• Title/Summary/Keyword: Construction Stage Analysis

Search Result 927, Processing Time 0.03 seconds

Productivity Analysis of the Site Installation Stage of Laminated Modular Multi-Family Housing (적층식 모듈러 공동주택 현장설치 단계의 생산성 분석)

  • Park, Moon-Sun;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.5
    • /
    • pp.519-527
    • /
    • 2019
  • This study was conducted to present useful information on the utilization and productivity analysis of laminated modular multi-family housing. To this end, the process of site installation was investigated and analyzed through a prior study, and the monitoring survey was conducted through the site installation case of an stacked multi-family housing. Based on the above, the results of productivity analysis using the web-cyclone technique were also presented. However, the site installation process has limitations on generalisation because the process is not the same for each construction company, and also limits that require verification through application in the actual site of the web-cyclone model presented in this study.

Bearing Capacity and Control Method of Driven Piles (기성말뚝의 지지력 거동해석과 시공관리방안)

  • 박영호;김경석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.249-258
    • /
    • 1999
  • Dynamic load and static load tests are performed on steel pipe piles and concrete piles at five construction sites in highway to compare the difference of load bearing mechanisms. At each site, one steel pile is instrumented with electric strain gages and dynamic tests are performed on the pile during installation. Damages of strain gages due to the installation are checked and static test is performed upon the same pile after two or seven days as well. It shows that load transfer from side friction to base resistance behaves somewhat differently according to the results of load-settlement analysis obtained from PDA and static load test. Initial elastic stage of load settlement curves of two load tests is almost similar. But after the yielding point, dynamic resistance of pile behaves more stiffer than static resistance, thus, dynamic load test result might overestimate the real pile capacity compared with static result. Analysis of gage readings shows that unit skin friction increases exponentially with depth. The skin friction is mobilized at the 1∼2m above the pile tip and contributes to the considerable side resistance. Comparison of side and base resistances between the measured value and the calculated value by Meyerhof's bearing capacity equation using SPT N value shows that the calculated base resistance is higher than the measured. Therefore, contribution of side resistance to total capacity shouldn't be ignored or underestimated. Finally, based upon the overall test results, a construction control procedure is suggested.

  • PDF

$LCCO_2$ Comparison of Existing Apartment Housing and Environment-Friendly Apartment Housing (기존 설계기준 아파트와 친환경 저에너지 아파트의 $LCCO_2$ 비교)

  • Kim, Yu-Min;Sohn, Jang-Yeul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.4
    • /
    • pp.234-240
    • /
    • 2010
  • In October 2009, the Ministry of Land Transport and Maritime Affairs noticed 'Environment-friendly housing construction standards and performance' to build energy saving environment-friendly housings (Green Homes) for the reduction of energy consumption and carbon dioxide emission. In this study, the $CO_2$ emissions were evaluated during the life cycle of the existing apartments which were built in 1980's and Green Home apartment. $LCCO_2$ was evaluated by dividing the life cycle into three stages which are construction, maintenance and destruction stage. $CO_2$ emission from the materials for improving insulation performance was estimated by Input-output analysis. As a result, in 40 year-life cycle of $84\;m^2$ apartment, 400.68 T-$CO_2$ was emitted from 1980's apartment, on the other hand 231.02 T-$CO_2$ was emitted from Green Home apartment.

A Prediction of the Mobilized Tensile Forces of Nailed -Soil Excavated Walls (Nailed -Soil 굴착벽체의 발휘인장력 예측)

  • 김홍택;성안제
    • Geotechnical Engineering
    • /
    • v.11 no.2
    • /
    • pp.79-98
    • /
    • 1995
  • In the present study an analytical modeling was carried out to predict mobilized shear strength at the interface between the nail and surrounding soils by carefully examining the behavior characteristics of nailed boil excavated walls. Based on the developed model of mobilized shear strength, the method of overall stability analysis of nailed -soil walls was also developed using the Morgentern -Price limit -equilibrium slice method. The developed analytical procedure could predict the behaviors of nailed -soil excavated walls during the successive excavation stages, at the final stage of construction and post -construction stages. To verify the validity of the developed model and method of stability analysis, mobilized tensile forces of nails and overal stability estimated by the developed procedure were compared with test measurements from three nailed -soil experimental walls having different soil conditions. The effect of seepage pressures inside the soil mass was considered in the developed procedure.

