• Title/Summary/Keyword: Construction Stage Analysis

Search Result 923, Processing Time 0.029 seconds

A Study on the Characteristics of Friendly Building Techniques of Environment to Adapt to Climate (기후에 순응하는 환경-친화적 구축 기법 특성에 관한 연구)

  • Kim, Jung-Gon;Koh, Gwi-han
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.6
    • /
    • pp.3-10
    • /
    • 2013
  • This study intends to clarify the key elements of designing low energy residential building construction by planning out residential construction in nature oriented designing method utilizing nearby environment and nature oriented energy from designing stage instead of construction of low energy residential building. Development of building technology is proportional to the development of technology that lasts already. However, what is no less important than the advancement of technology, it is the study of fundamental phenomena energy use in response to climate, reduction, such as recycling. It is possible in such a purpose, it is assumed that there is a need to study elements implementation plan in accordance with the climatic characteristics of the study. Method for controlling the condition solar radiation, sunshine, depending on the characteristics of the weather, by utilizing the convection phenomenon of nature, to maintain the air comfort in the interior space is the essence of eco-friendly construction and passive Property This is an important architectural elements to be aim. For through the analysis of this case, corresponding to the phenomenon of the features of the macro climate and micro climate due to climate change, a combination building blocks of classification placement of each, shape, structure, elevation, space, of the material appeared in various it was possible to know the construction characteristics were. As shown in each case, construction method to address climate change has been found to apply to a comprehensive analysis climatic characteristics of each region, in response to this, the construction of element each corresponding.

An Analysis of the Importance of the Risk Factors Influencing the Calculation of the Subcontract Construction Bidding Cost (건설공사 하도급 입찰단가 산정에 영향을 미치는 리스크 요인의 중요도 분석)

  • Lee, Sung-Goo;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.109-117
    • /
    • 2007
  • The construction environment has the trend of oversizing and professionalizing, the increase of the construction period, and the risk factors and the uncertain factors which are important in the construction bid. The misunderstanding and the lack of knowledge of the subcontractor result in the decrease of the profit or the deficit. In conclusion, these are supposed to give the financial burden to the subcontractor. So, it is very important to predict the construction preparation cost calculation by the risk factors in the bidding stage and to calculate the bid unit cost considering the target profit of the subcontractor in the process of the mutual agreement and performance of the contract. In these points of view, this study analyzes how the importance of the risks influencing the bidding cost calculation affect the construction cost, and this analysis can be used as the basic data to establish the suitable bid strategy of the subcontractor.

Improvement of Safety Management and Plan by Comparison Analysis of Construction Technology Promotion Act(CTPA) and Occupational Safety and Health Act(OSHA) in Construction Field (건설기술진흥법과 산업안전보건법 비교분석을 통한 건설업 안전관리 및 계획의 개선방안)

  • Kim, Si Ouk;Yoon, Young Geun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.4
    • /
    • pp.37-46
    • /
    • 2021
  • According to the Korean Statistical Information Service, the number of fatal occupational accidents per 100,000 workers is the highest in Korea, among all the OECD countries. The safety of construction workers is managed by the construction technology promotion act (CTPA) and the occupational safety and health act (OHSA). A review of the current safety management laws is required to improve them for the construction industry, where the numbers of accidents and deaths are constantly increasing. Accordingly, the aim of this study was to identify the problems in unclear business areas through comparison and analysis of the CTPA and OHSA guidelines and establish effective site-dependent construction safety management plans. The overlapping safety and health management terms and tasks of organizations were derived along with identifying the overlapping items of the safety management and hazard and risk prevention plans. Based on these results, several improvements for the design stage, safety cost, and safety education have been suggested in this paper. In addition, an improved model based on the integration and an optimized compromise between these two laws for safety management in areas where many accidents have occurred in recent years has been reported here.

Construction Sequence Measurement & Analysis for Continuous 8-span Prestressed Concrete(PSC) Girder Bridge (8경간 연속화 프리스트레스 거더교의 시공 계측 및 분석 -서울교 확장교량 적용)

  • 조성웅;이원표;임현태
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.985-990
    • /
    • 2001
  • The widened Seoul-Bridge is the first continuous 8-span prestressed concrete(PSC) girder bridge in domain. The construction sequence of the bridge consists of S steps in a large way. The measuring in construction stage includes the determination of the allowable fluctuation value of beam stress in each step and the measurement beam stress during prestessing. The measured tendon prestress force was compared with the design value. When it was compared with the analytic result, the difference between the measured stress and the analytic stress was below allowable error. The friction loss and the anchorage slip loss of the tendon prestress force was lower than the design loss value.

