중국의 정신의료시설 및 지원체계에 관한 법제도 연구)

  • Gao, Wen Mei;Yun, Woo Yong;Chai, Choul Gyun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.24 no.1
    • /
    • pp.7-14
    • /
    • 2018
  • Purpose: This study analyzes mental healthcare delivery services and types of facilities, the status of installation and operation, and planning standard. The purpose of the study is to propose a basic data for the performance of related research and work tasks, along with an understanding of the Chinese mental healthcare facility type and support system. Furthermore, it will show a lack of current function management as the changes of mental health concept and demand for services increases, and it is intended to provide implications for the construction of mental health facilities. Methods: This study was conducted by a research on law and regulation of China's mental healthcare delivery service system and mental healthcare facility. The analyzed data are the national standard GB, the optional national standard GB/T, the building construction standard JGJ, and the report issued by the Health Planning and Development Committee. Results: At present mental healthcare facility construction in China is in the period of rapid development and it exposes the layout of medical facilities, which is not currently reasonable and the service does not reach the designated position and so on. Overall, it requires more detailed guidelines to enhance the quality of mental healthcare service. Implications: It is expected that the research of this paper will provide effective reference for future research on Chinese Mental healthcare system and facilities, and can promote construction of Chinese mental healthcare facility theory in perfect condition.

Constructability and Cost Analysis of the Clip-Type Binding Implement Substituting 135° End-Hooked Transverse Reinforcement in Reinforced Concrete Columns (철근콘크리트 기둥의 띠철근에서 135° 갈고리 대체 클립형 연결장치의 시공성 및 비용 분석)

  • Park, Koung-Yeun;Yun, Hyun-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.5
    • /
    • pp.459-469
    • /
    • 2020
  • The purpose of this study is to secure the same or more structural performance and constructability for the detail off hooks cross-constructed at 135° used as external-ties standard detail in reinforced concrete columns, therefore, to the purpose of improving constructability, The clip-type binding implement was suggested. the experiment on the constructability evaluation and cost analysis of the clip-type binding implement by 90° end-hooked transverse reinforcement in reinforced conrete columns was carried out. The results of the analysis confirmed that standard detail column took about an one hour regardless of the diameter of tie. When using the clip-type binding implement, It was reduced to about 50% of the standard detail column. and regardless of the building size, it was most effective for the cost down when using the clip-type binding implement 1ea, it was about 32% fo labor cost reduction effect in comparison with using standard detail. as a result, Using the clip-type binding implement is shown be very effective in the working time and construction cost reduction.

Process Standardization for the Construction of Job-Exposure Matrix Using the Work Environment Measurement Database (작업환경측정 결과 데이터베이스를 활용한 직무노출매트릭스 구축을 위한 공정 표준화)

  • Sangjun Choi;Ju-Hyun Park;Dong-Hee Koh;Donguk Park;Hwan-Cheol Kim;Dae Sung Lim;Yeji Sung;Kyoung Yoon Ko;Ji Seon Lim;Hoekyeong Seo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.1
    • /
    • pp.78-90
    • /
    • 2023
  • Objectives: The purpose of this study is to standardize the process code of the work environment measurement database (WEMD) for the construction of a job-exposure matrix (JEM). Methods: The standard process code (SPC) was reclassified based on process similarity and drawing upon the code used in the existing K2B. It was supplemented through review by industrial hygiene experts. In addition, an index word database related to SPC was created and used for SPC search. A pilot evaluation project was conducted by experts to evaluate the validity of the newly reclassified standard process code. Results: A total of 70 final SPCs were developed, including 31 processes related to the construction industry. Using the Shiny program, we developed a standard code finder that can be used on the web (https://kscf.shinyapps.io/scf_app/). As a result of the pilot evaluation, it was determined that it was easier to search for standard codes than previous codes, so it was highly utilized. Conclusions: It is expected that JEM construction using industry-process information drawing on WEMD data will be possible using the 70 newly standardized process codes.

Standardization for Post-Construction Evaluation Report (건설공사 사후평가결과보고서 표준화 방안)

  • Kim, Kyong hoon;Lee, Chankyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites (소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader (시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임)

  • Han, Ye-Ryeong;Park, Hee-Sung;Chang, Chul-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.105-111
    • /
    • 2009
  • Construction equipment is a very important factor for successful construction. Also, the cost for construction equipment is a major part of the cost of construction. Therefore, the estimation of the equipment cost is a critical task in construction planning. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability and cost. Although the performance of the equipment has improved over time, the variables in the formula have not been updated in a timely manner. Therefore, this paper has analyzed the preceding research, and performed several site visits to measure the cycle time of a backhoe and a loader. Construction equipment production rates were calculated with collected cycle times and variables given in 'Standard Unit Labor'. In addition,production rates were estimated considering the circumstances of various sites with the simulation program 'crystal ball.'

A Study on Establishment of Construction CALS Standardization system (건설CALS 표준화 체계 정립에 관한 기초적 연구)

  • 이상호;김명원;김봉근;유인채
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.141-154
    • /
    • 2001
  • This paper presents a fundamental study to establish a standardization system of the Construction Continuous Acquisition and Life-cycle Support(CALS). States of standardization in the Construction CALS were reviewed to find some defects in developing CALS system in construction industry. It is analyzed that three of major parts were needed to put up a standardization system for the Construction CALS. Firstly, the range of Construction CALS standardization is set up by identifying of Construction CALS and defining the standard and standardization. Secondly, the strategy to enable more effective implementation of Construction CALS standardization and the relationship of the concerned system presented can be used for establishing the Construction CALS standardization system. In addition, the spread and application device is proposed for using Construction CALS standards at public institutions and construction related companies. Conclusively, a classification system of the Construction CALS standards was proposed and some objects to be standardized were presented in the classification system. What were studied in this paper will provide the primary information and guidance to develop a guideline for standardization of the Construction CALS.

  • PDF