  • PDF

Types of Unfair Activity under Subcontracting and their Solutions: Qualitative Research Design

  • Ji-Heon HA;Tae-Hyung KIM
    • The Journal of Industrial Distribution & Business
    • /
    • v.14 no.8
    • /
    • pp.19-25
    • /
    • 2023
  • Using a procurement and construction stage emphasis on the capabilities of the Sub-Contractor (SC), the present research aims to discover the types of unfair activities between the Main Contractor (MC) and SC and their influence on project completion. This research also tries to figure out solutions which can reduce unfair activities between MC and SC. Research design, data and methodology: The qualitative textual analysis was selected for the current research and has been used by numerous previous researchers commonly to review relevant themes in the prior resources and suggested for researchers who conduct a reviewing procedure to analyze meta-analysis approach for figuring out better research findings from prior resources. Results: The result indicates the prevalence and consequences of bid shopping, emphasizing the need for transparency and fair bidding practices. Late payment issues were also found to be crucial for subcontractors' financial stability, urging the implementation of prompt payment legislation and agreements. Conclusions: In conclusion, the research revealed that subcontracting is common in construction projects, with general contractors relying on multiple subcontractors to carry out specific work items. The accomplishment of building projects hinges on the collaborative efforts between the main contractor (MC) and subcontractors (SCs), each focusing on different aspects of the project.

The Analysis of Railroad Operating Costs in Korean Railroad Projects

  • SungWook KANG;DongHee KIM;GyuBae KIM
    • East Asian Journal of Business Economics (EAJBE)
    • /
    • v.12 no.1
    • /
    • pp.35-42
    • /
    • 2024
  • Purpose: A railroad project is a complex system with large construction costs in the initial stage and ongoing operating costs over its lifecycle. Current railroad projects tend to be based on construction options, which leads to huge deficiencies in operating costs. This phenomenon results from a lack of appropriate tools to accurately estimate a railroad project's lifecycle costs. This study attempts to analyze the major components of railroad operating costs and to propose a decision-making system for analyzing the long-term lifecycle costs of railroad projects. Research design, data and methodology: We review the literature and analyze the current status of railroad operating costs in Korea and overseas. Based on previous projects, a framework for project options and operating costs is proposed. The framework is applied to actual railroad projects to demonstrate the validity of the model. Results: Case analysis shows that our framework is comprehensive in analyzing the primary aspects of railroad operating costs and plays an effective role in choosing various railroad project options. This study points out that the railway project operates inefficiently because estimating long-term costs without reflecting specific project options causes many errors. Conclusions: A major contribution of this study is the development of an improved framework for accurately estimating operating costs and providing policymakers and engineering firms with a holistic decision support system. Detailed components in estimating operating costs of the railroad business are discussed. And we present a decision-making tool that policymakers and private businesses can use in planning the railroad business.

A Study on the Analysis of the Present State of the Introduction of the BPM by Industrial Sector (산업부문별 BPM 도입 현황 분석에 관한 연구)

  • Choi, Yu-Jin;Lee, Chun-Kyong;Park, Tae-Kuen;Lim, Hyong-Chol;Choi, Yun-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.501-504
    • /
    • 2008
  • Recently, as a solution to adapt to changes in managerial environments, many companies introduce the BPM(Business Process Management) to achieve the standardization and optimization of internal/external company processes. The BPM is being highlighted compared to other managerial techniques for its diverse values such as fast responses to market changes, ensured transparency of processes, continued opportunities for improvements etc and the necessity is highlighted in the construction sector too. Therefore, this study compared the characteristics, effects of introduction and things to be improved between the BPMs introduced by various industrial sectors as an effort to establish a work process based managerial system in the construction sector and thereby drew 5 areas to be supported and compared analyzed the areas to be supported in various sectors by giving additional scores using the 3 scales method. This study is a stage to reflect the result in the construction sector where the introduction of the BPM is insufficient and by analyzing the characteristics and weak points of those BPMs introduced into various industrial sectors, this study expects effective BPM introductions and developments of construction companies.

  • PDF

Domestic Economic Effects of Overall Industrial Complex Construction - Based on the Induced Coefficients by Development Stage of Industrial Complex - (해외 산업단지 건설의 국내경제 파급효과 분석 - 산업단지 개발단계별 유발계수를 기준으로 -)

  • Choi, Myoungsub;Cho, Kang-Joo;Kim, Myeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.117-125
    • /
    • 2019
  • This study was aimed to derive measures for maximizing ripple effect of construction of overseas industrial complexes on domestic economy. The induced coefficients were estimated for each step of development of industrial complexes by applying the raw data of ICAK and the input-output mode. As a result, for urban service, the fraction of labor costs was high, and for civil engineering, the fraction of profit & loss was high. However, the proportion of intermediate and profit & loss was high in Architecture. Consequently, compare to the same type of overseas constructions, larger effects were seen at urban service in terms of employment, at civil engineering and architecture in terms of business, and at national economy in terms of architecture. These results suggest that in order to maximize ripple effect of construction of overseas industrial complex on domestic economy, it will be needed to seek an order strategy including not only simply sell a land and but also building factories in the industrial complex.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF