• Title/Summary/Keyword: Construction Stage Analysis

Search Result 923, Processing Time 0.031 seconds

Numerical Study of Structural Behavior of Underground Silo Structures for Low-and-Intermediate-level Radioactive Waste Disposal Facility (중저준위 방폐물 처분 사일로 구조물의 구조거동 수치해석 연구)

  • Kim, Sun-Hoon;Kim, Kwang-Jin
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.3
    • /
    • pp.183-190
    • /
    • 2022
  • The construction of an underground silo structure was the first stage of erecting the Gyeongju low-and-intermediate-level radioactive waste disposal facility. The facility, completed in 2014, has a scale of 100 000 drums and is currently in operation. The underground silo structure, 25 and 50 m in diameter and height, respectively, consists of cylindrical (for storing waste packages) and dome parts. The dome is divided into lower (connected to the operation tunnel) and upper parts. The wall of the underground silo structure is an approximately 1-m-thick reinforced concrete liner. In this study, finite element analysis was performed for each phase of the construction sequence and operation of the underground silo structure. Two-dimensional axial symmetric finite element analysis was implemented using the SMAP-3D program. Three-dimensional finite element analysis was also performed to examine the reliability of the two-dimensional axial symmetric finite element model. The structural behavior of the underground silo structure was predicted, and its structural safety was examined.

Quantification of the CO2 Footprint in Residential Construction

  • Don Mah;Juan D. Manrique;Haitao Yu;Mohamed Al-Hussein;Reza Nasseri
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.525-536
    • /
    • 2009
  • The current residential process adheres to a traditional method of construction involving wood framing on-site on poured concrete foundations which has been widely applied in North America. A conventional residential construction process can include seventeen distinct stages ranging from stake-out to pre-occupancy inspection. The current practice possesses short comings including high construction material wastes, long scheduling timelines, adverse weather conditions, poor quality, low efficiencies and negative environmental impacts from transportation and equipment use. Over CAN $5 billion dollars was spent in the construction sector during 2007 in Canada. Previous findings in CO2 emissions during the construction process of a conventional dwelling emphasize more than 45 tonnes of CO2 emissions. Hence, in Alberta alone during 2007, almost 50,000 residential units would release more than two million tonnes of CO2. These numbers demonstrate the economical and environmental impact in building construction and its relationship with CO2 emissions. The aim of this paper is to quantify the CO2 emissions from the current residential construction process in order to establish the baseline for CO2 emission reduction opportunities. The quantification collection methodology will be approached by identifying the seventeen various stages of construction and quantifying the contributions of CO2 from specific activities and their impacts of work for each stage. The approach of separating these into separate stages for collection will allow for independent opportunities for analysis from various independent contractors from the entire scope of work. The use of BIM will be implemented to efficiently quantify CO2 emissions. Based on the CO2 quantification baseline, emission reduction opportunities such as an industrialized construction process will be introduced that allows homebuilders to reduce the environmental and economical impact of home construction while enabling them to produce higher quality, more energy efficient homes in a safer and shorter period of time.

  • PDF

Risk Influencing Factors in Performance of River Disaster Prevention Project (하천재해예방사업의 성과에 미치는 리스크 영향요인)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.417-428
    • /
    • 2020
  • The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.

Comparative Analysis of BIM Acceptance Factors between Korea and China (한국과 중국의 BIM 수용영향요인 비교분석)

  • Song, Jingxu;Lee, Seulki;Yu, Joungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.3-14
    • /
    • 2021
  • In the Chinese construction industry, the utilization of Building Information Modeling (BIM) aims to increase the total output of the construction industry by solving the problem of inefficient interoperability in the construction industry. In 2011, the Chinese Ministry of Housing and Urban-Rural Development despite the technical advantages of BIM and the government policy, the BIM adoption rate in China is lower than 45%. Meanwhile, as the South Korean construction industry is a step ahead of its Chinese counterpart in introducing and utilizing BIM, it is expected that BIM is more actively utilized and accepted in South Korea than in China. According to a comparative study based on the hype-cycle theory, South Korea is at a more advanced stage of introducing BIM, than in China. This study aimed to suggest how to increase BIM utilization rates in China. To this end, this study comparatively analyzed factors affecting BIM acceptance between China and South Korea. For the comparative analysis of the BIM acceptance factors between China and South Korea, literature reviews on the technology acceptance model (TAM) and BIM acceptance model were carried out, and based on that, the BIM acceptance factors were classified. Other BIM acceptance factors were also added and considered, as they reflected Chinese national characteristics and construction industry. As for the derived BIM acceptance factors, construction project participants, especially actual BIM users in China and South Korea, were targeted for the survey. A t-test using SPSS 22.00 was carried out to identify significant differences in data. Finally, based on the t-test results, this study suggested ways of improving the BIM utilization rate in China. Based on the findings, this study is expected to contribute to activating BIM adoption in the Chinese construction industry and also to set a theoretical foundation for future studies on BIM utilization in the industry.

Infiltration behaviour of the slurry into tunnel face during slurry shield tunnelling in sandy soil (사질성 지반에서 이수식 쉴드 TBM 적용시 굴진면으로의 이수 침투특성에 대한 해석적 고찰)

  • Roh, Byoung-Kuk;Koh, Sung-Yil;Choo, Seok-Yeon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.3
    • /
    • pp.261-275
    • /
    • 2012
  • This paper presents numerical analysis of the mud cake infiltration behaviour which is influenced tunnel face stability during excavation by slurry shield TBM. This analysis method can make useful data to select proper shield TBM type and to set up the construction plan. But effective analysis did not proposed until now. In this paper, we carried out numerical analysis using by $PFC^{2D}$ fluid coupling simulation which is suitable for sandy soil modelling. As a analysis result, we checked that the slurry infiltration behaviour varied with soil permeability and slurry characteristic(specific weight, viscosity etc). This analysis method is helpful safety excavation through anticipating the proper slurry viscosity at the design stage and verifying the slurry quality at initial excavation stage.

Driveability and Bearing Capacity Characteristics Analysis of 590 MPa Grade High Strength Steel Pipe Pile at Songdo Area through Dynamic Load Tests (동재하시험결과 분석을 통한 송도지역 590MPa급 고강도 강관말뚝의 항타관입성 및 지지력 특성 분석)

  • La, Seung-Min;Hong, Bong-Kyun;Yoo, Han-Kyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.2
    • /
    • pp.81-90
    • /
    • 2011
  • Domestic usage of high strength steel for pile has been limited to steel with yield strength (YS) of 490 MPa. However, design and construction cases abroad show beneficial usage of steel pipe with YS ranging in 500~700 MPa. In this study, YS 590 MPa steel pipe has been tested for driven pile foundation in Songdo area. Pile dynamic analysis (PDA) was carried out for 18 piles of which 16 piles have been reviewed for comparison of the PDA test results with those of GRLWeap analysis using SPT N value. Back analysis of PDA analysis was also carried out to narrow the deviation of standard SPT N value used in GRLWeap analysis. A regression equation is suggested for the shaft and toe resistance according to SPT N values for future GRLWeap analysis that can be used in the designing stage at Songdo area.

Analytical Correction Method Based on a Comparison of the Column Shortening Measurement-Prediction in Tall Buildings (고층 건축물의 기둥축소량 계측-예측의 비교를 통한 해석보정 방안)

  • Song, Eun-Seok;Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.32 no.6
    • /
    • pp.391-399
    • /
    • 2019
  • In this study, an analytical method was proposed to correct the analysis results and minimize the errors between column shortening predictions and real values in high-rise buildings. In this regard, the construction sequence analysis of 41-story reinforced concrete buildings was performed and the results were compared to four assumed field measurements that were divided into the column and the core. The analysis correction was applied at a stage over the error limit in the column and at all stages in the core. Since the error occurred continuously after the analysis was corrected, additional corrections of the analysis resulted in a smaller error. By applying the proposed analytical correction method, it was confirmed that the long-term shortening value can be accurately predicted.