  • PDF

Application for Self-Supported Retaining Wall Using Deep Cement Mixing (DCM(심층혼합처리공법)에 의한 자립식 흙막이 적용사례)

  • Jeong, Gyeong-Hwan;Kim, Yong-Wan;Shin, Min-Sik;Han, Kyoung-Tae;Kim, Tae-Hyo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.257-267
    • /
    • 2006
  • The earth retaining wall systems for excavation works in a populated urban area or a poor soil deposit can be limited due to various restriction. Thus there are various methods to be applied for them such as the soldier pile method, the diaphragm wall with counterfort and so on. In this study, the self-supported earth retaining wall using the DCM(Deep Cement Mixing) method, including its merits, demerits and some important characteristics occured in the design and the construction stage, was introduced. It might be reference for the other design and construction procedures using the DCM method.

  • PDF

An analysis study on earth pressure trends during construction of Gyungbu High Speed Railway using Concrete Track (콘크리트궤도 적용 경부고속철도의 시공 중 토압 경향 분석 연구)

  • Kim, Ki-Hwan;Kim, Dae-Sang;Na, Sung-Hoon;Shin, Ki-Dae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.671-679
    • /
    • 2010
  • The construction of concrete track for the first time in Korea gives lots of meanings to civil engineering in various aspects. Settlement level needs to be kept minimal for the safety of the track. Concrete track has different structural characteristics comparing to conventional ballast track, so load distribution in concrete track is also different. Since it is the first time to build concrete track, there are very few experience and data available on the subject. Therefore it is important to evaluate how much load is transferred to the ground due to the running vehicle in concrete track and to determine the optimal thickness of layers. In this research, 9 individual earth pressure cells were installed at OOOk930 site in 2nd stage of Kyungbu high speed railway during under construction. The in-situ pressure data were measured at each layers during pump-car and locomotive were moving on the high speed railway surface.

  • PDF

A Study on the Preference Analysis of Apartment Purchaser using AHP Method (아파트 수요자의 선호요소에 대한 AHP 분석에 관한 연구)

  • Chung, J.Young;Yoon, Tae-Kwon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.51-58
    • /
    • 2008
  • The paradigm shift in housing market has changed consumers' interests to the cost of housing, it is the mos important factor considered in purchasing house recently. In this study, some factors influencing on the cost o: housing and some preference factors considered in purchasing house are analyzed. The AHP(Analytic Hierarchy Process) is used to analyze preference factors. The results of this study can be used as a decision maker in the initial planning stage of construction industry.

Quantifying the Value of Floats (작업여유시간의 가치 정량화 방법론)

  • Park, Young-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.123-124
    • /
    • 2015
  • The project participants make use of floats for their benefits. The owner may consume floats in an event of issuing change order(s) and may avoid the risk factors attributed by them; the contractor may reduce activities' costs by substituting the activity with alternative construction method and by leveling the resources, hence consuming floats. There are a lot of disputes and claims involved in the float ownership issue. The ownership of floats should be stipulated in the contract stage. To alleviate these disputes and claims, it is commendable to develop a computational method that quantifies the float value. This paper presents the method that computes the values of total floats which changes over the project life span. The system calculates CPM, compute the ratio of area of banana curve which is enclosed by earliest start curve and latest start-curve.

  • PDF

The Analysis about Present Condition of Recycled Aggregate Production Facilities (재생골재 생산 시설의 현황 분석)

  • Jeong, Ji-Yong;Lee, Sea-Hyun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.11a
    • /
    • pp.901-904
    • /
    • 2006
  • The government makes efforts to expand the recycling activities of construction waste soil and to increase the usage of recycled aggregate. Accordingly, it has defined the compulsory usage and quality standard by usage of recycled aggregate. To satisfy these efforts requires both technology to produce recycled aggregate which meets the required quality and companies with the technology. Therefore, it requires to review a current status of facilities at the companies which deal with construction wastes. The companies dealing with construction wastes gradually produce the high quality of recycled aggregate. In particular, companies which has over 3-stage processing system for waste concrete continue to increase and means to remove foreign substances are gradually improved.

  • PDF

USING QUANTITY ESTIMATE STATISTICAL MODELS FOR INFRASTRUCTURE LONG RANGE COST MANAGEMENT

  • Jui-Sheng Chou;Min Peng;James T. O'Connor;Khali R. Persad
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.808-813
    • /
    • 2005
  • Effective cost management requires reliable cost estimates at every stage of project development. The primary purpose of this research is to develop systematic modeling procedures and an automatic computing program for infrastructure estimating in the Texas Department of Transportation (TxDOT). The computing system toggles between project input information and segregated district unit prices for highway work item quantity estimates associated with earthwork and landscape, subgrade treatments and base, surface courses and pavement, structures, miscellaneous construction, and lighting, signing, markings and signals. This quantity-based approach was chosen because of the conventional approach lacking of quantity information until primary design is complete.

  • PDF