A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work (철근콘크리트 공사의 작업 생산성 분석을 위한 3차원 객체 활용 정보관리 시스템 구축방안)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.15-24
    • /
    • 2018
  • Despite the recognition of the need for productivity information and its importance, the feedback of productivity information is not well-established in the construction industry. Effective use of productivity information is required to improve the reliability of construction planning. However, in many cases, on-site productivity information is hardly management effectively, but rather it relies on the experience and/or intuition of project participants. Based on the literature review and expert interviews, the authors recognized that one of the possible solutions is to develop a systematic approach in dealing with productivity information of the construction job-sites. It is required that the new system should not be burdensome to users, purpose-oriented information management, easy-to follow information structure, real-time information feedback, and productivity-related factor recognition. Based on the preliminary investigations, this study proposed a framework for a novel system that facilitate the effective management of construction productivity information. This system has utilized Sketchup software which has good user accessibility by minimizing additional data input and related workload. The proposed system has been designed to input, process, and output the pertinent information through a four-stage process: preparation, input, processing, and output. The inputted construction information is classified into Task Breakdown Structure (TBS) and Material Breakdown Structure (MBS), which are constructed by referring to the contents of the standard specification of building construction, and converted into productivity information. In addition, the converted information is also graphically visualized on the screen, allowing the users to use the productivity information from the job-site. The productivity information management system proposed in this study has been pilot-tested in terms of practical applicability and information availability in the real construction project. Very positive results have been obtained from the usability and the applicability of the system and benefits are expected from the validity test of the system. If the proposed system is used in the planning stage in the construction, the productivity information and the continuous information is accumulated, the expected effectiveness of this study would be conceivably further enhanced.

Development of Business and Performance Record Standard Template for Rail Infrastructure BIM Performance Management (철도인프라 BIM 성과관리를 위한 업무 및 성과기록 표준 템플릿 개발)

  • Shin, Min-Ho;Kim, Hwan-Yong;Choi, Young-Woo;Han, Sang-Cheon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.50-59
    • /
    • 2020
  • Recently, the government has actively promoted the introduction of BIM at the national level to improve the efficiency and productivity of the construction industry, and private interest in the application of BIM has also increased. However, despite the large amount of references and information, not much research has been done in quantitative ways to accurately measure the performance of BIM projects. The purpose of this study is to review performance measurement cases using ROI, investment effect analysis, and queue model analysis using domestic and overseas BIM guideline research and to present standard templates that can quantitatively measure BIM performance records according to domestic conditions based on this. Performance measurement trends and cases according to the application of BIM were analyzed, and nine quantification elements were derived from this, and based on this, a performance measurement data collection template at the BIM life cycle stage was prepared. Detailed items and contents were prepared for the nine quantification elements, and the final template consisted of a total of 43 questions, divided into the entire stage (15), the beginning (8), the middle (8), and the latter (12) areas. It is expected that by using the standard template of railway BIM performance records developed in this study, the BIM design stage will be diagnosed and the deficiencies will be supplemented, which will be the basic data for measuring actual quantitative performance in all life cycle performance of future BIM projects.

Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments (공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석)

  • Lee, Jin-Eung;Kim, Byung-Yun;Jeong, Byung-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.491-500
    • /
    • 2015
  • This study investigated defect status by work type, based on the report data of defect inspection results, acquired by consumers' request to safety inspection agencies, before the expiration of legal defect repair warranty period. In fact, the data was not acquired by centering on suppliers, namely, construction companies in relation with the defects becoming causes to increase construction cost of apartments. This study aims to provide objective and basic data for quality improvement at construction stage and for solution to defect disputes. The study results are presented below: (1) The number of defect cases occurring from architectural work among total work types were 1,986, defect occurrence rate was 62.5%, and defect repair cost was KRW $25,851/m^2$, which stood at 78.2% of the total work types. This means the defect occurrence rate and defect repair cost in architectural work are bigger than those of other work types. (2) Major defects in architectural work were revealed in the following order: cracks from frame work, inferior interior finishing work, inferior finishing work of plaster/masonry works, water leak/damage from waterproof work and withering/omission from landscape work. The total repair cost of the major selected defects was KRW $12,220/m^2$, and was analyzed to take up 37% of the total defect repair cost.